logo
Solving sabah's water woe in stages

Solving sabah's water woe in stages

Daily Express17 hours ago

Published on: Sunday, June 22, 2025
Published on: Sun, Jun 22, 2025
By: Ricardo Unto Text Size: Shahelmey inspects repair works on a leaking pipe. SABAH's effort to overcome its longstanding water supply problem is progressing in phases under a strategy that targets meeting statewide demand until at least 2050, according to Deputy Chief Minister cum State Works Minister Datuk Shahelmey Yahya. He said the Sabah Water Department (JANS) has laid out short-, medium- and long-term action plans to resolve the issue progressively, adding that the entire effort requires substantial funding. 'The solution to Sabah's water supply issue is an ongoing process that requires significant financial resources,' he said, stressing the phased approach is necessary to ensure sustainability and resilience in infrastructure. Shahelmey said the treated water shortage is unlikely to be significantly reduced until several major long-term water supply projects are completed, to ensure consistent supply beyond 2050. He acknowledged public frustration over water and road issues but cautioned against turning dissatisfaction with essential services into a political tool ahead of the State election expected this year. 'Dissatisfaction with services related to public needs should not be used as a political benchmark,' he said, noting that public infrastructure projects are executed continuously for the people's welfare.
Advertisement He added that it remains the duty of each implementing agency to resolve issues concerning public amenities such as water and roads in a systematic and sustained manner. Shahelmey identified two major factors contributing to Sabah's water supply challenges – a growing demand that exceeds production capacity and high levels of non-revenue water (NRW) caused by leakage and illegal tapping. 'The water shortage and insufficiency in Sabah are mainly due to two factors: demand exceeding the current production capacity and high levels of non-revenue water across the State,' he said. He said JANS is tackling the problem through the construction of new water treatment plants (WTPs), upgrades to existing facilities, active pipe leak detection and repair, and the replacement of ageing pipelines. He added that illegal connections are also being targeted through enforcement operations, especially in high-activity areas where such cases are prevalent. The department is also engaged in the selective replacement of old and vulnerable pipelines based on urgency and area-specific needs, he said. Five major water projects are currently underway involving four WTPs and one dam, aimed at boosting supply in key districts across Sabah. Shahelmey said the Telibong II Phase 2 WTP in Tuaran, which will double its capacity from 80 million litres per day (MLD) to 160 MLD, is now 88 per cent complete and scheduled for completion by July this year. The Kogopon 2 WTP expansion project in Papar is 37 per cent complete and is targeted for completion by July 2026, including supporting pipelines and storage infrastructure. Meanwhile, Phase 1 of the Lahad Datu Water Supply System upgrade, with a capacity of 60 MLD, is also 88 per cent complete and expected to be ready by July 2026. He said the 5 MLD Mamut WTP in Ranau, which will support the district's growing population, is nearly complete at 95 per cent and should be operational by December this year. In Tawau, construction of the Tawau Dam with a 30 million cubic metre capacity is 53 per cent complete and is expected to finish by July 2026, adding a significant reserve for the district. Shahelmey said these completed facilities are expected to meet water needs in their respective districts for the foreseeable future, although local development rates could influence future demand. 'Upon completion of the construction and upgrading of the water treatment plants, the water supply in Sabah is expected to meet demand in those areas for the next several years,' he said. He added that while current projections show improved capacity, planning must remain flexible to accommodate future changes in demographics and economic growth. On alternative water solutions, he said the department is currently studying the feasibility of coastal reservoirs as an option in areas where dam sites are no longer viable. However, he cautioned that while coastal reservoirs are viable in principle, they pose long-term operational challenges due to their higher maintenance costs. 'The proposal to build coastal reservoirs is still under consideration by the Sabah Water Department,' he said. Shahelmey also confirmed that tapping underground water sources remains on the table, but emphasised that this depends on the availability and sustainability of underground reserves in proposed areas. 'Groundwater sources are among the options considered, but feasibility depends on the site conditions and volume of underground reserves,' he said. He added that a comprehensive site assessment is necessary before any groundwater extraction plans can be implemented to avoid environmental and technical complications. RM300m from Federal Govt insufficient for long-term plan THE RM300 million allocation from the Federal Government to address Sabah's water woes is insufficient to fully implement the State's long-term action plan, said Shahelmey. He said the funds, announced by Prime Minister Datuk Seri Anwar Ibrahim last year, only cover short-term measures proposed by the Sabah Water Department (JANS) and do not represent a comprehensive solution. 'The RM300 million allocation... only covers part of the original action plan and is limited to short-term solutions,' Shahelmey said in response to questions on whether the State would again need to intervene as it did during the Universiti Malaysia Sabah (UMS) student protest. He explained that a considerable amount of mechanical and electrical equipment needs to be repaired or replaced to prevent further supply disruptions, which in turn demands a substantial operating budget. 'Replacement works need to be conducted continuously and will require a significant operating budget,' he said, noting that efforts to address water issues are constrained by funding. Shahelmey added that the department has established short-, medium-, and long-term strategies to upgrade water supply across Sabah, but implementation has been hindered by limited financial resources. 'JANS recorded over 90 per cent expenditure performance for each allocated budget annually,' he said, 'but due to financial constraints and limited allocations, not all plans could be executed on schedule and had to be phased in.' He said the RM300 million announced earlier does not include the allocation for UMS and was not channelled through the State Government, but directly to the university. The RM300 million for JANS, he clarified, was in the form of a federal loan and is part of short-term programmes for various districts, separate from the university's water needs. 'In essence, the RM300 million allocation by the Federal Government is unrelated to UMS,' he said. Shahelmey said the total cost of all water supply programmes by JANS under the 12th Malaysia Plan is designed to span five years and involves both State and Federal allocations. He declined to provide a specific estimate on the total sum needed for 2025 alone, stating instead that resolving the issue demands ongoing funding to sustain system maintenance and prevent more severe breakdowns. On past water contract cancellations, he said JANS was left without personnel or skilled operators to run affected plants, due to the abrupt termination of agreements by the previous administration. 'For JANS, the immediate impact was the absence of personnel or skilled workers to take over the operations of the plants affected,' he said. He also confirmed that problems in districts such as Kudat and Sandakan are due to a mix of factors, including the termination of contracts and other operational and environmental challenges. 'Water supply issues in Kudat and Sandakan are due to multiple factors, including the direct or indirect termination of concessions, as well as technical issues and raw water pollution,' he said.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

‘Sabahan No 1' not an empty slogan, says Salleh
‘Sabahan No 1' not an empty slogan, says Salleh

Free Malaysia Today

time7 hours ago

  • Free Malaysia Today

‘Sabahan No 1' not an empty slogan, says Salleh

Sabah BN treasurer Salleh Said Keruak said the state party moved in tandem with the federal unity government. (Bernama pic) PETALING JAYA : 'Sabahan No 1' is not an empty slogan for Barisan Nasional as it represents the party's struggle to give priority to the interests of the people of Sabah, according to Sabah BN treasurer Salleh Said Keruak. Speaking to Umno members in Benoni, he said BN relied on hard work and perseverance, rather than populist sentiment or material inducements, with 'not just promises, but actual delivery'. Salleh, who is state assemblyman for Usukan, said: 'We don't come with money, but with spirit and hard work.' His remarks come a week after Sabah chief minister Hajiji Noor reiterated his stance that local parties should lead and dominate Sabah politics. While he acknowledged cooperation with national parties, Hajiji maintained that ultimate political control should remain in the hands of Sabahans themselves. Salleh, who has previously asserted that the struggle for the state's rights is not the domain of any one party but of all Sabahans, said Sabah BN moved in tandem with the federal unity coalition government, to ensure Sabah had a decisive voice in national affairs. Last week, Sabah BN chairman Bung Moktar Radin called for a straight contest between BN and the ruling coalition GRS at the next state elections. He said cooperation could be considered after the elections. GRS deputy secretary-general Armizan Mohd Ali said that Bung's proposal was reasonable and should be honoured as the only way to resolve the conflict between the two coalition parties.

No coalition partner should act like ‘big brother', says Salleh
No coalition partner should act like ‘big brother', says Salleh

Free Malaysia Today

time7 hours ago

  • Free Malaysia Today

No coalition partner should act like ‘big brother', says Salleh

Sabah BN treasurer Salleh Said Keruak, a former chief minister, said the new formula was about 'political accommodation' and not merely power-sharing. (Bernama pic) PETALING JAYA : No party in Barisan Nasional should act like a 'big brother', Sabah BN treasurer Salleh Said Keruak said today, revealing that the coalition was looking into a new formula for power-sharing in the state government. Salleh, a former chief minister, said Sabah BN was exploring a new formula that would ensure fair political representation among the state's diverse communities, the New Straits Times reported. The new formula was not just about power-sharing, but 'political accommodation,' he was quoted as saying. 'We feel that in any coalition, no party should act like a 'big brother'. We need a formula that can satisfy everyone.' When asked what formula he had in mind, Salleh said Sabah BN would use past models as a guide. He said previously Bumiputeras were divided into Muslims and non-Muslims. 'We should discuss (the matter) so that we can consider Bumiputera to mean both Muslim Bumiputera and non-Muslim Bumiputera.' Salleh also said BN was preparing a draft commitment for Sabahans to tackle the state's fundamental issues, which he personally pledged to lead.

Federal-Sabah ties must be inter-governmental, not intra-party, says Armizan
Federal-Sabah ties must be inter-governmental, not intra-party, says Armizan

Free Malaysia Today

time7 hours ago

  • Free Malaysia Today

Federal-Sabah ties must be inter-governmental, not intra-party, says Armizan

Armizan Mohd Ali said GRS's 'Sabah first' model does not reject cooperation with national parties, but lays the foundation for local parties to form the backbone of the state government. (Bernama pic) PETALING JAYA : Cooperation between the federal and Sabah governments must take place on an inter-governmental and not intra-party basis, according to Gabungan Rakyat Sabah deputy secretary-general Armizan Mohd Ali. Armizan, who is also the domestic trade and cost of living minister, said GRS's 'Sabah first' model does not reject cooperation with national parties, but lays the foundation for local parties to form the backbone of the state government. 'This approach is crucial to ensure that federal-state relations are conducted on an inter-governmental basis, not an intra-party one,' he said when opening the annual meeting of the Parti Gagasan Rakyat Sabah's Darau division today. 'This is because we want issues concerning state interests to be negotiated and resolved through formal channels between the federal and state governments, not within the internal mechanisms of a single party.' Armizan, who is also the Papar MP, said that when the same national party becomes the core of both the federal and state administrations, there is a tendency for issues affecting the state to be discussed and decided within party lines. 'If state matters are resolved through an intra-party process, the risk is that party interests will be prioritised over state interests. More worryingly, some national parties are deeply entrenched in a doctrine that places loyalty to the party above all else, without compromise,' he said. He also said there have been instances when state issues are sidelined simply because the national party prioritises national interests above state concerns. 'A clear example of this is the decades-long struggle over the Malaysia Agreement 1963. Only recently have we seen meaningful federal commitment on MA63 under the leadership of Prime Minister Anwar Ibrahim. 'However, we cannot rely solely on the attitude or style of individual leaders, what we need is a structural solution,' he said. He said if there is a framework to ensure that federal-state relations remain inter-governmental in nature rather than intra-party, then state interests will always remain a priority. The state government, meanwhile, must function with state interests as its top priority. 'To national parties, (I say) lead the federal government. We will support and work with you. But let local parties lead the state government. This is the spirit behind the GRS and Pakatan Harapan Plus coalition government we have today,' he said. Sabah Barisan Nasional treasurer Salleh Said Keruak said yesterday the 'Sabahan No 1' is not an empty slogan for BN as it represents the party's struggle to give priority to the interests of the people of the state. Salleh, who had previously asserted that the struggle for the state's rights is not the domain of any one party but of all Sabahans, said Sabah BN moved in tandem with the federal unity coalition government, to ensure the state had a decisive voice in national affairs.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store