
TN showcases Rs 36,000 crore urban transformation drive as CM Stalin‘s Dravidian model of governance
The Tamil Nadu government on Sunday released a detailed report highlighting its extensive urban development efforts under Chief Minister M.K. Stalin's 'Dravidian Model' of governance, stating that the state is witnessing rapid urbanisation through focused and inclusive infrastructure investment.
According to the report, over Rs 36,000 crore has been committed to strengthening basic amenities across urban and semi-urban regions. Key among the initiatives is the implementation of 71 major drinking water supply projects at a cost of Rs 9,000 crore, benefiting more than 1.2 crore people across four Municipal Corporations, 13 Municipalities, 49 Town Panchayats, and over 10,000 rural habitations.
To improve sanitation infrastructure, Rs 1,777 crore has been allotted for 17 underground sewerage projects, while another Rs 6,655 crore is being invested in the integrated development of water bodies and public parks.
Highlighting the emphasis on connectivity, the report said the road infrastructure has seen a major push, with Rs 4,673 crore spent on upgrading over 9,000 km of urban roads, and Rs 3,057 crore sanctioned for 8,065 new roadworks.
The government has also constructed 28 new bus stands and approved 99 more, with a total allocation of Rs 1,120 crore.
Over 3.65 lakh streetlights and LED lighting systems have been installed across urban areas.
Under the Smart Cities Mission, 11 Corporations are undergoing development with a total investment of Rs 10,639 crore.
In suburban Chennai, more than 100 km of stormwater drains have been laid to mitigate urban flooding.
To boost educational infrastructure, the report said that 1,384 new classrooms have been added in Corporation and Municipal schools, and 100 libraries and knowledge centres are being set up across the state.
The Urban Employment Scheme has generated over 12 lakh man-days of work.
The report also notes the commissioning of Tamil Nadu's largest desalination plant at Nemmeli, which will provide drinking water to around nine lakh people.
In a move towards inclusive governance, new welfare schemes have been introduced to support sanitation workers in becoming entrepreneurs.
The government's grievance redressal platforms -- Makkaludan Mudhalvar and Mudhalvarin Mugavari -- have resolved over 98 per cent of citizen petitions, the release added.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
11 minutes ago
- Indian Express
‘Land acquisition issues, pending bills': Bengaluru's ‘Stonehenge' Ejipura flyover unlikely to be completed this year
Written by Bhoomika Roy Banerjee Taunted as 'Bangalore Stonehenge' and 'monument' on Google Maps, work for the Ejipura flyover in the city does not appear to be headed for completion anytime soon. With uncleared bills, land acquisition issues, and just 50 per cent of the construction complete over eight years, the flyover has been creating more troubles instead of easing congestion in the area. Meant to connect Kendriya Sadan in Koramangala to the inner Ring Road at Ejipura Junction, the flyover stretches across 2.5 km. Its construction was approved in 2014 and a tender was awarded in 2017 with a 30-month deadline. The project was supposed to be completed in November 2019 but the Bruhat Bengaluru Mahanagara Palike (BBMP) extended the deadline to December 2020 and imposed a penalty for delay. Despite protests from residents and elected representatives, nothing changed. However, after the Karnataka Congress government came into power, Deputy Chief Minister D K Shivakumar said in August 2023 that an additional Rs 141 crore was required for the project and assured to solve the problem soon. 'It is really unfortunate that the project has been delayed. I will ensure that it is completed,' he said then. Last month, Transport Minister Ramalinga Reddy said that around 50 per cent of the flyover's work was complete and the rest was underway. 'Initially, there was no need for land acquisition, but the BBMP still went ahead and notified 32 properties. Issues related to one property and the St John's (hospital) property are likely to be resolved in the coming days,' he said, adding that pending bills for the completed works will also be cleared soon. 'In view of the monsoon, I have instructed officials to lay an additional layer of asphalt under the flyover to ensure smooth traffic movement. We expect 90–95 per cent of the work to be completed by December,' he said. However, an official associated with the project said they are yet to iron out land acquisition issues. 'A portion of land close to St John's Hospital is yet to be acquired. A meeting has to be held with the stakeholders,' the official told The Indian Express. As of now, 416 segments out of the planned 762 have been cast, and 291 segments have been erected, according to the BBMP. On the ground, commuters and shopkeepers remain frustrated. While construction is going on, its pace is slow. Mohan Kumar, a traffic police constable stationed at the site, says, 'Peak traffic hours are from 8 am to 11.30 am and from 4.30 pm to 9 pm. It is always congested, and when it rains it becomes worse.' Muthu, an employee at TVS which is located near the construction site, said part of the flyover now passes in front of his shop, which is a sign of recent progress but beyond that point, there are 'just bare pillars.' Alim Pasha, manager of the long-standing Sapphire Gift shop in the area, said the situation has affected business, especially for smaller shops. 'Business has been bad, and people barely come. The store is mostly empty. Even if they come, it is mostly during the afternoon when the traffic is moderate. When it rains, the place in front of the shop gets clogged, so there is hardly any access. This flyover is a tragedy,' he said. Bhoomika Roy Banerjee is an intern with The Indian Express.


NDTV
20 minutes ago
- NDTV
Mahindra Scorpio N Likely To Get ADAS, Panoramic Sunroof Soon
Mahindra & Mahindra launched the Scorpio N in the Indian market in 2022. Since then, the SUV has received different updates and editions to keep it fresh for the consumers. Reports suggest that the automaker is planning on further updating the SUV with the addition of new features. These are the elements that are in demand and are available on most SUVs. The importance of these features can be understood by the fact that even Mahindra has been ensuring them in its various models. Starting with the details, the updated version of the SUV will come with new features for the safety and comfort of the occupants. It is to be noted that these revisions are likely to be incorporated without any changes in design. However, the brand might offer a new variant to accommodate them. With these changes, the SUV might be launched in the country around the festive season to ensure it gets good traction in the market. The first element to focus on is the inclusion of Level 2 ADAS features. This includes lane keep assist, high beam assist, lane departure warning, auto emergency braking, and more. Along with this, the brand is likely to add a panoramic sunroof to uplift the feel of the cabin, replacing the single-pane sunroof. These features have long been on offer on the XUV700 and have been included on the more recent models like XUV3XO and the Thar Roxx. Mechanically, there will be no changes in the Mahindra Scorpio N. It will continue to be sold with the 2.0-litre turbo petrol and 2.2-litre diesel engine, with options of MT and AT. Presently, it is sold at a starting price of Rs 13.99 lakh (ex-showroom) and goes up to Rs 25.15 lakh (ex-showroom) for the most expensive variant.


Indian Express
32 minutes ago
- Indian Express
Delhi govt's 45-point action plan to rejuvenate Yamuna, CM Rekha Gupta to monitor progress monthly
Delhi Chief Minister Rekha Gupta has launched a 45-point action plan to rejuvenate the Yamuna River. The directions aim to accelerate ongoing projects and ensure strict monitoring. According to a statement issued by the Delhi government on Friday, CM Gupta will personally inspect the progress on Yamuna cleaning every month, in what has been described as a mission of 'environmental and ethical responsibility'. Chairing a high-level review meeting with officials of the Delhi Jal Board (DJB) on Friday, CM Gupta reviewed budgetary allocations, project timelines, and progress across three key areas: water supply, sewerage network improvements, and the Yamuna revival plan. Delhi Public Works Department (PWD) and Water Minister Parvesh Sahib Singh also attended the meeting. The 45-point action plan covers drain treatment, treated water inflow into the river, solid and sewage waste management, septage and dairy waste disposal, riverfront development, stormwater planning, enforcement mechanisms, and public engagement. 'The rejuvenation of the Yamuna is not just a policy commitment—it is a moral duty. A clean and developed Delhi is possible only when every citizen has access to clean drinking water and efficient sewage systems,' the CM was quoted as saying, as per the government statement. According to the statement, 303 drainage projects worth Rs 8,000 crore are currently underway. These include de-silting works, permanent waterlogging solutions, pump house upgrades, and expansion of the stormwater network. The departments have been instructed to ensure timely and quality completion. Work is also ongoing to upgrade eight Sewage Treatment Plants (STPs), including those at Okhla, Keshopur, Yamuna Vihar, Nilothi, and Pappankalan. Additionally, the government plans to establish 40 new Decentralised STPs (DSTPs), 13 of which are under the AMRUT 2.0 scheme. The statement added that all unauthorised colonies must be connected with water and sewer lines by December 2027. Officials have been told to phase out old pipelines and prevent stormwater from mixing with sewage. The chief minister has urged the public to treat the Yamuna as a 'sacred heritage', She said the campaign would involve large-scale public awareness drives alongside technical and administrative measures.