
Mammoth UGD charges upset Coimbatore residents
Residents across Coimbatore city are reporting alarmingly high Under Ground Drainage (UGD) user charges on the civic body's online payment portal, with demands for some properties extending into lakhs of rupees.
Coimbatore Corporation had recently passed a resolution stipulating revised monthly UGD user charges, to be assessed based on the size of buildings. As per the revised structure, residential buildings up to 600 sq.ft. are to be charged ₹120 per month; 601 to 1,200 sq.ft. at ₹150; 1,201 to 1,800 sq.ft. at ₹180; 1,801 to 3,500 sq.ft. at ₹210; 3,501 to 5,000 sq.ft. at ₹250; 5,001 to 10,000 sq.ft. at ₹280; and properties above 10,000 sq.ft. at ₹300 per month.
However, several residents have discovered significantly inflated figures on the citizen web portal, where property taxes are also managed.
P. Srinivasan, a resident of Gandhipark, said, 'The Corporation recently provided me with the UGD connection book, similar to property and water tax documents. Although no payment demand was explicitly made, I checked my account online and was shocked. My building falls within the 1,801 to 3,500 sq.ft. slab, which, as per the newly proposed ₹210 per month, would only amount to approximately ₹22,680 from 2017 to 2025. Yet, the portal shows a demand of ₹3,30,000.'
A similar situation was reported by a resident in Nanjundapuram. For an 1,100 sqft building, the expected charge for nine years (at ₹150 per month) should be ₹16,200. However, the total displayed demand was ₹1,36,000.
K. Kathirmathiyon, secretary of the Coimbatore Consumer Cause, emphasised the need for clarity. 'The State government must clarify the basis on which these charges are calculated, as there is a complete lack of transparency. Given that there were no regular monthly charges for paid UGD previously, when the civic body begins collection, it should be well-prepared to avoid such errors,' he stated.
According to a senior Corporation official, any reported discrepancies will be investigated. They aim to ascertain if these are isolated cases or part of a wider problem, with steps taken to resolve them.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Hindu
6 hours ago
- The Hindu
Coimbatore Corporation drops plan for multiple STPs along Noyyal
The Coimbatore Corporation has revised its earlier proposal to establish multiple sewage treatment plants (STPs) along the Noyyal river bund. Instead, the Corporation now plans to construct a single STP and divert sewage through interception and diversion systems to existing treatment facilities at Ukkadam, Nanjundapuram, and Ondipudur. According to officials, sewage intercepted at various points along the river will be directed into a well and pumped to the existing STPs. This revised approach is expected to reduce the operational and maintenance costs associated with managing multiple smaller units. Approximately 50 million litres per day (MLD) of sewage is proposed to be redirected through this system. In locations where diversion is not feasible, a separate 15 MLD STP is proposed. The total cost of these measures is estimated at ₹100 crore. As part of preparatory work, the Corporation has completed boundary marking of the Noyyal river and installed boundary stones along the 18.5-km stretch within the city limits. Separately, under the State government's Riverfront Development (RFD) project, Coimbatore is among five cities selected for riverfront enhancements. A proposal for ₹100 crore has been submitted for developing the Noyyal bund stretch from Puttuvikki Road to Nanjundapuram Road. Proposed works include construction of bund roads, retaining walls, parks, walking tracks, and recreational spaces to improve access and connectivity. 'We have submitted proposals totalling ₹220 crore for the rejuvenation of the Noyyal,' said Corporation Commissioner M. Sivaguru Prabakaran. He added that the river, which also carries sewage from several town panchayats and neighbouring local bodies, will see significant improvement once the project is implemented, benefiting all system tanks linked to it.


Time of India
20 hours ago
- Time of India
Now, Trichy residents can avail instalment option for UGD deposits
Trichy: Trichy corporation has, for the first time, introduced an instalment-based payment option for house service connection deposits, to ease the financial burden on residents seeking new underground drainage (UGD) connections under the ongoing UGD project phases, the . This move comes in response to reluctance, particularly among residents of low-income areas, to pay the full deposit amount upfront. The new instalment facility aims to encourage more households to opt for legal UGD connections, thereby reducing the risk of untreated wastewater being discharged into stormwater drains. Phases II and III of the UGD project will cover 24 wards in the city, where a complete underground sewage network will be laid to handle three types of wastewater: fecal waste from toilets, grey water from bathrooms, and wastewater from kitchens. Even properties in economically weaker areas that lack private toilets and rely on public sanitation facilities will be provided UGD connections for non-fecal wastewater. This wastewater will be channelled to sewage treatment plants for proper treatment and disposal. The civic body is targeting at least 3,500 UGD connections per ward in all 24 wards, covering both residential and commercial properties that are registered for property tax. However, the non-refundable deposit amount—ranging from 7,500 to 20,000 depending on the location and type of property—was proving to be a financial hurdle for many, as both residents and traders have expressed their inability to pay at one go. "We are accepting the payment in 10 instalments now. Both residential and commercial property owners can make use of the option and obtain UGD connections," a corporation official said. The local body has planned to promote the availability of instalment options among low-income group areas, to encourage new UGD connections, particularly in Ariyamangalam and Thiruverumbur areas. Trial run for phase II and phase III of UGD projects is planned in the next three months to commission both the UGD network and a new sewage treatment plant (STP) built at Keela Kalkandarkottai.


The Hindu
a day ago
- The Hindu
Thiruvananthapuram Corporation dstributes electric tricycles
The Thiruvananthapuram Corporation on Friday distributed electric tricycles to Haritha Karma Sena workers to collect non-biodegradable waste from various localities and transport it to the collection and treatment centres. Mayor Arya Rajendran flagged off the tricycles at a function held at the Corporation office. The Haritha Karma Sena members were provided one month of training to use the electric tricycles. The project was implemented with the cooperation of the Kerala Development and Innovation Strategy Council (K-DISC), Social Alpha Foundation, University of Toronto India Foundation and Kerala Institute of Local Administration (KILA). The electric tricycles was one of the novel ideas evolved through the innovation challenge held as part of the Innovations in Sustainable Urban Transition programme.