
Seven districts to witness heavy rainfall today: IMD
Patna: Southwest monsoon on Friday covered almost all districts of the state, bringing much-needed relief to people.
The city witnessed light showers on Friday morning, while several other districts, including Gaya, Sheikhpura, Rohtas, Buxar, Bhojpur, Madhepura, Nalanda and Bikramganj received moderate to heavy rainfall.
The Indian meteorological department (IMD) had earlier forecast above normal rainfall in June in the state.
The IMD said that seven districts, including Araria, Kishanganj, Purnia, Buxar, Rohtas, Kaimur and Aurangabad, are likely to witness heavy rainfall on Saturday.
It issued an orange alert of thunderstorm and lightning in 13 districts, including Supaul, Araria, Kishanganj, Purnia, Katihar, Madhepura, Saharsa, Buxar, Bhojpur, Rohtas, Kaimur, Aurangabad and Arwal.
For the remaining districts, a yellow alert of similar weather conditions was issued. Residents have been advised to take necessary precautions and remain indoors during thunderstorms.
Temperatures across the state are expected to remain pleasant for the next three days, with the maximum temperature likely to remain in the range of 30-32 degrees celsius, and the minimum temperature would hover around 24-26 degrees celsius.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Giao dịch CFD với công nghệ và tốc độ tốt hơn
IC Markets
Đăng ký
Undo
The maximum temperature in Bhagalpur, Purnia, Gaya, Aurangabad, Sheikhpura, Madhepura, Munger, Banka, and Katihar plummeted below 30 degrees celsius on Friday.
The IMD said no major change is expected in the maximum and minimum temperature for the next three to four days. The maximum temperature in the state was recorded at 36.3 degrees celsius in Gopalganj, and the minimum was recorded in Darbhanga at 23.6 degrees celsius. Patna's maximum temperature was 30.5 degrees celsius.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
36 minutes ago
- Time of India
City's civic infra fails first rain test
1 2 Lucknow: Revealing serious lapses in civic infrastructure maintenance, the service lane of Ring Road near Indiranagar Sector 18 collapsed after the season's first rainfall, forming a 15-foot-wide crater. The public works department has barricaded the area. As a temporary measure, the crater has been filled with debris and rubbish to prevent any untoward incident. Repair work has begun, but the blame game among govt agencies has already started. PWD sources alleged that Lesa had recently laid underground cables without proper coordination, which might have weakened the surface. Meanwhile, confusion prevailed over jurisdiction. Zone-7 zonal officer Akash Kumar said the area falls under the National Highways Authority of India (NHAI). He added that sewer and drain maintenance is the responsibility of LMC. Residents reported that while the sludge from drains was removed during pre-monsoon cleaning, it was left on the roadside and washed back into the drains with the rain, defeating the purpose. Waterlogging was also reported near the Daliganj Crossing underpass, where a small crater developed following the downpour. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Walgreens Keeps Quiet About This '9 Pills for $7' Generic Cialis Deal Health Alliance by Friday Plans Learn More Undo On G-20 Road, the road caved in after heavy rainfall. For pedestrian safety, wooden planks have been installed around the cavity. At Vijayant Khand-3, houses faced severe waterlogging. The road in front of Neem Upvan Park was submerged, making it difficult for residents to step outside their homes. In Sushant Golf City, Resident Welfare Association president ML Sahu shared that even a short spell of rain leads to severe water accumulation. Residents of Paradise Crystal Apartments, A-4, and Santushti-2 Apartments continue to face hardships due to chronic drainage issues. Near the Ram Manohar Lohia Park crossing, a tree was uprooted, blocking the road and causing traffic snarls. Municipal Commissioner Gaurav Kumar conducted an inspection of the Smart City Control Room to review the status of flood pumping stations and monitor complaints received during Thursday night's rainfall. He directed officials to ensure the timely resolution of all complaints and to follow up with citizens for feedback after the issue is addressed. Highlighting the vulnerability of low-lying areas, he said all municipal teams are on high alert to tackle waterlogging and other rain-related issues. Helpline nos. Toll-Free: 1533 Mobile helplines: 9219902911, 9219902912, 9219902913, 9219902914


Time of India
an hour ago
- Time of India
Heatwave season checks out of city
New Delhi: With the monsoon expected to reach the city within the next four days, the heatwave season has officially come to an end. This year, Safdarjung — Delhi's base weather station — recorded only three heatwave days, all in April. However, some parts of the city experienced up to nine heatwaves in April and June. Last year, Safdarjung recorded 14 heatwave days in the summer. Regular spells of rain and thunderstorms this year helped keep temperatures in check. "Heatwave conditions are unlikely now. In this season, only two spells of heatwaves were recorded as showers and thunderstorms led to excess rainfall in north-west India in May," said Krishna Kumar Mishra, scientist, India Meteorological Department . The first streak of heatwave was recorded from April 6 to 10 and Safdarjung reeled under three such days. May was relatively better due to frequent rain and thunderstorms interventions, which prevented the mercury from rising above normal. The second spell of heatwave lasted from June 9 to 12. While on June 9, Ayanagar station met the heatwave criteria, Ayanagar, Lodhi Road and Ridge experienced heatwave conditions on June 10. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Buy Brass Idols - Handmade Brass Statues for Home & Gifting Luxeartisanship Buy Now Undo Ayanagar again logged heatwave conditions on June 11 but June 12, only one station — Mungeshpur in northwest Delhi — reported heatwave conditions. Heatwaves are mostly recorded from the second week of April to mid-June. Of the 14 heatwaves recorded last year, six consecutive days were reported from May 26 to 31. Eight additional days were witnessed in June. Though Safdarjung did not record a single heatwave in 2023, the summer of 2022 saw 13 heatwave days, including nine in April and four in May, according to IMD. Explaining the reason behind Delhi not recording any heatwave in May this time, Mishra said, "There were frequent western disturbances across northwest India, lower-level easterlies from the Bay of Bengal and lower-level south-westerlies from the Arabian Sea in May. Due to these three components, Delhi saw more than normal episodes of rain accompanied by thunderstorms in May." In May, Safdarjung logged 186.4mm of rainfall, an excess of 507%. Even before the arrival of the monsoon, June so far has already recorded excess rainfall at 87.8mm against the normal average for the month of 74.1mm. IMD defines a heatwave day as one when the maximum temperature is 4.5 degrees and more above normal temperature and the maximum is at least 40 degrees Celsius or if the maximum temperature touches 45 degrees Celsius or above. A 'severe' heatwave is when the maximum is 6.5 degrees and more above normal.


Time of India
2 hours ago
- Time of India
City infrastructure crumbles as monsoon exposes civic bodies' negligence
1 2 3 4 5 6 Jaipur: The Pink City's claims of monsoon preparedness lay in ruins Friday as just two days of rain brought India's tourist hotspot to its knees, exposing years of infrastructural neglect and bureaucratic apathy. In a grave incident that highlighted the city's crumbling infrastructure, a massive sinkhole - 15 feet deep and 60 feet long - emerged near Muhana Mandi, swallowing two parked vehicles and forcing authorities to completely shut down the arterial road. This catastrophic failure came mere weeks after district collector Jitendra Kumar Soni confidently declared, "This time Jaipur won't drown." As the situation deteriorated, Soni declined to comment Friday. A senior official from the collectorate said, "Our role is to monitor departments; execution is their responsibility." While the city struggled to stay afloat, JMC Greater mayor Somya Gurjar's priority appeared to be International Yoga Day preparations, drawing sharp criticism from residents. "When the city is sinking, the administration is busy preparing for yoga," remarked a frustrated citizen. The city's major thoroughfares, including MI Road and Tonk Road, transformed into virtual rivers, paralysing traffic and stranding thousands of commuters. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Perdagangkan CFD Emas dengan Broker Tepercaya IC Markets Mendaftar Undo In an ironic twist, even the Jaipur Municipal Corporation-Greater's office became inaccessible due to severe waterlogging, leaving staff trapped inside and citizens stranded outside. On key routes such as JLN Marg, waterlogging caused severe traffic slowdowns. A traffic official said, "As vehicle speed dropped, congestion built up. With sidewalks submerged, pedestrians were forced onto the roads, worsening the gridlock." Adding to the chaos, three dangerous potholes appeared near the Ganga Jamuna petrol pump in Mansarovar, with authorities failing to even install basic warning barricades. In Vijay Nagar Phase II, Kartarpura, shoddy pipeline work by PHED led to multiple road cave-ins, trapping vehicles and endangering lives. Loose soil in Gopalpura and other areas washed away, causing road collapses and triggering a dispute between the Jaipur Development Authority (JDA) and the Public Health Engineering Department (PHED). JDA Superintendent Engineer Deepak Mathur said, "The road sank because the water pipeline beneath broke. It will only be repaired after the pipe is fixed." A PHED official responded, "The road design was flawed. The collapse led to water seeping below and damaging the line." This infrastructure breakdown raises serious questions about the public money spent on pre-monsoon preparations and the city's disaster management capabilities. As Jaipur continues to sink under the weight of administrative negligence, the only thing floating seems to be empty promises.