logo
Dubai to deploy thousands of workers to ensure cleanliness during Eid Al Adha

Dubai to deploy thousands of workers to ensure cleanliness during Eid Al Adha

Khaleej Times04-06-2025

Dubai Municipality will deploy a field team of 2,800 engineers, supervisors, inspectors, and specialised workers to ensure public health, safety, and environmental cleanliness across public spaces, facilities, and events this Eid Al Adha.
Comprehensive cleaning campaigns have already been conducted across Eid prayer grounds, public facilities, gathering points, green spaces, and main and secondary roads, Dubai Municipality said on Wednesday ahead of the long weekend that starts on June 5.
'Waste storage containers have also been strategically placed across vital areas to accommodate increased waste volumes during the holiday. The teams are responsible for overseeing field operations, supported by a fleet of 752 fully equipped vehicles and machinery,' the civic body added.
Dubai Municipality noted it has increased readiness at public beaches, including those designated for night swimming such as Jumeirah 2, Jumeirah 3, and Umm Suqeim 1.
Specific beaches have been allocated exclusively for families to regulate beach access and ensure that residents and visitors enjoy a safe, smooth, and fully integrated recreational experience at Dubai's beaches.
The Municipality called on the public to cooperate with official guidelines to support community safety and public order.
The Municipality also confirmed that its call centre will operate 24/7 throughout the holiday period. Reports or inquiries related to food safety, public health, or municipal services can be submitted via the 'Dubai 24/7' app or by calling 800 900.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Al Tareq Star officially launches Norah Residence in the heart of Jumeirah Village Circle
Al Tareq Star officially launches Norah Residence in the heart of Jumeirah Village Circle

Khaleej Times

time6 hours ago

  • Khaleej Times

Al Tareq Star officially launches Norah Residence in the heart of Jumeirah Village Circle

Al Tareq Star, a leading real estate developer with a wide range of businesses and activities in Saudi Arabia, has announced strategic expansion plans in the UAE. These plans include launching a portfolio of real estate development projects across key locations in the country. As part of this expansion, the company has officially launched its first residential project in Dubai – Norah Residence – a smart and contemporary residential development in the heart of Jumeirah Village Circle, one of the city's fastest-growing residential areas. Jumeirah Village Circle is known for its high rental returns, increasing end-user demand, and strong appeal as a high-yield investment option for those seeking quality living, comfort, and community connection. The location also provides easy access to key highways including Sheikh Mohammed Bin Zayed Road, Al Khail Road, and Hessa Street, ensuring strong connectivity to Dubai's main destinations. The neighbourhood offers a growing mix of restaurants, cafés, retail centres, wellness and fitness facilities, and is home to popular hospitality destinations such as FIVE JVC. Norah Residence was developed in collaboration with the award-winning architectural firm NAGA Architects. The project includes 183 carefully designed units ranging from studios, one-bedroom, two-bedroom, two-bedroom duplex, and three-bedroom duplex apartments. The development combines smart home technologies with refined interior designs and provides a distinctive lifestyle experience. Residents enjoy access to recreational facilities including a cinema lounge, café, gym, yoga hall, and a children's play area. The units offer peaceful views overlooking the pool, Halfa Park, and the panoramic skyline featuring the iconic FIVE JVC hotel. Unit prices start at Dh650,000, with a special 40/60 payment plan, offering an attractive investment opportunity for both residents and investors seeking long-term value in Dubai's real estate market. The project is scheduled for handover by the end of Q2 2027. Norah Bint Tareq Bin Ali Al Tamimi, vice-chairperson of Al Tareq Star, said: 'At Al Tareq Star, we believe that housing goes beyond walls and structures. It creates a complete environment that supports growth and wellbeing. With Norah Residence, we were committed to delivering an urban model that reflects a modern quality of life. This project embodies our vision and mission to build contemporary communities.' With a strong legacy of over 80 years of combined experience in Saudi Arabia, Al Tareq Star continues to lead as a developer that merges cultural depth with innovation in modern design. Norah Residence marks the company's latest milestone and its debut project in Dubai.

How did US carry out strikes on Iranian nuclear sites?
How did US carry out strikes on Iranian nuclear sites?

The National

time11 hours ago

  • The National

How did US carry out strikes on Iranian nuclear sites?

US B-2 bombers and Washington's 'bunker-buster' bombs were involved in the attacks on Iran 's nuclear sites on Sunday, US officials have told American media outlets. Those bunker-busters were widely seen as the best chance of damaging or destroying the Fordow nuclear enrichment site, as it is deep underground. Israel's military is believed not to possess weapons capable of disabling the facility. The US is also the only military capable of dropping the bombs, and the movement of B2 stealth bombers towards Asia on Saturday had signalled activity by Washington. 'Bunker buster' is a broad term used to describe bombs that are designed to penetrate deep below the surface before exploding. In this case, it refers to the latest GBU-57 A/B Massive Ordnance Penetrator bomb in the American arsenal. The roughly 30,000 pound (13,600kg) precision-guided bomb is designed to attack deeply buried and hardened bunkers and tunnels, according to the US Air Force. It is believed to be able to burrow about 60 metres below the surface before exploding, and the bombs can be dropped one after another, effectively drilling deeper and deeper with each successive explosion. It was not clear how many were used in the Sunday morning attack. The bomb carries a conventional warhead, but the International Atomic Energy Agency has confirmed that Iran is producing highly enriched uranium at Fordow, raising the possibility that nuclear material could be released into the area if it was the GBU-57 A/B that was used to hit the site. However, Israeli strikes at another Iranian nuclear site, Natanz, on a centrifuge centre have caused contamination only at the site itself, not the surrounding area, the IAEA has said. US warplanes also hit Natanz on Sunday. In theory, the GBU-57 A/B could be dropped by any bomber capable of carrying the weight, but at the moment the US has only configured and programmed its B-2 Spirit stealth bomber to deliver the bomb, according to the air force. The B-2 is only flown by the US air force, and is built by Northrop Grumman. According to the manufacturer, the B-2 can carry a payload of 40,000 pounds (18,000kg) but the US Air Force has said it has successfully tested the B-2 loaded with two GBU-57 A/B bunker busters – a total weight of some 60,000 pounds (27,200kg). The strategic long-range heavy bomber has a range of about 11,000 kilometres without refuelling, and 18,500 kilometres with one refuelling, and can reach any point in the world within hours, according to Northrop Grumman.

Dubai: Do tenants have to pay for accidental damage during maintenance?
Dubai: Do tenants have to pay for accidental damage during maintenance?

Khaleej Times

time14 hours ago

  • Khaleej Times

Dubai: Do tenants have to pay for accidental damage during maintenance?

Question: I live in a two-bedroom apartment in Dubai. One of the major AC components was damaged due to something we did; so basically, it was our fault. Are we responsible for fixing it and covering the cost of the damages, or would this fall under regular maintenance? Answer: In Dubai, it is the responsibility of a landlord to carry out the maintenance and repair works of a rented apartment, unless agreed otherwise. This is in accordance with Article 16 of Law No. 26 of 2007 Regulating the Relationship between Landlords and Tenants in the Emirate of Dubai, which states, "Unless otherwise agreed by the parties, a landlord shall, during the term of the lease contract, be responsible for the real property maintenance works and for repairing any breakdown or defect that affects the tenant's full intended use of the real property. Furthermore, a landlord may be responsible for rectifying any breakdown, damages or defects caused to a rented apartment and if such breakdown, damages, or defects are caused due to reasons which are beyond the control of a tenant. This is under Article 17 of the Dubai Rent Law, which states, 'A landlord may not make to the real property or any of its facilities or appurtenances, any changes that preclude the intended use of the same. The landlord shall be responsible for any such changes whether made by him or by any other person authorised by him. In addition, the landlord shall be responsible for any breakdown, impairment, defect, or damage sustained by the real property for reasons beyond the control of the tenant.' Stay up to date with the latest news. Follow KT on WhatsApp Channels. However, it is a tenant's responsibility to maintain the rented apartment in good condition and not to make any changes and/or carry out restoration or maintenance works without obtaining the permission of your landlord. This is in accordance with Article 19 of the Dubai Rent Law, which states, 'A tenant must pay the rent on its due dates and must maintain the real property in a good condition as a reasonable person would maintain his own property. Without prejudice to the tenant's obligation to carry out any restoration that is agreed upon or which is customary for tenants to undertake, the tenant may not make any changes or carry out any restoration or maintenance works in the real property without obtaining the permission of the landlord and the necessary licences from the competent official entities.' When a renting period ends, a tenant must return the property in the same condition it was received — except for normal wear and tear or damage caused by factors outside the tenant's control. If there's a disagreement about the property's condition, it will be resolved by the Rental Dispute Settlement Centre (the Tribunal). This is in accordance with Article 21 of the Dubai Rent Law, which states, 'Upon expiry of the term of a Lease Contract, the tenant must surrender possession of the real property to the landlord in the same condition in which the tenant received it at the time of entering into the lease contract, except for ordinary wear and tear or any damage sustained due to reasons beyond the tenant's control. Where a dispute between the parties arises in this regard, it shall be referred to the tribunal to issue its decision on the same.' Based on the aforementioned provisions of the Dubai Rent Law, it may be advised that where damage to a major AC component is caused by your own actions, the responsibility to repair or replace the damaged part may fall upon you, rather than being treated as routine maintenance typically handled by your landlord.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store