
Chhattisgarh's Dhamtari district earns PM's award for GIS-based water conservation plan
Dhamtari district in Chhattisgarh has been awarded the Prime Minister's Excellence Award
RAIPUR:
Dhamtari district
in Chhattisgarh has received the
Prime Minister's Excellence Award 2023
in the Innovation category for its
GIS-based water conservation
plan. This multi-layered initiative has significantly improved
water management
across the district.
The project focused on revitalising existing water structures and implementing targeted interventions, resulting in the creation of 26 new Amrit Sarovars, 156
rainwater harvesting
structures, and enhanced agricultural potential over 472 acres.
Using GIS technology, customised maps were developed for each panchayat, enabling data-driven planning and the strategic development of essential water infrastructure at the grassroots level. These efforts, led by then District Collector Namrata Gandhi, improved water availability and empowered local communities with
sustainable water solutions
.
A comprehensive GIS-based framework, developed with technical support from Upendra Singh Chandel, District Informatics Officer, NIC Dhamtari, transformed the district's approach to water conservation. The framework integrated data from the
Jal Doot App
, the Central Ground Water Board (CGWB), INDIA WRIS, and NIT Raipur survey data.
The initiative produced impactful outcomes, including hydrological mapping to identify water-stressed zones by overlaying data on aquifers, land use, and rainfall. This helped prioritise areas for constructing check dams, recharge wells, and rainwater harvesting structures, along with conducting seasonal groundwater analysis before and after the monsoon.
A GIS-enabled Water Body Inventory—developed using satellite imagery and drone surveys—was created to monitor the health, encroachments, and conservation status of water bodies. Mobile apps were launched to crowdsource water conservation efforts during the Jal Jagar Mah Utsav, with real-time tracking made possible through GIS dashboards.
Despite these achievements, Jal Doot App data indicates a declining water table, driven by over-extraction for 60,000 hectares of summer paddy and over 32,000 borewells. As of March 2023, 98 gram panchayats reported spot source failures under the Jal Jeevan Mission (JJM). Falling reservoir levels and rising water scarcity remain pressing concerns.
To address this, a 24x7 JJM call centre was launched in March 2024. Of the 732 complaints received, 663 were resolved, showing a marked improvement in public service delivery.
Under Gandhi's leadership, the district shifted from infrastructure-heavy methods to behaviour-driven, sustainable practices. These included promoting crop diversification—from summer paddy to millets and pulses—and encouraging rooftop rainwater harvesting in urban and industrial areas. A platform called SATHI was also launched to foster collaboration between civil society and government.
A workshop conducted by the CGWB brought together departments such as Public Health Engineering (PHE), Agriculture, Forest, Urban Development, and MGNREGA to map recharge zones and plan interventions like subsurface dykes, percolation tanks, and more Amrit Sarovars. It also aimed to link urban rooftop harvesting systems to alluvial recharge zones and address causes of spot source failures, including poor recharge and water divide locations.
Industries were mapped against local groundwater levels, revealing widespread non-compliance with CGWB norms. Following a directive from the Collector, flow meters were installed, and 198 rooftop rainwater harvesting systems in industrial areas were renovated. As a result, 136 notices were issued, and 99 industries applied for usage permissions. A single-window system under the General Manager of the District Industries Centre (GMDIC) was introduced to support compliance.
The Clean Gangrel Campaign in February 2024 saw 29 organisations collect 35 mini-truckloads of plastic waste. Proposals have been submitted for an eco-tourism plan and a single-use plastic ban around the Gangrel reservoir. The NHAI, SECR, and ADB collaborated to connect excavation activities to Amrit Sarovar construction—102 have been completed, and 12 are in progress. Injection wells were included in road projects within recharge-deficient zones—66 planned, 17 completed.
Gandhi's approach reflected convergent governance, scientific planning, and community engagement. Her tenure as Collector made Dhamtari a national model in water conservation, earning the Prime Minister's Excellence Award 2023.
Now posted as Deputy Secretary at the Cabinet Secretariat, Government of India, Gandhi's leadership in Dhamtari was marked by innovation, inclusivity, and a commitment to public service.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
5 hours ago
- Time of India
Nitish shares final design of 'Janki Mandir' to be constructed at birthplace of Sita
Bihar Chief Minister Nitish Kumar on Sunday shared the final design of the "Janki Mandir" which will be constructed at Punauradham, a Hindu pilgrimage site in Sitamarhi district that is considered the birthplace of goddess Sita . The government has also constituted a trust to expedite the ongoing redevelopment works of the ' Punaura Dham Janki Mandir'. In a post on X on Sunday, the CM said, "I am very happy to inform you that the design of the grand temple and other structures for the redevelopment of Jagat Janani Maa Janaki's birthplace Punauradham, Sitamarhi is now ready. A trust has also been formed for this so that the construction work can be expedited." by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Treatment That Might Help You Against Knee Pain Knee pain | search ads Find Now Undo The chief minister posted several images of the proposed temple. "We are determined to complete the construction of the grand temple in Punauradham, Sitamarhi soon," he said adding that it would be a matter of pride for all. Live Events The state Cabinet recently approved the appointment of a Noida-based private firm as the design consultant for the development of "Punaura Dham Janki Mandir". It is the same organisation which was the consultant for Master Planning & Architectural Services of the Ram temple at Ayodhya. A large number of pilgrims including those from abroad visit the Punaura Dham. Earlier also, the state cabinet had approved Rs 120 crore for the overall development of the temple. Nitish Kumar on December 13, 2023 had laid the foundation stone for the overall development of Punaura Dham Janki Mandir. Under the new development plan, the state government will develop 'Sita-Vatika', 'Luv-Kush Vatilka', construct a parikrama path, display kiosks, cafeteria, children's zones etc. All connecting roads to the pilgrim site are also being developed. Besides, thematic gates and parking areas are being constructed around the pilgrim site.


The Hindu
6 hours ago
- The Hindu
Kalikuppam residents seek urgent repair to damaged community hall and anganwadi
Residents of Kalikuppam, a fishing village under the Kottuchery commune in Karaikal, have called for the immediate repair of the village's only community hall and anganwadi building, both of which are in a dilapidated condition. The two facilities were constructed in 2008 by a New Delhi-based trust as part of post-tsunami relief effort but have since fallen into disuse because of lack of maintenance. The community hall, once a well-built structure, is now completely damaged, leaving the village — with around 180 fishing families — without a space for conducting public or family events. 'We are forced to approach neighbouring villages or rent private halls, which either causes friction or results in heavy expenses,' said Anbazhagan M., a panchayat member from the village. The anganwadi building, part of the tsunami rehabilitation initiative, has become unusable over the years. At present, the anganwadi operates from a cramped room inside the government primary school, where more than 20 children are enrolled. 'Both the anganwadi and community hall were part of the same post-tsunami initiative. Now, one is in ruins, and the other is functioning in a congested schoolroom. We have submitted several petitions to the district administration, but action has not been taken so far,' Mr. Anbazhagan added. Official sources said the delay in repair work was due to lack of funds. However, restoration would be initiated once the Puducherry government allocates the required budget.


New Indian Express
10 hours ago
- New Indian Express
Old tea godown threatens Fort Kochi boat jetty; SWTD seeks its demolition
KOCHI: An old godown building, in dilapidated condition, is threatening the Fort Kochi customs boat jetty, which is relied on by hundreds of commuters and tourists. In fact, a portion of the large building has already caved in, damaging the ceiling of the walkway of the boat jetty, which was reopened to the public just a couple of months ago following a `80-lakh renovation. The 'Imperial' building, owned by a Willingdon Island-based export company engaged in tea packaging, used to exhibit artwork during the Kochi Biennale. But now, it's mostly employed as a godown. Constructed using stones and mud bricks, it has the height of a two-storey building. With the structure threatening to cave in at any time, the state water transport department (SWTD) and the Cochin Smart Mission Ltd (CSML) has written to Kochi corporation, demanding that the building be demolished. 'A portion of the building caved in last week, damaging the roof of the jetty, which was aesthetically renovated using a false ceiling and illuminating lights. We suffered a damage of Rs 20,000. We've also taken up the issue with the Disaster Management Authority,' a senior SWTD official said. The portion of the walkway facing the godown building is restricted for commuters to ensure their safety. As a result, the walkway connecting the jetty with the road remains crowded during rush hour. Meanwhile, ward councillor and health standing committee chairperson T K Ashraf has also filed a complaint, demanding the immediate demolition of the 'dangerous' building, following which the corporation assistant executive engineer served a notice to the owner, A V Agencies. The notice threatened action under the Kerala Municipality Act if the owner fails to act. 'Firm to bear expense' Meanwhile, Kalvatty ward member Ashraf said he held talks with representatives of the company, which owns the building, and the latter agreed to demolish the portion posing a danger to the boat jetty. 'The company agreed to bear the expense for levelling the section, which will probably start tomorrow itself. Demolition experts visited the site today. A fire force team also examined the building and agreed to assist the process. The continuous rain has worsened the situation. We've initiated action on a war footing,' he told TNIE. 'A portion caved in last week, and no measure has been taken yet to ensure the safety of commuters. We demand that authorities demolish the building at the earliest,' said M M Abbas, president of the West Kochi Passengers Association.