
PSLV-C61/EOS-09 mission could not be accomplished: ISRO
The Indian Space Research Organisation (ISRO) could not accomplish its 101st launch, the PSLV-C61/EOS-09 mission, on Sunday (May 18, 2025).
Minutes after PSLV-C61 with the EOS-09 earth observation satellite lifted off from the Satish Dhawan Space Centre in Sriharikota at 5:59 a.m., the space agency said that the mission could not be accomplished due to an 'observation' in the third stage of the launch vehicle.
Some 17 minutes after lift off, the ISRO's PSLV rocket was to place the satellite into a Sun Synchronous Polar Orbit (SSPO). However the mission could not be accomplished.
'Today from Sriharikota the PSLV-C61/EOS-09 mission was targeted. the PSLV is a four stage vehicle and the second stage performance was quite normal. The third stage motor started perfectly but during the functioning of the third stage we are seeing an observation and the mission could not be accomplished. After analysis we shall come back,' ISRO chairman V. Narayanan said.
Today 101st launch was attempted, PSLV-C61 performance was normal till 2nd stage. Due to an observation in 3rd stage, the mission could not be accomplished. — ISRO (@isro) May 18, 2025
'Today 101st launch was attempted, PSLV-C61 performance was normal till 2nd stage. Due to an observation in 3rd stage, the mission could not be accomplished,' ISRO posted on X.
The EOS-09 is a repeat of EOS-04, designed with the mission objective to ensure remote sensing data for the user community engaged in operational applications and to improve the frequency of observation.
The space agency said that the spacecraft is configured using ISRO's RISAT-1 heritage bus, with most of the functional requirements of the Synthetic Aperture Radar (SAR) payload and the bus platform systems derived from the earlier ISRO missions.
The satellite weighing 1696.24 kg carries a SAR payload capable of providing images for various earth observation applications under all-weather conditions.
The EOS-09 is designed to provide continuous and reliable remote sensing data for operational applications across various sectors and has a mission life of five years.
The PSLV-C61 was the 63rd flight of the Polar Satellite Launch Vehicle and the 27th in the PSLV-XL configuration.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
2 hours ago
- Indian Express
Why Axiom-4 mission keeps getting delayed: Timeline of setbacks, new launch date
US space agency NASA recently announced the delay of the Axiom Mission 4 (or Ax-4) again due to operational concerns. Initially scheduled to launch on June 22, NASA opted to delay the mission yet again. The mission's SpaceX Falcon 9 rocket, and Dragon spacecraft, are still on their assigned launchpad, Launch Complex 39A, at Kennedy Space Center, Florida. NASA still hopes to have a new launch date in the next few days. The crew of Commander Peggy Whitson, Pilot Shubhanshu Shukla, and Mission Specialists Sławosz Uznański-Wiśniewski and Tibor Kamu, are set to remain in quarantine in Florida, in case a launch date is finalised. The mission is slated to be India, Hungary, and Poland's first government-sponsored flight in 40 years, and the three nations' second human spaceflight mission in history. The crew is expected to spend up to 14 days docked to the International Space Station (ISS) and carry out various scientific experiments. For India and Shubanshu Shukla, this mission would be the first time in 40 years that an Indian has been to space (after Rakesh Sharma's nearly eight-day voyage aboard a Russian Soyuz in 1984). It would also make him the first Indian to step foot in the ISS, and the first member of the Gaganyaan team to go to space. Here is a look at the delays that have stalled the mission launch and reasons why. The mission was scheduled to launch on May 29, but was delayed to June 8 due to 'observations in an electrical harness in the Crew Dragon Module' (as per ISRO) The Falcon 9 rocket was underprepared for launch, and was subsequently delayed to the next day. Due to unfavourable weather, the launch was delayed by a day again. An oxygen leak in the engine was detected, alongside an issue in one of the engine actuators. ISRO anticipated a swift resolution to the issue. The launch was once again delayed by a day. While on-ground readings were favourable, NASA announced work with the Russian Space Agency. They announced they were evaluating a 'new pressure signature', giving indications of a potential leak in the back section of the ISS Zvezda, one of Russia's modules in the ISS. A further delay in launch was also announced. Following discussions involving teams from ISRO, Poland, Hungary, consultations between Axiom Space, NASA, and SpaceX, and evaluations of factors such as weather and crew health, June 22 was announced as launch day. Two days before the launch date, NASA announced a further delay. 'The space agency needs additional time to continue evaluating International Space Station operations after recent repair work in the aft (back) most segment of the orbital laboratory's Zvezda service module.' NASA said in a press release dated June 19. However, NASA hopes to finalise a new launch date in the coming days. (This article has been curated by Purv Ashar, who is an intern with The Indian Express)


India Today
6 hours ago
- India Today
Nasa discovers big crater on the Moon. It was made by crashed Japanese spacecraft
Weeks after the Japanese spacecraft Resilience crashed on the Moon, Nasa has captured images of the debris. The spacecraft crashed on the Moon as it attempted a soft landing in the northern Lunar Reconnaissance Orbiter (LRO) captured photos of the site where the ispace Mission 2 attempted to land. LRO's right Narrow Angle Camera, one in a suite of cameras known as LROC, captured the image from an altitude of about 50 miles above the surface of Mare Frigoris, a volcanic region interspersed with large-scale faults known as wrinkle The dark smudge visible above the arrow in the photo formed as the vehicle impacted the surface, kicking up regolith — the rock and dust that make up Moon 'soil.' The faint bright halo encircling the site resulted from low-angle regolith particles scouring the delicate is not the only agency to have captured the images. India's Chandrayaan-2 orbiter also captured the images, however, Isro is yet to release them enthusiast Shanmuga Subramanian found the debris in the images captured by Chandrayaan-2's Orbiter High Resolution Camera (OHRC).The spacecraft was tagetting to land on the Moon's Sea of Cold in the Northern Hemisphere when Mission Control in Tokyo lost communications and telemetry with the after the spacecraft crashed on the Moon, ispace revealed the initial findings from data it received moments before the spacecraft had a hard landing on the laser rangefinder used to measure the distance to the lunar surface experienced delays in obtaining valid measurement values. As a result, the lander was unable to decelerate OHRC, with its impressive 0.25-meter resolution—the highest achieved by any lunar orbiter—provided the crucial data needed to pinpoint the crash Watch


News18
9 hours ago
- News18
Sparking Dreams: India Plans 100 Space Labs For Students From Tribal Communities
Last Updated: The initiative led by the Ministry of Tribal Affairs aims to inspire the next-generation of space explorers studying in 477 Eklavya Model Residential Schools across 26 states & UTs In a push to inspire the next generation of space explorers, the government will set up 100 space laboratories in Eklavya Model Residential Schools across India. First established in 1997-98 to provide quality education to tribal communities in remote areas, these fully-residential schools will now aim to spark children's ambition to reach for the stars. The initiative will be fully-funded by Corporate Social Responsibility (CSR) donors, and is set to benefit as many as 477 schools. The states expected to see the highest rollout include Chhattisgarh (75), Madhya Pradesh (63), Jharkhand (53), Odisha (47), Gujarat (38), and Maharashtra (37), and Rajasthan (30). The laboratories will be equipped with a star-tracker telescope, demonstrative models of ISRO's launch vehicles, including LVM Mk3, PSLV, as well as static models of earth observation satellites, GSAT, IRNSS, and space science books for students keen to read. The aim is to provide an interactive, hands-on learning environment to inspire students to explore careers in space and STEM fields. The National Scheduled Tribes Finance and Development Corporation (NSTFDC) under the Ministry of Tribal Affairs issued the tender on June 20, inviting agencies to submit their bids by July 10 to implement the project across India. Importantly, the laboratories will be established only through ISRO-recognised 'space-tutor' organisations to ensure quality and accuracy. 'The target is to enhance the quality of education by bridging the educational gaps and open new avenues for tribal youth in the fields of space science, technology, engineering, and math (STEM), through these Space Labs in Eklavya Model Residential School (EMRS) run by National Education Society for Tribal Students (NESTS), a society under Ministry of Tribal Affairs across 26 states and UTs," said the ministry. The implementing agencies, which must be at least five years old, will handle the procurement in line with the norms and also support NSTFDC in mobilising additional CSR support to expand the initiative. They will also be responsible for donor branding and outreach, including short videos, coffee table books and other promotional content. This comes as India prepares to launch some of its ambitious space missions, with ISRO's first-ever human spaceflight Gaganyaan scheduled to take off in 2027. After successfully landing near the South Pole of the Moon in 2023, the space agency is now working towards another Chandrayaan mission to collect and bring back lunar samples. Also in the pipeline is Bharatiya Antariksh Station to be set up by 2035. Gaganyaan astronaut designate Group Captain Shubhanshu Shukla, who has been selected to fly to the International Space Station as part of Axiom Mission-4, will also be interacting with students from various schools from space once the spacecraft docks into the ISS. The mission spearheaded by NASA, SpaceX and Axiom Space is currently without a launch date after being postponed multiple times. First Published: June 23, 2025, 09:32 IST