
Infrastructure must also safeguard health of people: Ahsan
ISLAMABAD: Federal Minister for Planning, Development and Special Initiatives Professor Ahsan Iqbal addressed a high-level event jointly organised by the Asian Infrastructure Investment Bank (AIIB) and the Pakistan Institute of Development Economics (PIDE), marking the launch of AIIB's flagship report, Asian Infrastructure Finance 2025: Infrastructure for Planetary Health, said a press release.
The minister stated that the launch of this report is both timely and deeply relevant to Pakistan's national and global development goals.
Speaking to a distinguished audience comprising experts from PIDE, representatives of AIIB, development partners, and leaders from across sectors, the minister emphasised that Pakistan is standing at a critical moment, a point where infrastructure must not only support economic growth but also safeguard the health of its people and the health of the planet.
Iqbal underlined that infrastructure today encompasses much more than roads, buildings, or power plants. It is equally about the air quality, the water nation drinks, and the healthcare systems that protect its people. He said this broader definition of infrastructure touches the idea of planetary health, where human health is intrinsically linked to the health of nature and the planet.
Iqbal made clear that the Government of Pakistan is not allowing any infrastructure project to move forward unless it takes into account climate resilience, public health, and environmental protection. He affirmed that working in silos has ended, as every sector and system, be it hospitals, schools, transport systems, sewage networks, or electricity grids, must be integrated and climate-ready to remain functional and safe during natural disasters.
The minister added that the government recognises the need to reduce dependence on fossil fuels and is actively investing in solar, wind, and green hydrogen technologies as part of its transition to cleaner energy.
He stated that Pakistan is embracing nature-based solutions, highlighting ongoing initiatives such as planting mangroves along the country's coastal areas and developing green parks in cities, calling these smart, cost-effective, and equitable methods to enhance resilience.
Iqbal pointed out that the data in the AIIB report echoes Pakistan's lived reality, diseases are rising due to floods and substandard water systems, food insecurity is worsening due to changing rainfall patterns, erratic rains are contributing to higher infant mortality, and lead pollution from industries and batteries is damaging children's health and brain development.
He stressed that these phenomena are not abstract projections but are unfolding across Pakistan in real time. From floods and heatwaves to smog and water shortages, the impacts of climate inaction have become embedded in daily life. Iqbal assured that Pakistan is not beginning from scratch. The government has already started aligning national plans with the concept of planetary health.
He specifically cited the 'Uraan Pakistan' initiative and the government's Five Es Framework as part of a comprehensive national agenda to promote climate-smart, health-responsive, and inclusive infrastructure. Under Uraan Pakistan, the government has begun transitioning to zero-emission electric buses in public transport, restoring riverbanks and wetlands to reduce flooding risks and promote green tourism, and upgrading healthcare centres to make them energy-efficient and resilient in the face of disasters.
He highlighted that these efforts are well-aligned with the principles highlighted in AIIB's report, which promotes a transformative model of infrastructure that links sustainability with biodiversity conservation, public health outcomes, and climate resilience.
Citing findings from the Global Commission on Adaptation, Prof Iqbal noted that every dollar invested in climate-resilient infrastructure can generate a fourfold return by avoiding future losses. He said Pakistan is incorporating urban green infrastructure solutions, including green belts, permeable surfaces, and climate-sensitive zoning regulations, which are proven to reduce urban temperatures by up to 4°C and mitigate extreme heat, particularly in cities like Jacobabad and Lahore.
He added that the restoration of mangroves in coastal areas, already underway in Pakistan, is reducing storm damage by up to 30 to 50 percent while simultaneously improving fish livelihoods.
Concluding his address, Prof Iqbal stated that historically, infrastructure planning in Pakistan has prioritized quantity over quality and expansion over resilience. He affirmed that the government is turning this page decisively and is committed to a new era of planning grounded in the principles of climate-smart, health-protective, inclusive, and sustainable infrastructure development.
Copyright Business Recorder, 2025
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Recorder
a day ago
- Business Recorder
Ahsan visits under-construction National Police Hospital, Islamabad
ISLAMABAD: Federal Minister for Planning Ahsan Iqbal paid a visit to the under-construction National Police Hospital located in Sector H-11, Islamabad and directed the concerned authorities to ensure the timely completion of the project by June 2026. He was accompanied by Minister of State for Interior Talal Chaudhry, Inspector General of Islamabad Police, and Deputy Commissioner Islamabad. During the visit, the federal minister reviewed the construction progress and expressed satisfaction over the pace of work. He directed the concerned authorities to ensure the timely completion of the project by June 2026, emphasising that the hospital is a significant step towards the welfare and healthcare of police personnel. 'This project reflects the state's firm commitment to supporting law enforcement agencies. Our police force forms the frontline of internal security, and it is the state's responsibility to ensure their health and wellbeing,' he said. Sharing details of the project, the minister said the National Police Hospital will be a state-of-the-art facility with a capacity of 250 beds. It will provide services in general medicine, surgery, emergency care, and other specialized areas. Upon completion, it will directly benefit nearly 12,000 police personnel by offering them access to modern medical facilities. He noted that the project was approved in May 2023 and underscored the importance of its timely completion. 'These projects are funded by taxpayers' money and must be treated as a national trust. Any negligence in their delivery is unacceptable,' he said. Officials from the relevant ministries, engineers, and project stakeholders briefed the minister on the current status and progress of construction. Iqbal instructed all involved to maintain transparency, quality, and speed in implementation, adding that sustainable and timely completion of development projects is vital for the uplift of vulnerable segments of society and the strengthening of state institutions. Copyright Business Recorder, 2025


Business Recorder
a day ago
- Business Recorder
CDWP clears five projects costing Rs55bn
ISLAMABAD: The Central Development Working Party (CDWP) cleared five development projects at a total cost of Rs55.164 billion. The CDWP approved two development projects of value Rs7.725 billion and recommended three projects at the cost of Rs47.439 billion to the Executive Committee of the National Economic Council (ECNEC) for final approval. The CDWP met with Federal Minister for Planning, Development and Special Initiatives and Deputy Chairman of the Planning Commission, Ahsan Iqbal, in the chair at P-Block Secretariat. CDWP approves eight development projects The meeting was attended by Awais Manzur Sumra, Secretary Planning, along with Chief Economist, VC PIDE, other members of the Planning Commission, federal secretaries, heads of Provincial Planning and Development (P&D) boards/departments, and senior representatives from relevant federal ministries and provincial governments. The agenda focused on development projects across key sectors, including environment, food and agriculture, health and physical planning and housing. A project related to environment sector presented in the meeting namely, 'Installation of Weather Surveillance Radar at Sukkur in the Islamic Republic of Pakistan – Revised' at cost of Rs5.73 billion was approved by CDWP forum. Another project of the PP&H sector presented in the forum namely, 'Special Development Initiatives for Backward/ Poor District in Country (50:50)' worth Rs1,999.988 million was approved by the CDWP for Kashmore District, Sindh. The deputy chairman Planning Commission (DCPC) formed a committee to oversee and confirm scope and cost along with the design and construction of the project. A project related to health sector presented in the meeting namely, 'Expansion of Armed Forces Institute of Cardiology and National Institute of Heart Diseases (AFIC-NIHD), Rawalpindi' at an estimated cost of Rs25.458 billion and in-principal recommended to the ECNEC with concerns and funding confirmation. The upgradation and expansion of the Armed Forces Institute of Cardiology and National Institute of Heart Diseases (AFIC-NIHD) aims to significantly enhance the hospital's capacity and quality of care to meet growing cardiac healthcare demands over the next two decades. Key objectives include increasing indoor bed capacity from 420 to 800, establishing 10 state-of-the-art modular operation theatres, enhancing diagnostic capabilities with advanced MRI and CT scanners, expanding outpatient services with 20 additional specialist clinics, and upgrading the angiography setup and compliance with international healthcare standards such as JCIA, FGI, and ASHRAE. The minister accorded in-principle approval and formed a committee to rationalise cost/ scope and directed the sponsors to explore alternative financing options for the project in view of tight resource position for PSDP funding. A project related to food and agriculture sector presented in the meeting namely, 'Balochistan Livelihoods and Entrepreneurship Project' recommended to ECNEC at a revised cost of Rs12.462 billion. The project source of financing is through World Bank and International Development Association (IDA) and MDTF. The main objective of the project is to promote employment opportunities for rural communities and ensure the sustainability of enterprises in eight districts of Balochistan including Chagai, Qilla Abdullah, Killa Saifullah, Mastung, Nushki, Pishin, Sherani, and Zhob. The project aims to benefit rural households by supporting livelihoods through enterprise development and job creation. Another project of physical planning and housing sector presented namely, 'Construction of New Balochistan Assembly at Quetta' worth Rs9.52 billion in-principal approved the project and recommended to ECNEC for further considerations. The main objective of the project is to construct a new assembly building being planned in Quetta to replace the existing structure, can no longer accommodate the full strength of assembly members. The proposed facility, spanning a covered area of 250,000 square feet across a double basement, ground, first, and second floors, will feature a modern Main Assembly Hall with increased seating capacity, dedicated chambers for the chief minister, speaker, and deputy speaker, ministerial offices, administrative areas with a conference hall, and comprehensive parking and allied infrastructure. While reviewing the project, DCPC Ahsan Iqbal also constituted a committee to rationalise its cost scope before submission to the ECNEC for final approval and directed that top quality consulting firms should be engaged for designing and supervision work. New Balochistan Assembly building will be a gift of the federal government for the people of Balochistan. PM Shehbaz Sharif gave approval for the funding of the project. Copyright Business Recorder, 2025


Express Tribune
a day ago
- Express Tribune
Minister says M-6 to cost Rs364b
Minister for Planning, Development and Special Initiatives has clarified that the Cost of M-6 Hyderabad-Sukkur Motorway rationalized from 395 billion to 364 billion. It is to clarify that during the Central Development Working Party (CDWP) meeting held on June 18, 2025, an error was made in the cost figure of the Hyderabad-Sukkur Motorway (M-6) project, which was inadvertently reported, said a release issued here on Friday. The correct revised cost of the project, as recommended to the Executive Committee of the National Economic Council (ECNEC), is Rs364 billion, not Rs395 billion as initially stated in press release.