
Shilpa Layout Flyover ready to ease traffic
HYDERABAD: The six-lane bi-directional Shilpa Layout Flyover (Phase-2), connecting Gachibowli to Kondapur, is complete and ready for inauguration.
Once opened to the public, the flyover will ease traffic flow at Gachibowli Junction by facilitating conflict-free movement between the Outer Ring Road (ORR) and Kondapur, and also improves connectivity between Hitech City and the Financial District.
Chief Minister A Revanth Reddy is expected to inaugurate the flyover in the first week of June. The flyover, part of the Strategic Road Development Programme (SRDP), was built at a cost of `178 crore. It spans 1.20 km in length and 24 metres in width with six lanes. It is a third-level structure built above two existing flyovers — the Gachibowli Junction Flyover and the Shilpa Layout Phase-1 Flyover. With this, 37 out of 42 SRDP works have been completed.
GHMC Commissioner RV Karnan recently inspected the project and instructed engineers to finish the remaining work promptly.
Meanwhile, Karnan has asked SCR officials to complete the railway portions of the Falaknuma and Shastripuram ROBs in the next two to three months. The Falaknuma ROB is scheduled for completion by the end of July and the Shastripuram ROB by the end of August. Their completion will bring the total number of completed SRDP works to 39.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hans India
10 hours ago
- Hans India
Think out of box to meet future needs of Hyd'bad denizens: CS to planners
Chief Secretary Ramakrishna Rao has emphasised the critical need for advanced planning to efficiently meet the future requirements for basic amenities for citizens, given the exponential growth of Hyderabad and its surrounding areas. The Chief Secretary further explained that these reviews of local bodies are being undertaken as per the instructions of Chief Minister A Revanth Reddy. Accompanied by MAUD (Municipal Administration and Urban Development) officials and the Rangareddy District Collector, the Chief Secretary visited Shamshabad Municipality and conducted a review meeting. During the session, the Chief Secretary ascertained information regarding the Municipal Corporation's jurisdiction and population. Furthermore, he reviewed the services being extended by the Municipal Council to its citizens, including water supply, street lighting, drainage networks, and Sewage Treatment Plants (STPs). The Chief Secretary stressed the importance of effective property tax collection to finance various activities undertaken by the Urban Local Body (ULB). Following the review meeting, the Chief Secretary visited the Eco Park developed by the Hyderabad Metropolitan Development Authority (HMDA) across approximately 85 acres at Kothwalguda, at a cost of Rs 75 crore. He inspected various components of the park, such as boardwalks, the bird aviary, the arrival plaza, and other landscaped facilities. This park is slated to be opened to the public within two months by the Chief Minister, once the finishing works of the arrival plaza are complete. The Chief Secretary also visited the Budvel layout, currently under development by HMDA. The Municipal Commissioner of HMDA explained the salient features of the layout, including multiple use developments and infrastructure in the form of wide roads (45m and 36m), as well as other proposed trunk infrastructure like water supply, drainage, and underground electrification.


Time of India
12 hours ago
- Time of India
Telangana developers body bats for suburban master plan of Hyderabad; calls for balanced growth & equal infrastructure
Telangana Developers Association (TDA) has urged the Telangana government to develop a suburban master plan for Hyderabad, ensuring balanced expansion across the city's four sides HYDERABAD: The Telangana Developers Association (TDA) has suggested that Hyderabad should have a suburban master plan to facilitate balanced expansion on all four sides of the city. The TDA suggestion was in light of the Telangana govt starting the exercise to prepare the master plan for Hyderabad metropolitan region 2050 a few months ago. In a letter to chief minister A Revanth Reddy, TDA president GV Rao and secretary Srinivas Goud said that to ensure sustainable growth, the carrying capacity of future satellite cities should be meticulously calculated based on the ideal population density for each area, with infrastructure development planned accordingly to support long-term stability and scalability. 'High density will result in harsh conditions as we are experiencing in Bengaluru and Delhi. All four corners of the city should have civil infrastructure of the same level with health, education and employment-generating corridors such as IT,' Rao said. TDA president said that as the city and suburban areas' population is growing by three lakh every year, the govt has to plan water for such a huge future population. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Investire è più facile che mai BG SAXO Scopri di più Undo 'The govt has to audit present supply capacity, drinking and industrial water requirements in the future by appointing expert consultancy or any university on water requirements of the city for the next 50 years,' he said. They also said that the Regional Ring Road (RRR), Future City and Metro Rail expansion would be a game changer . RRR has great potential to increase Hyderabad's economic activity , they said.


United News of India
a day ago
- United News of India
Plan ahead for growing Hyderabad: Emphasises Telangana CS Ramakrishna Rao
Hyderabad, June 20 (UNI) Telangana Chief Secretary Ramakrishna Rao on Friday emphasised the need for proactive planning to meet the growing demands of Hyderabad and its surrounding areas. Addressing officials during a review meeting at Shamshabad Municipality, the Chief Secretary highlighted the importance of efficient civic services like water supply, drainage, street lighting, and property tax collection. He stated that Hyderabad's rapid urban expansion requires local bodies to plan ahead for infrastructure and basic amenities. The review, conducted as per the directive of Chief Minister A Revanth Reddy, focused on improving grassroots governance and service delivery. Following the meeting, the Chief Secretary visited key HMDA projects, including the 85-acre Eco Park at Kothwalguda, Budvel multi-use layout with direct ORR access, and the newly constructed Neopolis trumpet interchange built to AASHTO standards. These infrastructure projects, aimed at improving connectivity and livability, are set to be inaugurated soon by the Chief Minister. UNI VV GNK