logo
Frankfort receives $1.6 million grant to expand bike and pedestrian trail system

Frankfort receives $1.6 million grant to expand bike and pedestrian trail system

Chicago Tribune29-05-2025

After failing to receive the same grant several years ago, the village of Frankfort received $1.6 million in state funding to expand a trail system for bikers and pedestrians and improve safety, the village announced May 21.
Mayor Keith Ogle said connecting the path that ends at Pfeiffer Road and Sauk Avenue to another path that ends at Laraway Road and 80th Avenue was a priority when he entered office in 2021.
'I think when (the trail) was put in, some of the housing developments that were south of Laraway Road, in that area, were not completed,' Ogle said. 'So now it's been very apparent, and when I became mayor that was one of the first things — like we've got to get this done.'
Ogle said the original trail system was installed more than 20 years ago, and connecting the trails will allow bikers and pedestrian to travel throughout east Frankfort more safely.
'For the residents that live south of Laraway, their only point of access would have been to come up 80th Avenue crossing Laraway,' Ogle said. 'There is a signal there, it's by Chelsea School. But for some of the other ones, this was really a missing link.'
The village applied for the Illinois Transportation Enhancement Program in 2022, but was unsuccessful. Ogle said they applied again last year but budgeted for the $2.2 million project to ensure construction was set for next spring. The 10-feet-wide, 1.5 mile long trail is expected to open to pedestrians and bicyclists next summer, Ogle said.
Ogle said he was thrilled to learn the village received $1.6 million from the department of transportation and will use remaining money budgeted for other infrastructure improvements, including adding a spur to connect some of the subdivisions near Laraway Road and 80th Avenue.
'We're going to have a look at the overall master plan, and then start planning and budgeting for it too,' Ogle said. 'Our bike path goes through the historic downtown. It's beautiful — it's really a scenic path. And we take a lot of pride in how we maintain it. It's a very popular area for visitors to come through, and it connects a lot of other communities in Frankfort.'
Jodi Haefner, 52, who lives on Laraway and 80th, said as a distance runner who drives to the trail five days a week, she will directly benefit from the new connection.
'Going out there and having to do a long run, it definitely would save me the hassle of having to drive my car to the trail,' Haefner said. 'At least I could start at my house, get the extra mileage.'
Haefner said she also believes the trail connection will improve safety for others in the area who opt to bike or run to the trail rather than drive.
'It would make life a lot easier than having to dodge in and out of cars,' Haefner said. 'That road is hilly and when there are bikers or runners on the road, it gets a little dangerous.'

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

St. Charles looking for resident input on sidewalks
St. Charles looking for resident input on sidewalks

Chicago Tribune

time3 days ago

  • Chicago Tribune

St. Charles looking for resident input on sidewalks

The city of St. Charles has developed a survey to gather input from residents to help with sidewalk planning in the city's neighborhoods, officials said. Resident feedback will help the city decide where sidewalks are needed, where they may not be wanted and where improvements are necessary, according to a press release from St. Charles. The survey closes July 11. The comments received will be incorporated with other criteria to help guide the city in future project selection, the release said. The survey is available at The city of Geneva is aiming to enhance electric service reliability by replacing underground utility cable in four areas throughout the community starting in July, city officials said. The 2025-26 underground electric replacement program areas include: South Harrison Street near Spring Street, July 7 to Aug. 18; James Street west of Ninth Street, Aug. 18 to Sept. 8; 2000 block of South Batavia Avenue, Sept. 9 to 26; and James Street from Third to Fifth streets, Sept. 27 to Oct. 29, according to a press release from the city. Construction dates are estimates and may be subject to change due to weather or other unforeseen factors, the release stated. The city's contractor, Utility Dynamics, will be installing conduit through utility easements and public right-of-way during the work. Electrical transformers, pedestals and street lights also will be replaced, according to the release. During the latter part of each project, the contractor will energize and connect homes to the new equipment, officials said. Scheduled power outages will be required as part of this process. The city will be sending notifications in advance of any service disruption, the release stated. The Forest Preserve District of Will County is the recipient of a $1.9 million grant for trail and road improvements through the Illinois Transportation Enhancement Program of the Illinois Department of Transportation. Meant to help expand local travel options and enhance a community's quality of life, the funds will support a trail that will be built in partnership with the city of Aurora and Wheatland Township Road District, according to a news release from state Sen. Linda Holmes, D-Aurora. It will stretch along the north side of Wolfs Crossing Road west from Carls Drive and on the south side east from Carls Drive, the release said. Trail users will be able to head west to Hoffman Boulevard to connect to a system of Aurora trails or east towards the forest preserve district's Normantown Trail or the Naperville Park District's Tallgrass Greenway Trail. The project is in the first phase of engineering, which includes a preliminary design alignment. Musical performers for the Last Fling celebration, scheduled for Aug. 29-Sept. 1 along Jackson Avenue in downtown Naperville, have been announced by the Naperville Jaycees. Sammy & the Knights will kick off the party when they perform at 5 p.m. Friday, Aug. 29, followed by 7th Heaven at 8 p.m. On Saturday, Aug. 30, Buckshot Bully takes the stage at noon, Fearless at 2:30 p.m., 90s Pop Nation at 5:15 p.m. and Too Hype Crew at 8 p.m. Performers on Sunday, Aug. 31, are Within 4 Days at noon, Mixtape Junkies at 2:30 p.m., the Ron Burgundys at 5:15 p.m. and headliner Sixteen Candles at 8 p.m. On the final fest day, Monday, Sept. 1, Rick Lindy and the Wild Ones play at noon and Mike & Joe at 3:45 p.m. In the beer garden, Brent Brown will perform Friday through Sunday and Michael C. Hayes on Monday. Last Fling features live music, food, beverages, a carnival and the Labor Day parade.

University of Denver student arrested for political vandalism on campus: DU
University of Denver student arrested for political vandalism on campus: DU

Yahoo

time03-06-2025

  • Yahoo

University of Denver student arrested for political vandalism on campus: DU

DENVER (KDVR) — A student was arrested for spray painting political messages on campus on Friday night, according to an email from University of Denver Chancellor Jeremy Haefner. The messages were reported to have expressed 'political views, including pro-Palestine and anti-Trump rhetoric' and were found in several locations, but the locations were not named. The messages were allegedly sprayed days before an attack on a pro-Israel group in Boulder by a man who yelled, 'Free Palestine,' and is now being called a terror attack by the Federal Bureau of Investigation. Total injured in Boulder attack increases to 12 'The act of defacing our shared spaces is unacceptable and contrary to our community standards,' Haefner wrote to the DU campus in his email. 'Vandalism is not a form of free expression. It is not protected speech. It is a violation of our shared values and disrespectful to the living and learning environment we share as a community.' Haefner added that DU 'supports the right to express diverse perspectives—but that must happen through lawful means.' According to a probable cause statement obtained by FOX31, the student, identified as 23-year-old Marshall Ray, spray painted 'Free Gaza and 'Free Palestine' on campus property. The statement said that Ray was spray painting a traffic sign when contacted and was painting 'Gaza' at that point. Officers also said a can of spray paint and two paint markers were in his pocket. Ray is being held for investigation of criminal mischief and disturbing the peace. The final determination of charges will be made by the Denver District Attorney's Office. Haefner said that facilities crews were 'working diligently' Monday morning to clean up the graffiti, and said the administration is committed to ensuring campus community members feel safe, respected and heard. The chancellor said that the DU student was arrested by the Denver Police Department. The investigation is ongoing and evidence is being reviewed, Haefner wrote, because there could be others involved. Anyone with information that may assist in the investigation is asked to contact Campus Safety at 303-871-2334. DU said the incident has also been reported to Equal Opportunity and Title IX (EOIX) for review. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Frankfort receives $1.6 million grant to expand bike and pedestrian trail system
Frankfort receives $1.6 million grant to expand bike and pedestrian trail system

Yahoo

time29-05-2025

  • Yahoo

Frankfort receives $1.6 million grant to expand bike and pedestrian trail system

After failing to receive the same grant several years ago, the village of Frankfort received $1.6 million in state funding to expand a trail system for bikers and pedestrians and improve safety, the village announced May 21. Mayor Keith Ogle said connecting the path that ends at Pfeiffer Road and Sauk Avenue to another path that ends at Laraway Road and 80th Avenue was a priority when he entered office in 2021. 'I think when (the trail) was put in, some of the housing developments that were south of Laraway Road, in that area, were not completed,' Ogle said. 'So now it's been very apparent, and when I became mayor that was one of the first things — like we've got to get this done.' Ogle said the original trail system was installed more than 20 years ago, and connecting the trails will allow bikers and pedestrian to travel throughout east Frankfort more safely. 'For the residents that live south of Laraway, their only point of access would have been to come up 80th Avenue crossing Laraway,' Ogle said. 'There is a signal there, it's by Chelsea School. But for some of the other ones, this was really a missing link.' The village applied for the Illinois Transportation Enhancement Program in 2022, but was unsuccessful. Ogle said they applied again last year but budgeted for the $2.2 million project to ensure construction was set for next spring. The 10-feet-wide, 1.5 mile long trail is expected to open to pedestrians and bicyclists next summer, Ogle said. Ogle said he was thrilled to learn the village received $1.6 million from the department of transportation and will use remaining money budgeted for other infrastructure improvements, including adding a spur to connect some of the subdivisions near Laraway Road and 80th Avenue. 'We're going to have a look at the overall master plan, and then start planning and budgeting for it too,' Ogle said. 'Our bike path goes through the historic downtown. It's beautiful — it's really a scenic path. And we take a lot of pride in how we maintain it. It's a very popular area for visitors to come through, and it connects a lot of other communities in Frankfort.' Jodi Haefner, 52, who lives on Laraway and 80th, said as a distance runner who drives to the trail five days a week, she will directly benefit from the new connection. 'Going out there and having to do a long run, it definitely would save me the hassle of having to drive my car to the trail,' Haefner said. 'At least I could start at my house, get the extra mileage.' Haefner said she also believes the trail connection will improve safety for others in the area who opt to bike or run to the trail rather than drive. 'It would make life a lot easier than having to dodge in and out of cars,' Haefner said. 'That road is hilly and when there are bikers or runners on the road, it gets a little dangerous.' ostevens@

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store