
Zirakpur civic body to soon get corporation status
1
2
Mohali: Punjab local government minister Dr Ravjot Singh announced the elevation of Zirakpur municipal council as municipal corporation. The minister, who made the announcement during a surprise visit on early Thursday morning, also ordered an immediate civic clean-up and improvement drive in the town.
Dr Ravjot emphasized that the rapid urban expansion of Zirakpur requires a larger, more empowered civic body to ensure effective governance, improved sanitation, reliable water supply, and systematic urban planning. He urged MLA Kuljit Singh Randhawa to submit a formal proposal through the municipal council to initiate the official upgrade process, which will take effect from the upcoming municipal corporation elections.
The minister expressed serious concern over the poor condition of civic infrastructure, particularly highlighting the choked Sukhna Choe, and directed officials to take swift action before the monsoon. He instructed the drainage department to assist the municipal council in clearing the choe and warned residents against dumping waste that could block water flow and cause flooding.
As part of the city's infrastructure upgrade, the minister confirmed the installation of two sewage treatment plants (STPs) — one of 47 MLD capacity at Sanauli, where land has already been handed over to the Water Supply and Sewerage Board, and another 37 MLD plant, for which land identification is currently underway.
Additionally, a high-level bridge costing Rs 5.96 crore has been proposed on the Sukhna Choe at Baltana to manage seasonal overflows.
During his visit, Dr Singh inspected several areas, including Baltana Furniture Market, Old Kalka Road, and Dhakauli, where he instructed local officials to deploy additional manpower to ensure citywide cleanliness. "The deteriorating condition of roads and public spaces is unacceptable," he said, adding that Zirakpur must reflect the aspirations of its fast-growing population.
When MLA Randhawa raised the issue of stormwater discharge from Panchkula causing flooding in Peer Muchhalla, the minister directed top officials in the local government department to coordinate with authorities from the neighbouring state for a swift resolution.
Dr Singh said, "As per the directions of chief minister, we are focused on ensuring that basic civic amenities are delivered efficiently. Accountability will be fixed in case of any negligence by local officers."
The minister concluded by promising traffic reforms and better urban planning to decongest Zirakpur's roads and enhance quality of life for its residents.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
41 minutes ago
- Indian Express
Gujarat: 40-km detour for Chhota Udepur commuters after Bharaj river diversion closed
The commute to and from the tribal district Chhota Udepur would now require a detour of an additional 40 kilometers after the district administration ordered the closure of a makeshift diversion constructed on the Bharaj river and witnessed a partial washout due to heavy rains. The diversion made on the riverbed by making culverts in the riverpath has been the only connection for vehicular traffic to the tribal district after the dilapidated main bridge on NH56, over the river, collapsed in August 2024 due to heavy rains. On Saturday, District Collector Gargi Jain and officials of the district police department rushed to the spot as the diversion was washed out due to heavy rain. The diversion was ordered to be closed until the National Highway Authority of India (NHAI) examined the same for structural stability. Instead, vehicular traffic was directed to take the old highway connecting Chhota Udepur to Vadodara, which means a detour of 40 km. Sharing more details, Jain said, 'The diversion that was created on the Bharaj bridge has shown several cracks. The NHAI is conducting a structural stability analysis and once the report is received, we will decide based on the strength of the structure assessed if it should be opened to traffic. For now, we are closing the diversion'. 'There is an old diversion road that can be used by motorists in the interim. We will decide after the NHAI report what should be done,' the district collector added. The Bharaj bridge has been a contentious issue since July 2023, when it was damaged due to flooding after water was released from the Sukhi dam. The bridge was subsequently closed for a long time. In August 2024, a major part of the dilapidated bridge had collapsed during the monsoon. The NHAI is currently working on constructing a new bridge over the river, the foundation stone for which was laid by Prime Minister Narendra Modi during his visit on May 26 this year. The new bridge is estimated to be built at a cost of Rs 26 crore.


Time of India
43 minutes ago
- Time of India
Patil writes to CM on mining scams, BJP questions timing
Bengaluru/Raichur: Law minister HK Patil has written a detailed letter to chief minister Siddaramaiah expressing deep concern over the govt's failure to act on thousands of illegal mining cases that allegedly led to a loss of Rs 1.5 lakh crore between 2007 and 2011. In a seven-page letter dated June 18, Patil criticised the "administrative apathy" in handling these cases and called for stern action against the culprits and recovery of lost public wealth. He reminded Siddaramaiah of the 320-km foot march to Ballari in 2010 against illegal mining when the Congress was in opposition. Patil, who headed the cabinet sub-committee on illegal mining during Siddaramaiah's previous term (2013–18), noted in the letter that only 7.6% of more than 12,000 registered illegal mining cases have been investigated so far. "In just 2 per cent of these seven per cent, which means in only 0.2 per cent of the total number of cases, verdicts have come and cases have seen a conclusion," he further added. In Raichur, Patil on Saturday said, "I have brought it to the notice of the CM about what has to be done. The letter is written in the interest of the state and its people. The chief minister has seen the letter and has taken the matter seriously." He also warned that documents related to these illegalities should not be destroyed and called for vigilance. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với mức chênh lệch giá thấp nhất IC Markets Đăng ký Undo Suggesting fresh measures, he proposed appointing a recovery commissioner under the Criminal Law Amendment Ordinance, 1946, creation of a new SIT, and a special court for speedy trial. BJP MP Lahar Singh Siroya questioned the timing. "I am happy that law minister wrote a seven-page letter to CM, reminding him of the commitment he had made to recover the iron ore scam money... I wonder why Patil took so long to remind his CM on the unrecovered funds. Timing is everything in politics."
&w=3840&q=100)

Business Standard
an hour ago
- Business Standard
Rs 8,000 crore plan in works to clean Yamuna, fix drainage: Delhi CM
The Delhi government is currently working on more than 300 projects, allocated an outlay of Rs 8,000 crore, to clean Yamuna River and solve the city's sewage woes, Chief Minister Rekha Gupta said on Friday. Gupta held a meeting with Water Minister Parvesh Verma and top Delhi Jal Board (DJB) officials to review the work underway to fix the drainage and sewer system in the city. "The Delhi government is implementing a multi-pronged and phased plan for Yamuna rejuvenation, which includes drain treatment, sewerage network expansion and setting up of modern Sewage Treatment Plants (STPs)," the chief minister said in a statement. In the meeting, according to the statement, she reviewed a 45-point action plan, which included capacity enhancement and upgradation work at existing STPs located in Yamuna Vihar, Okhla, Keshopur, Vasant Kunj, Ghitorni, Mehrauli, and Molarbandh under the AMRUT 2.0 scheme and one each in Nilothi and Pappan Kalan. Gupta directed officials to replace old pipelines in phases. "Many parts of Delhi are still operating on decades-old water and sewer pipelines, which are no longer sustainable due to rapid urban growth and increasing demand. Officials have been instructed to undertake phase-wise planning and use modern technology to replace old infrastructure," she said. According to officials, the 303 drainage projects involve redevelopment of major drains, permanent solutions for waterlogging, installation of modern pumps, de-silting of drains, expansion of stormwater systems, and scientific drainage network management. Gupta said she will personally visit the Yamuna every month to check the progress in its cleaning. She also claimed that Delhi will soon become a 'model' city in terms of equitable water distribution under the Centre's Har Ghar Nal Se Jal initiative. Verma stated that strict directions have been issued for immediate action against the illegal discharge of untreated sewage and industrial waste in the city. "This is a crisis that can no longer be ignored. Delhi cannot afford to let untreated sewage flow into its lifelines. No polluter will be spared. We will act and act fast," he said.