State must pay R26. 6m to motorist left a paraplegic after accident caused by pothole
A North West Province woman who is left a paraplegic after her car hit a pothole and overturned, is set to receive R26.6m in damages from the province's roads department.
Image: File
A pothole in the North West Province will cost the MEC of the Department of Public Works, Roads and Transport more than R26.6 million after a motorist was involved in an accident when she drove through the pothole, which left her a paraplegic.
The North West High Court, sitting in Mahikeng, ordered the department about three months ago to pay this amount to the plaintiff, only identified as Beauty. However, the department has to date not yet paid up.
Her attorney, Righardt Bezuidenhout, said the department promised that it would pay by Wednesday. However, by the time of publication, she has not yet been paid. When the department failed to pay her prior to now.
Bezuidenhout had obtained an order to attach the assets of the provincial department, to sell at auction in a bid to receive payment. The department, in the meantime, promised to make the payment in a bid to avoid its assets being sold at public auction.
Bezuidenhout earlier managed to secure an order against the provincial department after proving that the pothole was the cause of the accident, in which Beauty was left a paraplegic. She lost control of her car in 2014 when she hit the massive pothole on a public road, and her vehicle overturned.
The provincial department was held responsible as it was proved to have been negligent for not fixing the pothole earlier. The court was told that the pothole had been there for some time and that it was fixed a few days after the accident.
The provincial department was held 100% liable for the damages she could prove she had suffered as a result of the accident. Beauty was a highly functional nurse prior to the accident, but she is now left helpless and needs around-the-clock assistance.
During the second leg of the court case earlier this year, a host of experts were called in a bid to determine how much compensation Beauty should receive. The damages claimed by her were for past medical expenses, future medical expenses, loss of earnings, and general damages.
In determining her damages, Deputy Judge President Tebogo Djaje considered the fact that Beauty was employed as a professional nurse at the time of the accident. She had been in service for approximately 25 years.
Since the accident, she has not been employed and was medically boarded in 2016. She will not be able to return to work as she presents with a physical impairment of 77%, according to the orthopaedic surgeon.
Apart from being wheelchair-bound, she uses an indwelling catheter as well as nappies and is completely dependent on her daughter for assistance. The only physical activity that she can do is gardening to a limited degree.
According to the experts, the plaintiff will require extensive future treatment. Apart from spinal injuries, she also suffered a hip fracture, as well as shoulder and rib fractures. Her injuries further left her with several scars, and she lost four of her front teeth.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The South African
14 hours ago
- The South African
Gauteng rolls out mobile clinics to fight measles outbreak
The Gauteng Department of Health has added seven new vehicles to its Integrated School Health Programme (ISHP) fleet in an effort to control a growing measles outbreak in the province. Gauteng Health MEC Nomantu Nkomo-Ralehoko officially handed over the mobile vaccination vehicles on Friday during a ceremony at Inxiweni Primary School in Tembisa. She said the department's focus on bringing services directly to children who need them most. 'This is more than a handover, it is a message to our young people that their health matters.,' said Nkomo-Ralehoko. ' We are taking services directly to schools, especially in underserved areas, to ensure every learner receives the care they need.' The ISHP teams, who will use the vehicles, will provide various services, including health screenings, immunisations, and health education, to school learners across the province. The new rollout comes amid rising concern over low immunisation coverage in key metros. According to the department, coverage for the second dose of the measles vaccine remains below 75% in Johannesburg and Tshwane, short of the 95% threshold needed to prevent outbreaks. 'These vehicles will help us reach more learners with lifesaving vaccines,' said the MEC. 'We must close the immunity gap and stop the spread of measles and rubella.' Nkomo-Ralehoko added that the expanded mobile services are a timely response to the current outbreak and a long-term investment in public health. By extending health services into schools, the department aims to reduce barriers to immunisation and catch up on missed vaccinations. The mobile units will enhance the province's ability to reach children in remote and under-resourced areas with limited clinic access. Let us know by leaving a comment below, or send a WhatsApp to 060 011 021 1. Subscribe to The South African website's newsletters and follow us on WhatsApp, Facebook, X and Bluesky for the latest news.


The Citizen
2 days ago
- The Citizen
Mpumalanga silent on 21 000 missing HIV patients
About 21 000 HIV patients have disappeared from Mpumalanga's treatment system, yet officials remain unclear or deny the extent of the crisis. The Mpumalanga department of health seems uninterested in addressing the problem of about 21 000 HIV/Aids patients who were on treatment disappearing without a trace. During a recent interview with SABC News, health MEC Sasekani Manzini conceded that some patients were missing and said she was optimistic the newly launched HIV campaign 'will help trace people who defaulted on their HIV treatment. 'In this number of 21 000 are those people who have taken treatment before and defaulted and those who have never taken treatment.' About 21 000 HIV patients disappeared from treatment system Surprisingly, yesterday, Mpumalanga department of health spokesperson Dumisani Malamule said: 'The department is not aware of any 21 000 HIV/Aids patients that have disappeared from our database. 'The MEC launched a campaign on 16 May, 2025, in collaboration with the Mpumalanga Provincial Aids Council (MPAC) and other stakeholders in the health sector as part of the province`s ongoing interventions to enhance uptake of life-saving HIV treatment to ensure 95% of people diagnosed with HIV receive and adhere to antiretroviral therapy (ART) to achieve viral suppression.' ALSO READ: South Africa's health advocacy groups: 'Health failing to shield kids from HIV' 'The HIV treatment campaign objective is to close the gap by putting an additional 1.1 million people nationally, while Mpumalanga's target is 134 000, who are living with HIV but are not on treatment by the end of December. All our quality HIV/ Aids treatment care services are continuing very well,' said Malamule. Last year, MPAC chair Sonto Nkosi conceded that the province was facing a problem of patients disappearing. She called on government to locate them and offer the necessary support. DA spokesperson on health in Mpumalanga Bosman Grobler said the party welcomed the fact that the department launched a provincial campaign to get an extra 150 000 people on ARV treatment, but expressed concern about the 21 000 people who are missing. Concern over missing patients He said they would be encouraging people to be on treatment and those who had stopped must also be located. 'We are concerned about the 21 000 Mpumalanga ARV patients that have vanished from the system. This is troubling because the viral load of these patients will increase and it will be easy for them to infect their partners with the virus.' ALSO READ: Over 8 000 SA healthcare jobs lost – and more could follow – after US Pepfar aid cuts 'The DA believes that if these patients are not found as soon as possible, it might reflect negatively on the province's viral load and derail the action of getting more people on ARV treatment. At present, Mpumalanga has the second-highest HIV viral load in South Africa.' Grobler urged the department to conduct door-to-door and radio campaigns to teach about adhering to ARV treatment. He said the department must try by all means necessary to get the 21 000 missing patients to come back to their facilities so that they can get their treatment. Mpumalanga has highest HIV prevalence of all provinces According to the South African HIV Prevalence, Incidence and Behaviour Survey released in 2024, Mpumalanga has the highest HIV prevalence of all provinces (17.4%), meaning that the province has 890 000 people living with HIV. The Mpumalanga department of health has reported that of the 890 000 HIV-positive people in the province, 630 000 are currently on ARV treatment. ALSO READ: Inside SA government's confused response to the USAid funding crisis Statistics show that South Africa has 7.8 million people living with HIV/Aids and at least 5.9 million are on ARV treatment.

IOL News
2 days ago
- IOL News
Julius Malema to honour fallen EFF members at mass funeral following tragic bus accident
Julius Malema is expected to return to KwaZulu-Natal for a mass funeral of party supporters who died in a bus and truck accident recently. Image: EFF EFF leader Julius Malema and the top leadership of the party are expected to return to KwaZulu-Natal to attend the mass funeral of the party members that died in a bus accident. Ten party supporters died and scores of others were injured when their bus collided with a long-haul truck near Vryheid, north of the province, on Monday night. They were returning from the party's Youth Day commemoration rally, which was held at King Zwelithini Stadium in Umlazi, south of Durban, on Monday. Malema's return to the province was confirmed by the party provincial secretary, Vukani Ndlovu, on Thursday. According to Ndlovu, the party's top leadership would attend the mass funeral over the weekend in remembrance of the fallen heroes and heroines. 'We are expecting our Commander-In-Chief, Julius Malema, and the top national leadership to come back to the province to honour the funeral of our tragically departed fighters.' He said the funeral will take place on Saturday in Vryheid, but the venue still needs to be confirmed, adding that the party is finalising the preparations, including securing a ground or an open space to erect marquees. The party will also carry all funeral costs. Ndlovu said 37 injured people have been discharged, except four who are still in the hospital. Provincial Transport MEC Siboniso Duma visited the scene with department officials, visiting the hospital to see the injured passengers as well as the families of the deceased. Although police are still investigating the cause of the accident, it is believed it was caused by poor visibility in the early hours of darkness, which may have led the bus driver to not be able to see the truck. The MEC said both the SAPS and Road Traffic Management Cooperation will conduct a comprehensive investigation to establish the cause of the accident; however, he received conflicting versions about what happened from the survivors. 'There are allegations that the bus driver tried to overtake. Other survivors have alleged that the bus driver fell asleep at the steering wheel. We do not want to speculate at this stage. We are confident that the investigation will shed light. Critically, we have in the past expressed our concerns about accidents involving trucks,' said Duma. The MEC said trucks are not supposed to be on this road in the first place and should be using the N2, adding that many innocent lives have been lost due to a huge number of trucks on the roads. The truck was believed to be headed to the Richards Bay port to offload coal for export. Over 303,000 trucks, or almost 6,000 trucks every week on average, used the Richards Bay port in the 2024 fiscal year, according to Transnet, Duma stated. He said it has been stated that the port's infrastructure was originally designed for a much smaller volume of trucks, approximately 200 per day. 'Working with the national government, we are doubling our efforts to ensure that we strengthen plans to move cargo from road to rail,' concludes Duma. [email protected]