
Good news India's first bullet train project... Siemens consortium bags contract for..., its worth...
Good news India's first bullet train project... Siemens consortium bags contract for..., its worth...
Ahmedabad-Mumbai bullet train: In a major development in the India's first bullet train project between Ahmedabad and Mumbai a Siemens consortium has now been awarded the contract for signalling and telecom systems on the high-speed rail corridor by National High Speed Rail Corporation Limited.
The Mumbai-Ahmedabad High-Speed Rail Corridor, India's first bullet train project, is currently under construction, aiming to significantly reduce travel time between the two major cities. The project is expected to be completed by 2028.
The contract is for implementing advanced signalling and telecommunication systems for the Mumbai-Ahmedabad bullet train initiative.
Siemens will deploy European Train Control System (ETCS) Level 2-based signalling and train control systems under the contract. These systems support train speeds up to 350 km/h, provide real-time monitoring, ensure continuous wireless connectivity and offer centralised traffic control capabilities.
The ETCS Level 2 signalling standard has been successfully implemented across more than 50 nations worldwide.
The National High Speed Rail Corporation Limited (NHSRCL) serves as the organisation responsible for executing India's first high-speed bullet train project.
'The order valued at approximately Rs. 4,100 crores, includes Siemens Limited's share of Rs 1,230 crore for the design, installation, and long-term maintenance of advanced signaling and telecommunications technologies,' according to an official statement released by Siemens Limited.
The statement further said, 'The project is expected to be executed over a period of 54 months, with Siemens providing 15 years of maintenance services, ensuring lifecycle reliability.''As a consortium, we are proud to partner with National High Speed Rail Corporation Limited, in the prestigious high-speed rail project. This project reflects our commitment to 'Make in India' and delivering technologies that promote sustainable and future-ready mobility,' Sunil Mathur, managing director and chief executive officer, Siemens Limited, said.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Indian Express
31 minutes ago
- Indian Express
ACB arrests AMC estate inspector in disproportionate assets case
The Gujarat Anti-Corruption Bureau (ACB) arrested an estate inspector of the Ahmedabad Municipal Corporation (AMC) for alleged possession of disproportionate assets (DA) to the tune of Rs 3.07 crore, according to a statement. The ACB statement issued on Thursday stated that the accused Jignesh Surendra Shah, a Class-2 Estate/TDO Inspector of East Zone of the AMC, was booked and arrested for the alleged possession of disproportionate assets (DA) to the tune of Rs 3.07 crore, which it alleged was 102.47% disproportionate to his known sources of income. According to the statement, the ACB conducted its preliminary inquiry based on an application it received regarding Shah's allegedly disproportionate assets. The ACB said that the period of investigation ranged between April 1, 2012 and March 31, 2022, during which the officer had allegedly used unlawful means to accumulate disproportionate assets. The investigation is being carried out by ACB Police Inspector VD Chaudhary. Further probe into the matter is underway.


Time of India
37 minutes ago
- Time of India
Strict action will be taken against projects lacking proper permissions, says HYDRAA chief
Hyderabad: At the Times Home Hunt Property Expo held recently, Hyderabad Disaster Management and Asset Protection Agency (HYDRAA) commissioner A V Ranganath cautioned that any new projects lacking proper permissions or built on encroached land will face strict action. 'Only layouts approved before HYDRAA's formation on July 19 last year will be exempt. All others must comply with current regulations,' said Ranganath, noting that unchecked construction contributed significantly to urban issues like flooding and traffic congestion. HYDRAA was set up not just as a watchdog, he said, but also as a proactive body aimed at promoting sustainable and responsible urban development. 'HYDRAA is not just about demolitions. We are focused on creating a healthier, more environmentally conscious real estate ecosystem,' Ranganath added. The authority is working closely with other agencies to rejuvenate lakes, address urban flooding, and improve drainage infrastructure. He also pointed out that traffic congestion alone costs the state nearly Rs 300 crore in infrastructure loss, underscoring the need for better planning. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch vàng CFDs với mức chênh lệch giá thấp nhất IC Markets Đăng ký Undo 'We received criticism that HYDRAA slowed real estate activity, but there were geopolitical concerns, delays in RERA clearances, and approval bottlenecks at GHMC and HMDA—also played a role. If a project is legally approved, we won't interfere. Our aim is to ensure compliance and environmental responsibility,' he said.


Time of India
37 minutes ago
- Time of India
JDA to construct 71 sector roads
Jaipur: With city roads deteriorating due to potholes, craters, and uneven surfaces, the Jaipur Development Authority (JDA) has decided to construct 71 sector roads under its annual road maintenance programme. Though these roads were part of the Master Plan 2025, the JDA had been unable to execute them earlier due to various delays. Now, a portion of the road maintenance fund will be allocated for their construction. "We have four categories of sector roads – A, B, C, and D. Out of 226 proposed A and B category roads in the Master Plan, 71 will now be developed. The civic body has already granted administrative and financial approval of Rs 454 crore for the project," a senior JDA official said. During the previous Congress govt, sector roads were prioritised by category, with 'A' being the most critical. A JDA engineer added that these 71 roads were selected based on future traffic needs and planned settlements along both sides. "Several rounds of discussions were held between zone deputy commissioners and zonal engineers to finalise the list of sector roads. We also considered the availability of land and the number of encroachments to be removed before selection. Hopefully, construction will proceed smoothly," said a JDA engineer. Officials confirmed that out of the 71 sector roads, six will be developed near Niwaru Road and Govindpura, 13 near Muralipura, nine in Mansarovar and Bhankrota, two near Delhi and Agra Roads, and 16 in the Vartika area. "Tenders have already been floated for some of them," an official added.