logo
Batang Saribas 1 Bridge now open for public use

Batang Saribas 1 Bridge now open for public use

Borneo Post25-05-2025

Uggah and other guests get ready to pop balloons to symbolically declare the bridge open.
KUCHING (May 25): The more than 60 year wait for a bridge to cross the Saribas River in Pusa is finally over with the completion of the Batang Saribas 1 Bridge.
The public can now use the newly-completed 1.55 kilometre-long bridge after its soft opening today by Deputy Premier Datuk Amar Douglas Uggah Embas.
Uggah, who represented Premier Datuk Patinggi Tan Sri Abang Johari Tun Openg, also conveyed the latter's message that the bridge was now open for public use and that ferry service would cease operations.
He added the RM375.5 million bridge includes access roads at both ends, totalling 6.5 kilometres.
'With its completion, we are confident it would boost economic and social activities here, in Beladin and other areas in the Betong Division. W ealso hope it will bring in more development and progress,' said the Minister of Infrastructure and Port Development.
According to Uggah, this bridge is the fifth to be completed out of the 16 bridges being built along the Sarawak Coastal Road.
'Those already completed are the Jepak, Marudi, Muara Lassa and Batang Rajang bridges, and others expected to be completed within this year are the Sungai Lingga, Batang Igan, Batang Lupar 1, Sungai Limbang, Sebauh and Sejingkat bridges.
'Next year, we expect to deliver the Batang Paloh, Krian, Batang Lupar 2 and Batang Saribas 2 bridges,' he said.
He also said it was very exciting to watch these bridges take shape, as they would greatly reduce road travel time statewide.
Uggah cuts a ribbon as a symbolic gesture to declare the bridge open.
'For example, here in Pusa, if we are still depending on the ferry service, we have to wait for at least 30 minutes. Now, that is over.'
He added his ministry and the state Public Works Department (JKR) would continue to ensure all contractors complete their respective bridge projects as scheduled without compromising on the quality.
'This is to honour our promise to the rural folks. When we promise (something), it is incumbent upon us to deliver as scheduled, as the objective is solely to benefit them.
'When we can deliver, it is concrete proof we are not just making sweet promises or paying lip service as are the accusations from the opposition.'
Also present were Deputy Minister of Infrastructure and Port Development Datuk Aidel Lariwoo; Deputy Minister of Women, Childhood and Community Development Datuk Mohd Razi Sitam; Betong MP Datuk Dr Richard Rapu; Batang Lupar MP Mohd Shafizan Kipli; Betong Maro assemblyman Razaili Gapor; Kalaka assemblyman Mohamad Duri; the ministry's permanent secretary Datu Chiew Chee Yau; and JKR Sarawak director Dr Cassidy Morris.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Ahmad Zahid: Sarawak on track for 5 mln tourist arrivals in 2025
Ahmad Zahid: Sarawak on track for 5 mln tourist arrivals in 2025

Borneo Post

time10 hours ago

  • Borneo Post

Ahmad Zahid: Sarawak on track for 5 mln tourist arrivals in 2025

Ahmad Zahid expresses his confidence in Sarawak, stating that the state's current performance has proven this. – File photo SARATOK (June 22): Sarawak is on track to achieve its target of five million tourist arrivals and generate RM12.73 billion in tourism revenue this year, said Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi. Ahmad Zahid expressed his confidence in Sarawak, stating that the state's current performance has proven this. 'In the first four months of this year alone, Sarawak received more than 1.6 million visitors, generating tourism revenue of RM4.07 billion. 'God willing, we are on the right track to achieve the target of five million tourist arrivals and RM12.73 billion in tourism revenue for 2025,' he said when officiating the groundbreaking ceremony for Kampung Kupang-Jalan Bajau junction road project held at Rumah Rengan in Selambong here today. Earlier, Ahmad Zahid, who is the chairman of the Cabinet Committee on Tourism and Culture (JKPK), said Sarawak has a rich culture, a variety of tourism products, and a unique heritage that can be the main driver for the Visit Malaysia Year 2026 (TMM 2026) Campaign. 'We have set a target of 35.6 million international visitors with a potential economic return of RM147.1 billion in conjunction with TMM 2026. 'So, this is where the important role of all of us is to take advantage of our political stability and close relationships to attract more visitors to Sarawak. 'As the JKPK chairman, I do not want Sarawak to be left behind,' he said. Meanwhile, Ahmad Zahid said the 19.9-kilometre road project will create new connectivity for at least 5,000 residents in the surrounding areas, especially Kampung Kupang. The project was approved under the Ministry Rural and Regional Development's (KKDW) Rural Road Programme (JALB) at a cost of RM122.5 million with Sarawak Public Works Department (JKR) as the implementing agency. Work began on Jan 14 this year and it is expected to be fully completed on Sept 14, 2027. The scope of the project is to upgrade the existing road to a paved road in accordance with JKR standards and includes the construction of five bridges. 'After this, it will be more convenient for residents in Rumah Rabiah, Rumah Ganing, Rumah Rengan, Rumah Lakon, Rumah Anau, SK Sungai Entebu, SK Nanga Abu, Rumah Bajau Baru and other areas to commute to Saratok town. 'In addition to a more comfortable and safer route, it will cut short their travel time to Saratok town up to one hour thus helping to stimulate the socio-economic development of Saratok and its surroundings, as well as creating new job opportunities and industries.' Ahmad Zahid urged the selected contractors to adhere strictly to the schedule and specifications. 'Regular monitoring by the Sarawak JKR is also very important to ensure that the progress and quality of the work is always under control. 'This is because the people today do not just want the existence of infrastructure. They want quality infrastructure that is completed on time and provides comprehensive benefits,' he said. In line with these developments, Ahmad Zahid encouraged local residents to participate in entrepreneurial activities. 'Infrastructural developments such as roads not only connect villages to towns, but also open up opportunities for local economic growth. 'Therefore, I would like the community in this area to take advantage of these facilities by venturing into entrepreneurship, whether in the modern agriculture, handicrafts, e-commerce or community tourism sectors. 'Under KKDW, we have many initiatives to assist entrepreneurs such as the Rural Entrepreneurship Strengthening Support Program (SPKLB), Income Enhancement Programme (PPP), Rural Economy Financing Scheme (SPED) including entrepreneurship programs operated by agencies under KKDW such as Mara, Risda, Felcra and others. 'All these initiatives aim to provide access to rural residents to participate in the entrepreneurial ecosystem as one of the main strategies to eradicate extreme poverty and continuously generate new job opportunities in rural areas. 'When there are facilities, there is support and there is enthusiasm, rural entrepreneurship can be a way out of poverty,' he said. ahmad zahid hamidi lead tourism revenye tourist arrivals

Sarawak vows to link rural communities with roads by 2030
Sarawak vows to link rural communities with roads by 2030

The Sun

time4 days ago

  • The Sun

Sarawak vows to link rural communities with roads by 2030

MIRI: The Sarawak government has pledged to connect all, or at least most, rural communities in the state to the road network by 2030, as part of an infrastructure push supported by nine regional development agencies. State Deputy Premier Datuk Amar Douglas Uggah Embas said each agency has been allocated RM1.5 billion, stressing that the funds must be used efficiently and without delay. 'It becomes an issue if these allocations are not spent. Our Premier Tan Sri Abang Johari Tun Openg expects the funds to be used promptly. 'When people are aware of these allocations, they expect action, improved roads, better access and better livelihoods. If not, they'll take to social media to express their frustration,' he said. Speaking at a Highland Development Agency (HDA) planning session here today, Uggah urged government departments to resolve project delays through on-the-ground coordination. HDA, one of the agencies driving the state's rural transformation agenda, has already committed RM1 billion to infrastructure and economic initiatives, with the remaining RM500 million expected to be utilised by mid-2026. He noted that much of Baram, in the Miri Division, still relies on former logging roads, many of which require urgent upgrades, maintenance or replacement of wooden bridges. 'The situation is complex. We must find a long-term solution for road maintenance,' he said, adding that he will lead a Sarawak Public Works Department (JKR) team to Bario in July for an on-site assessment. Beyond connectivity, Uggah highlighted Bario's untapped economic potential in agriculture and tourism, particularly in coffee and passion fruit cultivation, buffalo farming and handicrafts. He also noted the potential for buffalo milk cheese production, referencing a pilot project at the Meragang breeding station in Limbang. 'There's a large population of wild buffaloes owned by locals. I suggest looking into domesticating them,' he said. Uggah also urged local communities and agencies to leverage the region's rich cultural heritage to develop sustainable tourism. Among those in attendance at the session were Baram MP Datuk Anyie Ngau, Mulu assemblyman Datuk Gerawat Gala, Marudi assemblyman Datuk Dr Penguang Manggil, Telang Usan assemblyman Datuk Dennis Ngau and Regional Corridor Development Authority (RECODA) chief executive officer Datuk Ismawi Ismuni.

Sarawak aims for full rural road connectivity by 2030, says Uggah
Sarawak aims for full rural road connectivity by 2030, says Uggah

Borneo Post

time4 days ago

  • Borneo Post

Sarawak aims for full rural road connectivity by 2030, says Uggah

Uggah (centre) in a discussion with Ismawi (right) and others after officiating at the HDA laboratory today. KUCHING (June 18): The Sarawak government under the Gabungan Parti Sarawak (GPS) is committed to ensuring all rural settlements in the state are linked by road access by 2030, said Deputy Premier Datuk Amar Douglas Uggah. In a statement today, Uggah emphasised that this ambitious goal can be achieved through the implementation of key infrastructure projects under the jurisdiction of the state's nine regional development agencies. He stressed the importance of these agencies being able to efficiently utilise their allocations – amounting to RM1.5 billion – for infrastructure and economic development initiatives intended to uplift rural communities. 'It becomes an issue if you (regional development agencies) are not able to do so. Our Premier, Datuk Patinggi Tan Sri Abang Johari Tun Openg, expects the funds to be disbursed and used as soon as possible,' he said. 'People expect these allocations to be used to fulfill their expectations for better communication and better standard of living. 'If not, they will turn to social media to express their frustrations against the government and the elected representatives,' he added. Uggah, who is also State Infrastructure and Port Development Minister, made these remarks during the officiation of a Highland Development Agency (HDA) laboratory today, where proposed projects and programmes under the 13th Malaysia Plan were presented. According to him, the HDA has already channelled RM1 billion of its allocated funds towards various infrastructure and economic development projects. Uggah, also the HDA chairman, expressed hope that the remaining RM500 million would be fully utilised by the middle of next year. Highlighting challenges in the Baram region, Uggah pointed out that the area has numerous roads, especially old logging tracks that are in urgent need of maintenance, upgrades, or replacement bridges. 'The situation (there) is complicated. We must find long-term solutions,' he said, adding that he would lead a team from the Public Works Department (JKR) for a two-day site visit to Bario this July. Touching on the HAD's economic development efforts, Uggah noted that Bario holds strong potentials for agriculture, particularly coffee and passionfruit planting, as well as handicraft production and buffalo rearing. 'I understand there is a large wild buffalo population, though they belong to locals. I suggest the owners consider domesticating them,' he said. He also mentioned the Meragang buffalo breeding station in Limbang, where cheese production from buffalo milk is being explored as part of agro-based industry initiatives. Uggah added that Bario's unique local customs and culture could also be harnessed to develop the tourism sector. Accompanying Uggah were Baram MP Datuk Anyie Ngau, Mulu assemblyman Datuk Gerawat Gala, Marudi assemblyman Datu Dr Penguang Manggil, Telang Usan assemblyman Datuk Dennis Ngau, and the Regional Corridor Development Authority (Recoda) chief executive officer Datu Ismawi Ismuni. douglas uggah Highland Development Agency road access

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store