logo
#

Latest news with #StateInfrastructure

Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP
Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP

Barnama

timea day ago

  • Health
  • Barnama

Perak Govt Hopes JRTB Upgrade Will Be Included In 13MP

IPOH, June 21 (Bernama) -- Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Perak seeks JRTB upgrade in 13MP after fatal bus crash
Perak seeks JRTB upgrade in 13MP after fatal bus crash

The Sun

timea day ago

  • Health
  • The Sun

Perak seeks JRTB upgrade in 13MP after fatal bus crash

IPOH: Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Perak govt hopes JRTB upgrade will be included in 13MP
Perak govt hopes JRTB upgrade will be included in 13MP

The Sun

timea day ago

  • Health
  • The Sun

Perak govt hopes JRTB upgrade will be included in 13MP

IPOH: Perak Menteri Besar Datuk Seri Saarani Mohamad has expressed hope that the proposal to upgrade the East-West Highway (JRTB) linking Gerik and Jeli will be included in the 13th Malaysia Plan (13MP). Saarani said the state government had conveyed its intention to Prime Minister Datuk Seri Anwar Ibrahim during his visit to Lumut last week. 'What's most important is to reassess the alignment and widening of the JRTB. The upgrade involves more than just resurfacing; it requires a full reconstruction, as the existing structure is so old that some of the damage has exposed the road base. 'This highway has been in use for over 40 years, and simply patching up damaged sections may no longer be sufficient. However, the state government fully understands that constructing a new alignment or rebuilding the JRTB would require substantial funding,' he said at a press conference after officiating the closing ceremony of the 2025 National Training Week at the Ipoh Convention Centre here today. Saarani said the state government has also instructed the State Infrastructure, Energy, Water and Public Transport chairman, Datuk Seri Mohammad Nizar Jamaluddin, and Human Resources, Health, Indian Community Affairs and National Integration chairman A. Sivanesan, to prepare a report and study on upgrading the JRTB and Gerik Hospital. 'Mohammad Nizar will obtain information and data from the Works Ministry regarding the upgrade of the JRTB, while Sivanesan is working on applying to the Health Ministry for the upgrading of Gerik Hospital, as there is an urgent need in the event of accidents. Typically, victims are taken to Hospital Taiping or the Raja Permaisuri Bainun Hospital. 'If upgraded, it would be sufficient for patients or victims to be treated at Gerik Hospital, provided it is equipped with the necessary facilities and expertise. Once the study is completed, we will submit a letter to the relevant ministry,' he added. In the early hours of June 9, a tragic accident along the JRTB near Tasik Banding, Gerik, claimed the lives of 15 Universiti Perguruan Sultan Idris (UPSI) students when the chartered bus transporting them from Jertih, Terengganu, to the main campus in Tanjong Malim, Perak, was involved in a crash. The crash also left 33 others injured, including the bus driver and his assistant, as well as the driver and three passengers of a multi-purpose vehicle.

Batu Ferringhi coastal erosion project nears completion
Batu Ferringhi coastal erosion project nears completion

New Straits Times

timea day ago

  • Business
  • New Straits Times

Batu Ferringhi coastal erosion project nears completion

GEORGE TOWN: The coastal erosion mitigation project at Batu Ferringhi has made significant progress, with sandbag installation works now 95 per cent completed. State Infrastructure, Transport and Utility Committee chairman Zairil Khir Johari said the initiative, which started in April, was funded through an emergency allocation of RM250,000. "The project, covering a 130m stretch from Rasa Sayang Hotel to Golden Sands Hotel, is now in its final stages, with contractors focusing on finishing works," he said in his latest Facebook entry. He also showed several photos of the work done. Zairil said, in addition to the immediate response, a long-term solution was underway under the 12th Malaysia Plan (12MP), with an estimated cost of RM61 million. He said the Department of Irrigation and Drainage (DID) is currently in the process of appointing surveyor for hydrographic survey of the coastline, which spans from Batu Ferringhi to Tanjung Bunga. "Physical works for the long-term solution are expected to begin next year or 2027," he added. During a visit here in April, Deputy Energy Transition and Water Transformation (Petra) Minister Akmal Nasrullah Mohd Nasir said the federal government had approved a RM61 million budget for vital restoration works for Batu Ferringhi following erosion issue. He said the project would focus on both immediate protection and long-term preservation, with particular details to maintaining the beach's attractiveness as a tourist destination. The design, to be finalised this year, would incorporate a combination of solutions such as breakwaters, sand nourishment, and other mitigation measures to stabilise the area and protect the 7km beachfront, stretching from Batu Ferringhi to Tanjung Bunga. The Batu Ferringhi beach, one of Penang's most iconic tourist destinations, has experienced considerable degradation over the past few years due to shifting sand and constant wave action.

Perak to propose upgrades to JRTB, suggests development of new alignment
Perak to propose upgrades to JRTB, suggests development of new alignment

The Sun

time11-06-2025

  • Automotive
  • The Sun

Perak to propose upgrades to JRTB, suggests development of new alignment

IPOH: The Perak government will submit a proposal to the federal government to upgrade the East-West Highway (JRTB) linking Gerik and Jeli, said Menteri Besar Datuk Seri Saarani Mohamad. He said the state government will also propose the development of a new alignment to replace the current route, which links Perak to the East Coast states. 'The matter (proposal to improve JRTB) was discussed during the state executive council meeting today. 'I have asked Datuk Seri Mohammad Nizar Jamaluddin (State Infrastructure, Energy, Water, and Public Transport Committee chairman) to prepare the proposal,' he said, adding that he would also propose the matter to Prime Minister Datuk Seri Anwar Ibrahim during his working visit to Lumut this Sunday. He spoke to reporters today after officiating the closing ceremony of Perak Export Day 2025, hosted by the Malaysia External Trade Development Corporation, which was also attended by its chairman, Datuk Seri Reezal Merican Naina Merican, here. Elaborating, Saarani said JRTB has been out of concession for the past 40 years, adding that it is high time to conduct a more thorough review of the route. 'Parts of the road have worn down to the base, exposing the soil. Patching is no longer an option. That's why we've asked Datuk Seri Nizar to outline what needs to be done in terms of alignment, road widening, construction materials, and all necessary elements, including street lighting and road markings,' he said. Meanwhile, Saarani said the state government will also propose the upgrading of Gerik Hospital, as well as increasing the number of related facilities and medical specialists along the route. 'In the event of a major incident, Gerik Hospital is insufficient to handle a large number of casualties. The federal government should also consider providing additional facilities such as mobile police stations or fire and rescue brigades along the JRTB route,' he said, adding that this is to ensure shorter response time. On Monday, 15 Universiti Perguruan Sultan Idris (UPSI) students were killed when a chartered bus travelling from Jertih, Terengganu, to the university's main campus in Tanjung Malim, Perak, overturned after colliding with a multi-purpose vehicle on the highway.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store