logo
#

Latest news with #DXBMediaOffice

Dubai floods: Massive Dhs277 million rainwater drainage project completed in Nad Al Sheba
Dubai floods: Massive Dhs277 million rainwater drainage project completed in Nad Al Sheba

Time Out Dubai

timea day ago

  • Business
  • Time Out Dubai

Dubai floods: Massive Dhs277 million rainwater drainage project completed in Nad Al Sheba

A massive Dhs277 million flood defence project has been completed in Dubai. Serving an area of 340 hectares and encompassing 300 plots of land, the newly completed infrastructure can be found in the Nad Al Sheba 3 neighbourhood. The completed 24km sewerage system includes 11km of household connections and links up with the Dubai Municipality's main sewerage network. An advanced pumping station with a capacity of 4,000 litres per second has been installed, which will allow for more efficient water flow and improved rainwater management. The Dhs277 million project forms part of the municipality's strategic plans to upgrade and future-proof Dubai's infrastructure when battling environmental challenges. Demand for sewerage and rainwater projects in the city has soared following the historic levels of the Dubai floods of 2024. It is part of the city's wider Dhs30 billion Tasreef project, which will develop Dubai's rainwater drainage network, and the Dhs80 billion sewerage system upgrade programme. Dubai Municipality announces the completion of a sewerage and rainwater drainage network development project in Nad Al Sheba 3, at a total cost of AED 277 million. Linking up with the Municipality's main sewerage network, the integrated 24-km sewerage system includes 11 km of… — Dubai Media Office (@DXBMediaOffice) June 18, 2025 The completed Dubai flood project spans approximately 24 kilometres and has pipeline diameters ranging from 200 to 800 millimetres. It aims to enhance public health standards, maintain environmental sustainability and facilitate more efficient future maintenance works. The 11km of household connections will link the homes of citizens, new residential units and other properties directly to the main network. Dubai Municipality approved the Dubai flood project (Credit: Dubai Media Office) Marwan Ahmed bin Ghalita, Director General of Dubai Municipality, said that the completed Nad Al Sheba project is a big step towards connecting all areas of Dubai to the drainage network. He said: 'Completing the Nad Al Sheba 3 project is a significant step towards connecting all areas of Dubai to a fully integrated sewerage and rainwater drainage network, ensuring the emirate's readiness to face future climate challenges for the next 100 years. 'These efforts are part of two of the region's largest strategic infrastructure programmes: the Dhs30 billion 'Tasreef' project to develop Dubai's rainwater drainage network, and the Dhs80 billion sewerage system upgrade programme. 'Dubai Municipality remains committed to expediting the delivery of integrated development works for sewerage and rainwater collection systems, in line with the highest international standards. 'By applying advanced technologies and smart solutions, we aim to increase operational performance, ensure service continuity, and improve quality of life for Dubai's residents — reinforcing the emirate's status among the world's leading cities for advanced infrastructure.' In other Dubai news Four days on, three days off? Dubai's big work shake-up explained A four-day week is coming into effect next month Dubai Metro Blue Line: Here's where the 14 new stations will be located What to expect when the route arrives It's official: UAE announces Islamic New Year public holiday for all employees Calendars at the ready

Dubai now gets free Wi-Fi service at all bus and marine transport stations
Dubai now gets free Wi-Fi service at all bus and marine transport stations

Time of India

time2 days ago

  • Business
  • Time of India

Dubai now gets free Wi-Fi service at all bus and marine transport stations

Dubai commuters now have free Wi-Fi at all bus and marine stations, as part of RTA's digital upgrade with e&./ Image: DXB Media Office Dubai's Roads and Transport Authority (RTA) has officially completed the rollout of free Wi-Fi service across all 43 bus and marine transport stations in the city, offering passengers seamless internet access while commuting. The announcement was made on Tuesday, June 17, 2025, and is part of a joint initiative with telecom provider e& (formerly Etisalat). The service allows commuters to stay connected through their smartphones, tablets, and laptops, whether they are waiting for a bus or boarding marine transport. The RTA noted that this move is a key step in its broader digital transformation strategy, which supports Dubai's vision to become the world's smartest and happiest city. 'The initiative is part of [our] ongoing efforts to accelerate digital transformation across all our services,' RTA said in a statement. This latest initiative builds on earlier steps taken by the RTA to enhance digital services. In March 2025, the authority launched its 360 Services Policy, designed to reduce the need for in-person visits by shifting toward self-service models. These digital platforms, such as the Dubai Now app, make it easier for users to access transport-related services remotely. The free Wi-Fi coverage now includes: 21 public bus stations 22 marine transport stations This brings the total number of connected locations to 43, covering a wide network across the emirate. The RTA has confirmed that the Wi-Fi service will undergo continuous evaluation and future enhancement, to ensure the network delivers high-quality, reliable connectivity across all public transport modes. The goal, according to the RTA, is to ensure 'quality connectivity for passengers using buses and marine transport across the emirate.' RTA emphasized that the project is aimed at catering to diverse commuter needs, making journeys more convenient and productive. By allowing passengers to stay connected while on the move, the authority hopes to enhance daily commuting experiences and contribute to the city's happiness and digital accessibility targets.

Sheikh Mohammed launches phase 2 of UAE's Zero Bureaucracy Programme
Sheikh Mohammed launches phase 2 of UAE's Zero Bureaucracy Programme

Time Out Dubai

time3 days ago

  • Business
  • Time Out Dubai

Sheikh Mohammed launches phase 2 of UAE's Zero Bureaucracy Programme

The United Arab Emirates has launched the second phase of its Zero Bureaucracy Programme, which aims to fully eliminate digital bureaucracy. Launched by His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, the programme aims to cut the red tape when applying for vital government services. In its first phase, the programme eliminated more than 4,000 unnecessary procedures and saved the public a collective 12 million hours of time. More than 30 national government entities were involved in streamlining government procedures, as delivery times were reduced by more than 70 percent. In the second phase of the plans, the UAE aims to improve the lives of residents by completely cutting waiting times. Mohammed bin Rashid: Today, we launched the second phase of the Zero Bureaucracy Program in the UAE Government — a national initiative to inspire government services that are simpler, faster, and more impactful. In the first phase, we reduced service delivery time by over 70%,… — Dubai Media Office (@DXBMediaOffice) June 16, 2025 Phase Two of the Zero Bureaucracy Programme Phase two will see the modernisation of all government digital systems and the integration of artificial intelligence across the board, which the government says will streamline online processes and applications. The Zero Bureaucracy Programme will also continue to eliminate unnecessary government procedures and services. Plans will further remove redundancies between entities and abolish all non-essential burdens and requirements. The second phase will focus on enhancing government integration, data sharing, developing joint solutions between departments and adopting leading business practices. It aims to introduce a 24-hour uptime for digital systems as the norm and enhance the overall digital customer experience. Launched in November 2023, the UAE Zero Government Bureaucracy programme simplifies and streamlines procedures, eliminating unnecessary requirements. The first phase targeted a reduction of 2,000 government procedures, but doubled this target, and a 50% decrease in processing times. The first phase streamlined 200 million annual transactions, saving customers and businesses 12 million hours and Dhs1.12 billion annually. (Credit: Pexels) Speaking at a launch event held in Dubai for the second phase of the programme, Sheikh Mohammed bin Rashid said the programme is helping achieve the goal of a government without complexity. He said: 'Today we launch the second phase of the Zero Government Bureaucracy programme, a national project designed to create simpler, faster, and more impactful government services. 'In its first phase, the programme reduced service delivery time by over 70 percent, eliminated more than 4,000 unnecessary procedures, and saved customers over 12 million hours. 'We are grateful to the over 30 government entities and 690 teams involved in streamlining government procedures. 'Today, we expand these efforts, focusing on eliminating digital bureaucracy to realise our goal: a government without complexity, services without waiting times, and results that tangibly improve people's lives.' You might also like: Dubai announces 4-day work week and reduced hours Check if you're eligible UAE public holidays: Every long weekend to look forward to in 2025 The dates to know Islamic New Year 2025: UAE announces official public holiday date And when the exact start of Islamic New Year will be confirmed

Dubai welcomes over 629,000 travellers during Eid holiday
Dubai welcomes over 629,000 travellers during Eid holiday

ARN News Center

time11-06-2025

  • ARN News Center

Dubai welcomes over 629,000 travellers during Eid holiday

Dubai recorded a busy Eid Al-Adha holiday, with over 629,000 travellers passing through its entry and exit points between June 5 and 8. Dubai Airports handled the majority, with more than 581,000 passengers, while Hatta Land Border Crossing saw 46,863 travellers. Around 1,100 people also passed through the emirate's maritime ports during the holiday rush. Dubai entry and exit points handle 629,559 travelers during the Eid Al-Adha holiday 5-8 June 2025. — Dubai Media Office (@DXBMediaOffice) June 11, 2025

Dubai welcomes over 629,000 travellers during Eid holiday
Dubai welcomes over 629,000 travellers during Eid holiday

TAG 91.1

time11-06-2025

  • TAG 91.1

Dubai welcomes over 629,000 travellers during Eid holiday

Dubai recorded a busy Eid Al-Adha holiday, with over 629,000 travellers passing through its entry and exit points between June 5 and 8. Dubai Airports handled the majority, with more than 581,000 passengers, while Hatta Land Border Crossing saw 46,863 travellers. Around 1,100 people also passed through the emirate's maritime ports during the holiday rush. Dubai entry and exit points handle 629,559 travelers during the Eid Al-Adha holiday 5-8 June 2025. — Dubai Media Office (@DXBMediaOffice) June 11, 2025

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store