West Lafayette granted $581K from Indiana's Community Crossings for road construction
WEST LAFAYETTE, Ind. — Indiana Gov. Mike Braun has announced more than $200 million will be shelled out in matching grants through the Community Crossings programs, with West Lafayette to see a sizable amount.
The city of West Lafayette will receive $581,082.70, according to a news release, to be used for repairing road infrastructure throughout the city.
Natalia Bartos, West Lafayette city engineer, said the money will be put toward several projects, one of which will be for "asphalt rejuvenation" on Fowler Avenue.
This project, Bartos said, involves applying an asphalt rejuvenator to a 316-foot-long section of Fowler Avenue to preserve its good condition and delay future deterioration.
Another area where the money will be used, Bartos said, is milling and resurfacing of several roads. Among those slated for work are Northwestern Avenue, Littleton Street, South Street and Chauncey Avenue.
This work will include the removal of 2 inches of asphalt, which are then replaced, Bartos said, along with localized patching to address structural deficiencies.
The Community Crossings Matching Grant program, according to the Indiana Department of Transportation's website, matches up to $1.5 million annually when localities invest in road and bridge repairs. The program was established by the Indiana General Assembly in 2016.
Counties with populations fewer than 50,000 and cities and towns with populations fewer than 10,000 receive a 75%/25% match, INDOT's website said, while counties with populations greater than 50,000 and cities and towns with populations greater than 10,000 receive a 50%/50% match.
"Traffic control measures will be in place for all projects to ensure public safety during construction," Bartos said. "The city is committed to maintaining our infrastructure proactively, and this grant funding plays a key role in supporting those efforts."
Jillian Ellison is a reporter for the Journal & Courier. She can be reached via email at jellison@gannett.com.
This article originally appeared on Lafayette Journal & Courier: West Lafayette receives $581K from state grant for resurfacing roads
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Chicago Tribune
a day ago
- Chicago Tribune
I-Pass event helps drivers learn about Illinois Tollway's new transponders
Between his business and personal uses, Adam Bartos of Barrington is responsible for six vehicles, and all of them are driven at times on the Illinois toll roads. When the Illinois Tollway began switching from transponders to Sticker Tags, allowing drivers to pay tolls on their I-PASS account electronically, Bartos started to have challenges when a new tag did not work. First learning about the change in December when a letter arrived from the tollway authority with the Sticker Tag included, Bartos said it did not work. He called the tollway, and a new one was sent. He was unable to get it to function as well. Learning about an I-PASS Event in nearby Wauconda, Bartos went with all six transponders and information on all six vehicles with hopes of walking away with Sticker Tags and ridding himself of the transponders. He learned about the event from state Sen. Darby Hills, R-Barrington Hills. 'I was done in five to 10 minutes,' Bartos said. 'They took care of me and fixed it all up.' Scores of people received free Sticker Tags for their vehicles and returned their transponders for recycling on Tuesday at the Wauconda Township office, acquiring the latest technology for paying tolls in the state's tollways. Taking office in February after the retirement of former state Sen. Dan McConchie, R-Hawthorn Woods, Hills said she got the idea to hold the Sticker Tag event because it was a way to make something necessary easier for her constituents. 'This is an opportunity to turn in their transponders and get the new Sticker Tag,' Hills said. 'When they turn in their transponders, they get a $10 credit on their account. This is a way to make something easier for my constituents.' Kim Johnson, Hills' events and engagement coordinator, said 166 people came to the event, returning 290 transponders and those who needed it, receiving the Sticker Tags. As people entered the room, they were greeted and escorted to a tollway representative — there were seven there sitting on one side of a long table—to get their Sticker Tag, return their transponder, or both. It took between five and 10 minutes. 'Everything was very seamless,' Johnson said. 'There were no quirks. This is a good way to get to know the people in the district.' Good on the Illinois tollways, the Sticker Tags can also be used on 34 toll roads around the country, including the Chicago Skyway and the Indiana Toll Road, according to the Illinois Tollway Authority's website. Once installed, tollway authority spokesperson Dan Rozek said, once the Sticker Tag is applied to the windshield, tolls will be recorded by embedded identification within the sticker itself. He recommends replacing them if a person gets a new vehicle. Should a person rent a car, transponders are movable from one vehicle to another. Rozek said they can log into their account online, enter the rental license plate number, and the dates they will be using the temporary vehicle. For people like Chris Lawler of Wauconda, the event was a chance to 'get rid of my transponder.' Brenda Jentink of Wauconda Township said initially she had some concerns, but they were alleviated. A Barrington Hills trustee before her appointment to the Illinois State Senate, Hills said occasions like the sticker event are an opportunity to interact with her constituents. Her 26th State Senate District has more than 50 times as many people as Barrington Hills. 'I hope to do more events like this, like a Mobile DMV,' Hills said. 'I may do an I-Cash event,' she added, referring to efforts of the Illinois State Treasurer to help people learn they have money sitting in an account in the treasurer's office. 'Town Halls are a good way of meeting people, too.'


The Hill
2 days ago
- The Hill
Braun says he has ‘no interest' in White House bid
Indiana Gov. Mike Braun (R) sought to tamp down a report that he is interested in running for president, in remarks to reporters Thursday. 'That's had nothing to do with anything I've said,' Braun told the Indiana Capital Chronicle, a nonprofit news site covering state government, in response to a question about a potential presidential run. 'I'm concentrating on being governor, and have no interest in that.' Politico reported in early June that Braun had discussed the idea of mounting his own presidential campaign, citing three unnamed Republicans close to the governor. Braun previously served as a U.S. senator for one term, and in Indiana's statehouse from 2014 to 2017. He maintained that his focus was on the governorship, the Indiana Capital Chronicle reported. 'I'm focused on being the most entrepreneurial governor we've got in this country,' Braun told the outlet. 'We've been doing things bolder than what most states would do and going after tough issues like health care, education, workforce.' Braun recently appeared at an event with Health and Human Services Secretary Robert F. Kennedy Jr., that announced that Arkansas, Idaho and Utah would no longer permit soda and candy to be purchased with food stamps. As governor, he has also issued a number of executive orders, ranging from declaring there are only two genders to prohibiting collective bargaining among state employees.
Yahoo
3 days ago
- Yahoo
Significant lane and ramp closures scheduled for I-465, I-69 starting June 20
Significant lane and ramp closures on I-465 eastbound may disrupt traffic patterns this weekend as the Indiana Department of Transportation's Clear Path 465 project continues. The closures will help construction crews work on new pavement, bridges and noise walls beginning June 20, according to an INDOT press release. Scheduled closures may take place at different days or times if inclement weather occurs. The following closures are scheduled: 9 p.m. to 6 a.m. Friday, June 20 The left lane of I-465 westbound from the main interchange to the White River bridge 9 p.m. Friday, June 20 to 6 a.m. Monday, June 23 The Keystone Avenue ramps to I-465 eastbound The ramp to Allisonville Road on I-465 eastbound The ramp connecting I-465 eastbound to I-69 northbound The ramp to Binford Boulevard southbound on I-465 eastbound All lanes except one I-465 eastbound from White River to I-69 9 p.m. to 6 a.m. Saturday, June 21 Binford Boulevard northbound to I-69 northbound at 75th Street The left lane from the I-465 northbound ramp to I-69 northbound All lanes except one on I-69 northbound from the main interchange to 82nd Street This article originally appeared on Indianapolis Star: I-465, I-69 lanes and ramps to close starting June 20, INDOT says