logo
Centurion's sinkhole problem digs deeper hole in city's pockets

Centurion's sinkhole problem digs deeper hole in city's pockets

The Citizen13-05-2025

The sinkhole currently measures at approximately 40m in diameter and 3.5m in depth.
A sinkhole at Burger Ave And Langebrink Rd in Lyttelton Manor, Centurion on 9 May 2025. Picture: Gallo Images / Lefty Shivambu)
A third sinkhole formed in Centurion last week – one of an estimated 50 that the city did not have the budget to fix.
About 25 households of Lyttleton Manor in Centurion were locked in their area on Friday after a huge new sinkhole formed overnight at the corner of Burger Avenue and Langerbrink Road.
City of Tshwane spokesperson Lindela Mashigo said the sinkhole currently measured at approximately 40m in diameter and 3.5m in depth.
'The sinkhole remains unstable and active and therefore the area has been cordoned off and would be closed to all traffic until further notice,' Mashigo said.
Water supply affected
The sinkhole has affected critical underground infrastructure, including water supply lines. As a precaution, water supply to the area has been temporarily shut off in parts of Lyttleton Manor, Kloofsig and the Lyttleton Manor Extension 6 industrial area.
Earlier this year, the city said that R14.5 million had been allocated during the current financial year to repair nine small and low-priority sinkholes and in March, Mashigo said there were no emergency funds allocated for sinkholes.
A concerned resident who declined to be named, said the water and power were restored in the early hours of Saturday.
ALSO READ: WATCH: In lockdown with no water or electricity … thanks to a sinkhole
A sinkhole problem
The sinkhole was bigger when he left for work yesterday after work was done on Sunday.
'On Sunday, they were changing water pipes. We had a water tank to provide us with water in the meantime,' he said.
The residents said they were waiting for feedback on the restoration of the road. This is the third massive sinkhole in Centurion this year, after two developed in Lyttleton in February – one on the corner of Trichardt and Van Riebeeck Street in Lyttleton and another on DF Malan Road.
Lyttleton councillor Johan van Buuren said he had four sinkholes in his area, two old ones and two that formed earlier this year. 'No further work has been done on any of them,' he said.
While the City of Tshwane was out fixing a hole here and there, more complaints flooded in, with some residents saying a hole they had reported last year was still unrepaired.
Margaret Brown, who lives in Centurion, said she reported the pothole on the main road in and out is Apiesdoring Drive before Christmas. To date, nothing has been done about them.
Shirley Becker said she lost a tyre and rim due to a pothole in Pretorius Street and had to fork out R3 000 to repair the damage, while Paula Calitz said a pothole in Botha Avenue cost her R60 000 in repairs last year.
NOW READ: Drive to repair Tshwane's 'five' potholes

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

The Lotto results for Saturday, 21 June 2025
The Lotto results for Saturday, 21 June 2025

The South African

time19 hours ago

  • The South African

The Lotto results for Saturday, 21 June 2025

It's time for today's Lotto, Lotto Plus 1 and Lotto Plus 2 draws. Will you be South Africa's next Lotto multimillionaire? Lotto, Lotto Plus 1 and Lotto Plus 2 jackpot estimates: Lotto – estimated at R3 million Lotto Plus 1 – estimated at R20 million Lotto Plus 2 – estimated at R15 million If you want to win your share of the jackpot, you have to play! You know what they say, you've got to be in it, to win it. NOTE: The numbers drawn will appear below as soon as they are available at or after 21:00. View the latest version of this page to verify whether the numbers have been updated. Draw Date: 21 June 2025 Lotto Numbers: 0, 0, 0, 0, 0, 0 Bonus Ball: 0 Lotto Plus 1 Numbers: 0, 0, 0, 0, 0, 0 Bonus Ball: 0 Lotto Plus 2 Numbers: 0, 0, 0, 0, 0, 0 Bonus Ball: 0 Did you miss a draw and wonder if you're actually a millionaire? Click here to view past Lotto, Lotto Plus 1 and Lotto Plus 2 and payouts. The Lotto, Lotto Plus 1, and Lotto Plus 2 draws take place every Wednesday and Saturday on SABC 2 at 20:56 (SA time) Players buy tickets with their choice of six different numbers between 1 and 52. There is provision for random numbers to be generated automatically for those who do not wish to choose, known as a Quick Pick. When introduced, the Lotto jackpot draw required numbers from 1 to 49. Ithuba Holdings increased the number from 49 to 52 on 30 July 2017. In the draw, six numbered balls are drawn without replacement from a set of 52 balls numbered from 1 to 52. A further Bonus Ball is also drawn, which only affects players who match five numbers. Prizes are awarded to players who match at least three of the six drawn numbers, with prizes increasing for matching more of the drawn numbers. All players who match all six drawn numbers win equal shares of the jackpot. The chance of doing so is 1 in 20,358,520. If four, five, or six balls are matched, the relevant prize is divided equally between all who match that many balls. If no player matches all six numbers, the jackpot rolls over and is added to that of the next Lotto draw. The entry fee to the Lotto draw is set at R5.00 per board. Lotto Plus 1 is exactly the same as Lotto, but gives the player a second chance to win. When buying a Lotto ticket, players can pay an extra R2.50 per board to enter the Lotto Plus 1 draw. Odds are the same, while prizes are usually slightly lower. Lotto Plus 1 was introduced on 26 November 2003. Lotto Plus 2 is exactly the same as Lotto, but gives the player a third chance to win. When buying a Lotto ticket, players can pay an extra R2.50 per board to enter the Lotto Plus 2 draw. Odds are the same, while prizes are usually slightly lower. Lotto Plus 2 was introduced on 30 July 2017. Buy your tickets now at your nearest participating retailer, on our website by visiting national using your computer or mobile site, via the National Lottery Mobile App, or participating banks, namely FNB, ABSA, Nedbank, Standard Bank, Capitec, TymeBank and African Bank otherwise dial 120 7529# for USSD. Winners who win R50 000 and above receive free trauma counselling from professional psychologists and financial advice from accredited financial advisors absolutely free. At the same time, winnings are paid tax-free directly into the winner's accounts. If you are buying tickets from a lottery outlet, they close at 20:30 on the day of a draw Players must be 18 years old. Monday: Daily Lotto Daily Lotto Tuesday: Daily Lotto + PowerBall and PowerBall Plus Daily Lotto + PowerBall and PowerBall Plus Wednesday: Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Thursday: Daily Lotto Daily Lotto Friday: Daily Lotto + PowerBall and PowerBall Plus Daily Lotto + PowerBall and PowerBall Plus Saturday: Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Daily Lotto + Lotto, Lotto Plus 1 and Lotto Plus 2 Sunday: Daily Lotto For more details and to verify the winning numbers, visit the National Lottery website. You must always confirm the official winning numbers on the National Lottery website. We do our best to post the results as accurately as possible, but the National Lottery is the only source you can use to 100% verify the results. Let us know by leaving a comment below, or send a WhatsApp to 060 011 021 1 Subscribe to The South African website's newsletters and follow us on WhatsApp, Facebook, X and Bluesky for the latest news.

Bethal SPCA appeals for public support amid immense financial strain
Bethal SPCA appeals for public support amid immense financial strain

The Citizen

timea day ago

  • The Citizen

Bethal SPCA appeals for public support amid immense financial strain

The Bethal SPCA continues to serve animals in need, thanks to the generosity of local residents and businesses. However, the organisation is facing serious financial challenges that threaten its ability to provide critical animal welfare services across Bethal, Kriel, Standerton, Ermelo, Davel, Morgenzon, and surrounding informal settlements. Relying solely on donations, the SPCA needs approximately R60 000 per month to remain operational. While the committee is grateful for continued support from loyal donors, increased assistance is urgently needed. The Bethal SPCA employs one full-time trainee inspector, Ailene Galloway, and two permanent staff members. Due to the large area they cover, more inspectors are needed, but the current budget does not allow for additional hires. Committee members have also raised concerns about declining public engagement compared to previous years—possibly a result of tough economic conditions. 'There seems to be a growing disconnect between people and animals. It's important for the public to understand the SPCA's vital role in protecting animals and promoting responsible pet care. That's why education remains a key focus,' said chairperson Louis Van Den Heever. The team conducts community outreach and school visits to raise awareness and encourage compassion for animals. The current committee includes: Louis van den Heever (chairperson); Wilma Verwey (vice-chairperson); Carli van den Heever (secretary); Andre du Plessis (treasurer); Sandile Sibeko (member); Yolandi Pretorius (member). ALSO CHECK: eMbalenhle community rescues over 100 boys from illegal initiation schools in Standerton The SPCA acknowledges public concern over euthanasia, explaining that due to the overwhelming number of unwanted animals and limited space, it is sometimes unavoidable. 'We do not believe in euthanising healthy animals, but turning animals away, as some 'no-kill' shelters do, can lead to greater cruelty,' said Van den Heever. Animals are evaluated based on age, time in the kennels, stress levels, and health before any decision is made. Adoption remains the preferred outcome, and the public is urged to adopt, not shop. To help fund operations, the SPCA has launched an Adopt-a-Kennel initiative for R200 per month. Every donation—big or small—can make a difference. Other vital services include: A drop-off kennel for anonymous animal surrenders; microchipping, which helps quickly reunite lost pets with their owners; collaboration with law enforcement in cases of animal cruelty Current needs include: Additional and upgraded kennels; boundary fencing; volunteers; dog and cat food; blankets and heating bulbs; tyres, fuel, and vehicle servicing; JoJo water tank; gardening tools; cleaning supplies. The SPCA also operates a charity shop and encourages the community to support it. Currently available for adoption: 14 dogs, five cats and one horse. Visit the Bethal SPCA Facebook page for updates on adoptions. Banking details: Standard Bank, account name SPCA Bethal, account number: 03 103 325 3, branch code: 052544, account type: cheque/current For more information: Office: 066 397 1630; Emergencies: 072 573 3122; Email: office@ 'Together, we can make a lasting difference in the lives of animals who rely on us,' concluded Van den Heever. At Caxton, we employ humans to generate daily fresh news, not AI intervention. Happy reading!

Thubalethu housing project faces delays and financial mismanagement in KwaZulu-Natal
Thubalethu housing project faces delays and financial mismanagement in KwaZulu-Natal

IOL News

time2 days ago

  • IOL News

Thubalethu housing project faces delays and financial mismanagement in KwaZulu-Natal

KwaZulu-Natal's Thubalethu housing project, which has seen R100 million spent since 2017, remains incomplete, raising concerns over delays, financial mismanagement, and the lack of essential infrastructure. Image: Supplied KwaZulu-Natal's housing woes continue to mount, with R100 million spent since 2017 on the incomplete Thubalethu housing project in Mthonjaneni Municipality (Melmoth). Continued delays, escalating costs, and an incomplete delivery of the project are cause for concern, said Riona Gokool, the Democratic Alliance spokesperson on Human Settlements, on Thursday. According to Gokool, Phase 1A has seen 166 units completed and occupied, while an additional 270 houses in Phase 1B remain incomplete and unsecured. She said that basic fittings such as plumbing, electricity, doors, and ceilings have not been installed due to fears of theft and vandalism, with more than 430 houses only partially constructed to roof level. Video Player is loading. Play Video Play Unmute Current Time 0:00 / Duration -:- Loaded : 0% Stream Type LIVE Seek to live, currently behind live LIVE Remaining Time - 0:00 This is a modal window. Beginning of dialog window. Escape will cancel and close the window. Text Color White Black Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Background Color Black White Red Green Blue Yellow Magenta Cyan Transparency Opaque Semi-Transparent Transparent Window Color Black White Red Green Blue Yellow Magenta Cyan Transparency Transparent Semi-Transparent Opaque Font Size 50% 75% 100% 125% 150% 175% 200% 300% 400% Text Edge Style None Raised Depressed Uniform Dropshadow Font Family Proportional Sans-Serif Monospace Sans-Serif Proportional Serif Monospace Serif Casual Script Small Caps Reset restore all settings to the default values Done Close Modal Dialog End of dialog window. Advertisement Next Stay Close ✕ Ad loading In addition, key infrastructure remains absent, with not a single cent of the R60 million allocated for bulk water infrastructure spent to date 'Equally, sewer systems, a reservoir, road access, and a sufficient electricity supply are all either incomplete or delayed. This is while local and district municipalities have cited financial constraints and poor planning coordination,' she stated. Gokool said that the project initially approved in 2012 to eradicate informal settlements has become yet another example of a 'blocked project', a distressing term that has become all too common in South Africa's housing landscape. Gokool called for: Full transparency from the KZN's DHS regarding all contracts, expenditure, and progress on the Thubalethu project. An audit and consequence management process for delays and any possible financial mismanagement. Acceleration of bulk infrastructure rollout, particularly water, sewer, and electricity connections. Engagement with local communities to prevent further vandalism and to involve beneficiaries in safeguarding the site. According to a report presented to the KwaZulu-Natal Legislature Human Settlements Portfolio Committee, the housing project experienced various challenges that have hindered progress, with many of these being addressed or are currently being addressed. Continuous delays in the completion of the project have resulted in vandalism and theft. According to the report: The National Home Builders Registration Council (NHBRC) and engineers identified non-compliance on some sites with specific reference to water seepage and retaining walls. The current electrical power for Thubalethu Township is not sufficient for the whole area of Melmoth. The current area of Thubalethu and its surrounding areas does not have enough water, and the water scheme to source water from Phobane Dam i s under way, but will reach the town of Melmoth and Thubalethu Township in four to eight years from 2021. In June 2023, a Crack Team was formed by the KZN DHS to identify, resolve, and report on all matters that are causing the project to stall. The team identified funding as a challenge for the design of the water purification plant. The finding was that the water borehole was level 2 and therefore needed to be purified to consumable level 0.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store