
MRL acts to curb dust issue at Gombak ECRL project site
KUALA LUMPUR: Malaysia Rail Link Sdn Bhd (MRL) has increased the frequency of water bowser use to up to three times a day to clean the dusty access road at the East Coast Rail Link (ECRL) project site in Batu 10, Gombak, following recent public complaints.
In a statement today, MRL said the deployment of water bowsers, part of mitigation efforts to reduce dust, depends on weather conditions and the level of road dirtiness.
In addition, the company said the contractor will continue to ensure the use of tyre wash-through lanes at the entrance and exit points of the construction site to reduce soil and dust residues from heavy vehicles entering public roads.
'Batu 10 is a main route for heavy vehicles involved in ECRL construction works in the Gombak area. We are concerned about the complaints received from nearby residents regarding the dust and dirt caused by the movement of heavy vehicles,' the statement read.
As part of its resolution approach, MRL will also meet with the complainants soon to gather further feedback and explain the actions that have been taken and those planned.
MRL is also reviewing additional measures to enhance dust control in the affected area and remains committed to prioritising the well-being of residents throughout the project's implementation.
'MRL will also consider residents' suggestions to restrict heavy vehicle movement during the day, especially during peak hours, to reduce dust pollution that could pose health risks to the community,' it said.
According to MRL, it is committed to ensuring that all construction activities comply with environmental standards, including the Environmental Impact Assessment and the Erosion and Sediment Control Plan, and do not affect the well-being of local communities.
Several days ago, a local newspaper reported that residents of Batu 10, Gombak, have had to live with constant dust due to lorries frequently using the main access road to the ECRL construction site since the end of last year.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Sun
13-06-2025
- The Sun
MRL Offers RM2,000 Aid to Families of 15 UPSI Students
KUALA TERENGGANU: Malaysia Rail Link Sdn Bhd (MRL) has come forward to provide financial assistance to families of the 15 Universiti Pendidikan Sultan Idris (UPSI) students who were killed in an accident in Gerik, Perak on Monday. In a statement today, MRL said each family of the victims who perished in the accident on the East-West Highway (JRTB), near Tasik Banding in Gerik, Perak, received a financial contribution of RM2,000 to help ease their burden The statement said that although it may not be much, the contribution can hopefully help meet any family needs. MRL also extends condolences to the families of all victims and prays that they are granted strength and resilience in facing this trying time. 'This is one of MRL's initiatives to assist and alleviate the burden of families affected by disasters, those with limited means as well as orphans, especially in areas near the East Coast Rail Link (ECRL) project corridor,' according to the statement. The statement also said that the contribution was handed over by MRL chief executive officer Datuk Seri Darwis Abdul Razak today. On Monday, 15 UPSI students were killed when a chartered bus ferrying them from Jertih to the main campus in Tanjung Malim, Perak overturned after colliding with a Perodua Alza multi-purpose vehicle on the JRTB. The accident also resulted in 33 others being injured, including the bus driver and conductor, as well as the driver and three passengers of the Perodua Alza.


The Sun
13-06-2025
- The Sun
MRL provides financial aid to families of Gerik crash victims
KUALA TERENGGANU: Malaysia Rail Link Sdn Bhd (MRL) has come forward to provide financial assistance to families of the 15 Universiti Pendidikan Sultan Idris (UPSI) students who were killed in an accident in Gerik, Perak on Monday. In a statement today, MRL said each family of the victims who perished in the accident on the East-West Highway (JRTB), near Tasik Banding in Gerik, Perak, received a financial contribution of RM2,000 to help ease their burden The statement said that although it may not be much, the contribution can hopefully help meet any family needs. MRL also extends condolences to the families of all victims and prays that they are granted strength and resilience in facing this trying time. 'This is one of MRL's initiatives to assist and alleviate the burden of families affected by disasters, those with limited means as well as orphans, especially in areas near the East Coast Rail Link (ECRL) project corridor,' according to the statement. The statement also said that the contribution was handed over by MRL chief executive officer Datuk Seri Darwis Abdul Razak today. On Monday, 15 UPSI students were killed when a chartered bus ferrying them from Jertih to the main campus in Tanjung Malim, Perak overturned after colliding with a Perodua Alza multi-purpose vehicle on the JRTB. The accident also resulted in 33 others being injured, including the bus driver and conductor, as well as the driver and three passengers of the Perodua Alza.


The Sun
10-06-2025
- The Sun
MRL acts to curb dust issue at Gombak ECRL project site
KUALA LUMPUR: Malaysia Rail Link Sdn Bhd (MRL) has increased the frequency of water bowser use to up to three times a day to clean the dusty access road at the East Coast Rail Link (ECRL) project site in Batu 10, Gombak, following recent public complaints. In a statement today, MRL said the deployment of water bowsers, part of mitigation efforts to reduce dust, depends on weather conditions and the level of road dirtiness. In addition, the company said the contractor will continue to ensure the use of tyre wash-through lanes at the entrance and exit points of the construction site to reduce soil and dust residues from heavy vehicles entering public roads. 'Batu 10 is a main route for heavy vehicles involved in ECRL construction works in the Gombak area. We are concerned about the complaints received from nearby residents regarding the dust and dirt caused by the movement of heavy vehicles,' the statement read. As part of its resolution approach, MRL will also meet with the complainants soon to gather further feedback and explain the actions that have been taken and those planned. MRL is also reviewing additional measures to enhance dust control in the affected area and remains committed to prioritising the well-being of residents throughout the project's implementation. 'MRL will also consider residents' suggestions to restrict heavy vehicle movement during the day, especially during peak hours, to reduce dust pollution that could pose health risks to the community,' it said. According to MRL, it is committed to ensuring that all construction activities comply with environmental standards, including the Environmental Impact Assessment and the Erosion and Sediment Control Plan, and do not affect the well-being of local communities. Several days ago, a local newspaper reported that residents of Batu 10, Gombak, have had to live with constant dust due to lorries frequently using the main access road to the ECRL construction site since the end of last year.