
BMRCL Orders Additional Trains for Pink Line with New Coaches Ahead of 2026 Launch
In 2023, BMRCL signed an agreement for 318 coaches (53 trains) for the Blue and Pink Lines. Of these, 96 coaches were designated for the Pink Line.
To meet rising demand, BMRCL has now ordered seven additional trains.
New Coach Features:
Driverless technology with Communications-Based Train Control (CBTC).
Stainless steel bodies for durability.
Two air-conditioning systems per coach for better cooling.
Modern interior designs for enhanced comfort.
Advanced Passenger Information Systems (PIS) to keep riders updated.
Platform Screen Door Systems (PSDS) for safety.
LCD route maps and automatic doors for added convenience.
The coaches will be manufactured at BEML's Metro Rail Shed in Bengaluru, boosting local infrastructure.
Cost and Funding:
Each coach costs ₹19.64 crore, lower than the previous ₹29.99 crore deal.
The Japan International Cooperation Agency (JICA) is funding ₹3,177 crore for the project.
These new coaches will ensure the Pink Line has the latest technology and enough trains for smooth operations when it opens in 2026.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Deccan Herald
a day ago
- Deccan Herald
Hopes soar for Namma Metro Pink Line, BEML promises 20 trains by March 2026
BEML chairman and MD Shantanu Roy said a significant capacity increase was planned, starting with the commissioning of Line 3A at the company's plant in Bengaluru. Further expansion will follow with the establishment of BEML's upcoming manufacturing facility in Bhopal.


Deccan Herald
a day ago
- Deccan Herald
Awards for KSRTC, BMRCL
The BMRCL said it had won the 'Most Innovative Financing of Project Capex or Opex for MRTS/RRTS' Award at the national-level infra rail show and awards.

Business Standard
2 days ago
- Business Standard
This PSU stock zooms 100% from March low; hits over 10-month high today
BEML share price today Shares of BEML hit an over 10-month high of ₹4,697, zooming 10 per cent on the BSE in Friday's intra-day trade amid heavy volumes. The stock now quotes at its highest level since July 31, 2024. The stock price of the public sector undertaking (PSU) commercial vehicles company has doubled from its 52-week low of ₹2,346.35 touched on March 3, 2025. At 12:48 AM; BEML share price quoted 9 per cent higher at ₹4,673.75, as compared to 0.92 per cent rise in the BSE Sensex. The average trading volumes at the counter jumped nearly three-fold. A combined 2.5 million shares changed hands on the NSE and BSE. BEML major achievement in 2024-25 BEML registered its highest-ever order book of ₹14,610 crore in FY25. The company posted its highest-ever profit before tax (PBT) of ₹405.43 crore. BEML designed & developed high mobility vehicle HMV12x12 for strategic weapon systems and also designed & developed HMV 6x6 with armored cabin for Mounted Gun System. The 1,500 hp engine program entered the next phase of development with the 1st engine sent to the UK for Mechanical & Combustion development. The company supplied 1st Vande Bharat sleeper trains and completed trials successfully. BEML secured orders for design & development and supply of metro trains for Bangalore Metro & Chennai Metro. It secured orders for design & development and supply of high speed trains from the Indian Railways. BEML acquires land in Madhya Pradesh, Chhattisgarh BEML on May 11, 2025 announced that the Government of Madhya Pradesh approved the allotment of 60.063 hectares (approximately 148 acres) of land to the company. The land has been allotted for setting up a construction facility to manufacture rolling stock / coaches for railway and metro projects in the state. Earlier on May 9, the Chhattisgarh cabinet approved the allotment of 100 acres of land in Janjgir-Champa district to the company at Re 1 per acre for setting up a Heavy Earth Moving Equipment manufacturing plant in the state. ALSO READ | BEML - Healthy outlook The company's management reiterated robust growth prospects, issuing an order book target of ~₹ 22,000-23,000 crore by FY26, led by finalization of large ticket orders with a margin expansion guidance of 150bp YoY supported by operating leverage coupled by richer product mix and better cost optimization measures. The order book mix is expected to be in the ratio of 20:20:60 for mining: defense: rail, respectively, in FY26. Furthermore, BEML expects 20 per cent YoY revenue growth in FY26, led by seamless execution of Bengaluru Metro and Vande Bharat with nine train sets left to be delivered with a prototype of maiden train set being cleared in April. With a robust outlook and a promising order pipeline for FY26, analysts reiterate a positive stance on the stock. Elara Capital on BEML BEML's FY25 order inflow stood at ₹6,800 crore, up 28 per cent YoY, which is expected to double by FY26, supported by finalization of metro orders comprising Chennai, Mumbai, Thane, Pune, & Nashik and setting up of metros in Andhra Pradesh, Chhattisgarh, Madhya Pradesh, as well as expansion of metro lines for Kochi and Hyderabad with rail maintenance vehicles. Additionally, BEML also expects Regional Rapid Transit orders and two high-speed train tenders to fructify in December 2026 for the Mumbai-Ahmedabad corridor. With a robust outlook and a promising order pipeline along with solid guidance on order book & inflow coupled by bold capex plans, we remain positive, the brokerage firm said. However, currently, the stock trades above analysts target price of ₹4,860 per share.