logo
Special trains from Visakhapatnam to SMV Bengaluru and Shalimar extended to clear summer rush

Special trains from Visakhapatnam to SMV Bengaluru and Shalimar extended to clear summer rush

The Hindu23-05-2025

Special trains between Visakhapatnam and SMV Bengaluru, and between Visakhapatnam – Shalimar have been extended to clear the summer rush.
Train no. 08581Visakhapatnam – SMV Bengaluru special express train will leave Visakhapatnam at 3.20 p.m. on Sundays (5 trips) from June 1 to 29 and will reach Duvvada at 4 p.m. and will leave at 4.02 p.m. to reach SMV Bengaluru on the next day at 12.45 p.m.
In the return direction, 08582 SMV Bengaluru – Visakhapatnam Special Express train will leave SMVT Bengaluru at 3.50 p.m. on Mondays (5 trips) from June 2 to 30 and will reach Duvvada on the next day at 12.40 p.m. and depart at 12.42 p.m. to reach Visakhapatnam at 1.30 p.m., according to K. Saandeep, Senior Divisional Commercial Manager of Waltair Division.
This train will also stop at Anakapalli, Yelamanchili, Samalkot, Rajahmundry, Eluru, Vijayawada, Ongole, Nellore, Gudur, Renigunta, Katapadi, Jolarpetai, Kuppam, Bangarpet and Krishnarajapuram
It will have 2nd AC – 2, 3rd AC - 3, 3rd AC Economy – 2, Sleeper class coaches-8, General Second Class- 4, Second class cum luggage/ Divyangjan -1, Luggage /generator/brake van-1 in its composition.
Similarly, train no. 08508 Visakhapatnam– Shalimar Special train Express will leave Visakhapatnam at 11.20 a.m. on Tuesdays from June 3 to 24. It will reach Simhachalam at 11.36 a.m. and leave at 11.38 a.m.; Vizianagaram at 12.08 p.m. and departure at 12.10 p.m.; Chipurupalli at 12.35 p.m. and departure at 12.37 p.m.; Srikakulam Road at 1.08 p.m. and departure at 1.10 p.m. and will reach Shalimar on the next day at 3 a.m.(4 trips).
In the return direction, 08507 Shalimar - Visakhapatnam Special Express will leave Shalimar at 5 a.m. on Wednesdays from June 4 to 25 and will reach Srikakulam Road at 6.10 p.m. and departure at 6. 12 p.m.; Chipurupalli at 6.38 p.m. and departure at 6.40 p.m.; Vizianagaram at 7.03 p.m. and departure at 7.05 p.m.; Simhachalam at 7.35 p.m. and departure at 7. p.m. to arrive in Visakhapatnam Junction at 8. 50 p.m. (4 trips).
This special train will have 2nd AC-1, 3AC - 3, Sleeper- 9, General Second Class -4, Second Class cum Luggage/ Divyangjan coaches- 1 and Motor Car-1.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Continuation of express special trains announced by SWR
Continuation of express special trains announced by SWR

Time of India

time9 hours ago

  • Time of India

Continuation of express special trains announced by SWR

H ubballi: South Western Railway has decided to continue the service of the following weekly express special trains for the convenience of passengers and to clear the extra rush. The details of the extended services are as follows: Train No. 07333 SSS Hubballi–Vatva Weekly Express Special, earlier notified to run up to June 15, will continue to run from June 22 to July 13. Train No. 07334 Vatva–SSS Hubballi Weekly Express Special, earlier notified to run up to June 16, will continue to run from June 23 to July 14. Train No. 07323 SSS Hubballi–Banaras Weekly Express Special, earlier notified to run up to June 28, will continue to run from July 5 to July 26. Train No. 07324 Banaras–SSS Hubballi Weekly Express Special, earlier notified to run up to July 1, will continue to run from July 8 to July 29. Train No. 07315 SSS Hubballi–Muzaffarpur Weekly Express Special, earlier notified to run up to June 23, will continue to run from June 30 to Aug 25. Train No. 07316 Muzaffarpur–SSS Hubballi Weekly Express Special, earlier notified to run up to 26 June , will continue to run from July 3 to Aug 28. Train No. 07327 Belagavi–Mau Weekly Express Special, earlier notified to run up to June 29, will continue to run from July 6 to Aug 31. Train No. 07328 Mau–Belagavi Weekly Express Special, earlier notified to run up to July 2, will continue to run from July 9 to Sept 3. Train No. 07311 Vasco Da Gama–Muzaffarpur Weekly Express Special, earlier notified to run up to June 23, will continue to run from June 30 to Aug 25. Train No. 07312 Muzaffarpur–Vasco Da Gama Weekly Express Special, earlier notified to run up to June 26, will continue to run from July 3 to Aug 28. Train No. 06529 SMVT Bengaluru–Gomti Nagar Weekly Express Special, earlier notified to run up to June 9, will continue to run from June 23 to Aug 25. Train No. 06530 Gomti Nagar–SMVT Bengaluru Weekly Express Special, earlier notified to run up to June 13, will continue to run from June 27 to Aug 29. Train No. 06563 Yesvantpur–Gaya Weekly Express Special, earlier notified to run up to June 28, will continue to run from July 5 to July 26. Train No. 06564 Gaya–Yesvantpur Weekly Express Special, earlier notified to run up to June 30, will continue to run from July 7 to July 28. Train No. 06211 Mysuru–Darbhanga Weekly Express Special, earlier notified to run up to June 24, will continue to run from July 1 to Aug 26. Train No. 06212 Darbhanga–Mysuru Weekly Express Special, earlier notified to run up to June 28, will continue to run from July 5 to Aug 30. Train No. 06281 Mysuru–Ajmer Weekly Express Special, earlier notified to run up to June 14, will continue to run from July 5 to Aug 30. Train No. 06282 Ajmer–Mysuru Weekly Express Special, earlier notified to run up to June 16, will continue to run from July 7 to Sept 1, according to a press release.

Temporary changes made to platform access at Visakhapatnam Railway Station to facilitate development works
Temporary changes made to platform access at Visakhapatnam Railway Station to facilitate development works

The Hindu

time5 days ago

  • The Hindu

Temporary changes made to platform access at Visakhapatnam Railway Station to facilitate development works

Temporary changes have been made to platform access at Visakhapatnam Railway Station due to essential construction works on the Foot Over Bridge (FOB) near Gate No. 3 with effect from Monday (June 16). This FOB will be available for access to Platform No. 2 and 3 only. The South End FOB near Gate No. 3 will be temporarily closed to facilitate its extension of Platforms 6, 7, and 8 as a part of ongoing efforts to improve passenger convenience and operational efficiency, During this period, passengers are advised to use the other two Foot Over Bridges and the lifts available at the station for platform access. Divisional Railway Manager Lalit Bohra, along with senior officials, is closely monitoring the construction works. He directed the station staff to monitor crowd management and provide necessary assistance to avoid any last-minute inconvenience and to ensure smooth passenger movement. Senior Divisional Commercial Manager K. Saandeep., in a statement on Monday, expressed regret at the inconvenience caused and appealed to passengers for cooperation during this important phase of infrastructure enhancement. These works are essential for improving connectivity, safety, and the overall improvement of passenger convenience.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store