logo
From sledgehammer blast mining for iron ore to precision mining with gold, NMDC eyes big critical minerals move

From sledgehammer blast mining for iron ore to precision mining with gold, NMDC eyes big critical minerals move

Time of India09-06-2025

HYDERABAD: When India's largest iron ore miner, NMDC Ltd, made a strategic foray into gold mining in Australia in November 2023, the company's managers believed they had nothing new to learn.
After all, they were in the mining business for the past six decades.
What they didn't anticipate was that their traditional blast and grab operation was of no use in gold mining, and for the first time, they were forced to acquire new skills—the precision of a surgeon needed for vein mining. This new skill is also giving the Navratna PSU specialised knowledge needed for deep-seated critical minerals extraction.
Today, NMDC has not only mastered the art of vein mining but is also all set to rake in its first set of profits from mining this precious yellow metal through its Australian arm, Legacy Iron Ore Ltd, after the initial setbacks.
'The last two-three months we turned around and were cash positive. If things continue the way they are going right now, we should be in the green this year (2025-26),' Amitava Mukherjee, chairman & managing director, NMDC Ltd, told TOI in an exclusive chat recently.
Mukherjee said the diversification into gold mining has been a strategic learning curve for the company, with its Mt Celia gold mine in Australia, though relatively small in scale, serving as a crucial learning ground.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
2025 Top Trending local enterprise accounting software [Click Here]
Esseps
Learn More
Undo
"It was a very conscious forward point. In the last 60 years, we did bulk mining of iron ore, which is completely different from vein-type, deep-seated mining. When we went ahead with this project, we found we had no expertise in this type of mining," Mukherjee said. Explaining the unique challenges this type of mining poses, he said the gold deposits at Mt Celia have veins as thin as one to two meters, requiring precise extraction techniques.
This is in stark contrast to NMDC's traditional iron ore mining operations, where bulk extraction methods are employed.
"In iron ore mining, you would blast from left to right throughout. But in gold mining, blasting has to be absolutely controlled. It has to be precise because all you have is just two meters. The moment you dilute it, the grade drops from 2 gm to 1 gm per tonne," Mukherjee said. 'You have to spot it correctly; the size of the equipment has to be very correct.
Every aspect of vein mining and deep-seated minerals mining is completely different,' he added.
He said the decision to start small with Mt Celia, which has reserves of around 8,000 tonnes, was conscious. 'As a matter of strategic forward thinking, we started with a very small gold tenement at Mount Celia. So if we lose, we lose less money. Let's not start with a Rs 1000 crore sort of investment, we thought,' he explained.
The Mt Celia mine currently produces gold ore with grades ranging from 1.5 to 2.1 grams per tonne, which Mukherjee described as "pretty good in gold mining.
"
Having mastered precision vein-mining, NMDC is now looking to expand its gold mining portfolio, with several tenements adjacent to Mount Celia under consideration. "We have a lot of gold tenements which are pretty good for us. However, we decided to start with Mount Celia's Blue Peter and Kangaroo Bore pits to gain experience first," Mukherjee said.
Apart from Mt Celia, it also has Yilgangi, Yerilla, Patricia North, and Sunrise Bore in Australia.
While acknowledging the initial losses, he said NMDC remains confident about the long-term prospects of its gold mining operations. "I'm not really bothered about that Rs 150 crore or Rs 160 crore losses that we made. What we lost, we'll gain next year," Mukherjee stated, emphasising the strategic value over short-term financial results.
NMDC, which acquired a 50% stake in Legacy Iron Ore in 2011 and has been steadily hiking its stake, currently holds over 92.84% stake in the Australian company with plans to take this up to 100% over a period of time.
NMDC's experience in gold mining is expected to play a crucial role in its future diversification plans, particularly in mining other strategic minerals that require similar precision mining techniques, he indicated.
The company views this as a necessary evolution in its mining capabilities that will help it position itself for opportunities in various strategic critical minerals, Mukherjee said, pointing out that minerals like lithium require the same set of expertise.
Gold and lithium are among the 10 critical minerals that NMDC has decided to focus on. These also include copper, coking coal, nickel, manganese, dolomite, bauxite, and cobalt.
'As a company, we have been mandated by the board to focus on these 10 minerals, which includes our bread and butter iron ore and other critical minerals. We are very clear we are not going to do rare earth minerals,' he said.
This foray has also meant the setting up of new operational divisions and acquisition of specialised expertise in NMDC. The company has established a dedicated team for precision mining operations, marking a departure from its traditional bulk mining focus.
Stay informed with the latest
business
news, updates on
bank holidays
and
public holidays
.
AI Masterclass for Students. Upskill Young Ones Today!– Join Now

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

ACB arrests AMC estate inspector in disproportionate assets case
ACB arrests AMC estate inspector in disproportionate assets case

Indian Express

time31 minutes ago

  • Indian Express

ACB arrests AMC estate inspector in disproportionate assets case

The Gujarat Anti-Corruption Bureau (ACB) arrested an estate inspector of the Ahmedabad Municipal Corporation (AMC) for alleged possession of disproportionate assets (DA) to the tune of Rs 3.07 crore, according to a statement. The ACB statement issued on Thursday stated that the accused Jignesh Surendra Shah, a Class-2 Estate/TDO Inspector of East Zone of the AMC, was booked and arrested for the alleged possession of disproportionate assets (DA) to the tune of Rs 3.07 crore, which it alleged was 102.47% disproportionate to his known sources of income. According to the statement, the ACB conducted its preliminary inquiry based on an application it received regarding Shah's allegedly disproportionate assets. The ACB said that the period of investigation ranged between April 1, 2012 and March 31, 2022, during which the officer had allegedly used unlawful means to accumulate disproportionate assets. The investigation is being carried out by ACB Police Inspector VD Chaudhary. Further probe into the matter is underway.

Strict action will be taken against projects lacking proper permissions, says HYDRAA chief
Strict action will be taken against projects lacking proper permissions, says HYDRAA chief

Time of India

time37 minutes ago

  • Time of India

Strict action will be taken against projects lacking proper permissions, says HYDRAA chief

Hyderabad: At the Times Home Hunt Property Expo held recently, Hyderabad Disaster Management and Asset Protection Agency (HYDRAA) commissioner A V Ranganath cautioned that any new projects lacking proper permissions or built on encroached land will face strict action. 'Only layouts approved before HYDRAA's formation on July 19 last year will be exempt. All others must comply with current regulations,' said Ranganath, noting that unchecked construction contributed significantly to urban issues like flooding and traffic congestion. HYDRAA was set up not just as a watchdog, he said, but also as a proactive body aimed at promoting sustainable and responsible urban development. 'HYDRAA is not just about demolitions. We are focused on creating a healthier, more environmentally conscious real estate ecosystem,' Ranganath added. The authority is working closely with other agencies to rejuvenate lakes, address urban flooding, and improve drainage infrastructure. He also pointed out that traffic congestion alone costs the state nearly Rs 300 crore in infrastructure loss, underscoring the need for better planning. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với mức chênh lệch giá thấp nhất IC Markets Đăng ký Undo 'We received criticism that HYDRAA slowed real estate activity, but there were geopolitical concerns, delays in RERA clearances, and approval bottlenecks at GHMC and HMDA—also played a role. If a project is legally approved, we won't interfere. Our aim is to ensure compliance and environmental responsibility,' he said.

JDA to construct 71 sector roads
JDA to construct 71 sector roads

Time of India

time38 minutes ago

  • Time of India

JDA to construct 71 sector roads

Jaipur: With city roads deteriorating due to potholes, craters, and uneven surfaces, the Jaipur Development Authority (JDA) has decided to construct 71 sector roads under its annual road maintenance programme. Though these roads were part of the Master Plan 2025, the JDA had been unable to execute them earlier due to various delays. Now, a portion of the road maintenance fund will be allocated for their construction. "We have four categories of sector roads – A, B, C, and D. Out of 226 proposed A and B category roads in the Master Plan, 71 will now be developed. The civic body has already granted administrative and financial approval of Rs 454 crore for the project," a senior JDA official said. During the previous Congress govt, sector roads were prioritised by category, with 'A' being the most critical. A JDA engineer added that these 71 roads were selected based on future traffic needs and planned settlements along both sides. "Several rounds of discussions were held between zone deputy commissioners and zonal engineers to finalise the list of sector roads. We also considered the availability of land and the number of encroachments to be removed before selection. Hopefully, construction will proceed smoothly," said a JDA engineer. Officials confirmed that out of the 71 sector roads, six will be developed near Niwaru Road and Govindpura, 13 near Muralipura, nine in Mansarovar and Bhankrota, two near Delhi and Agra Roads, and 16 in the Vartika area. "Tenders have already been floated for some of them," an official added.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store