logo
RM1.11bil allocated for rural development in Sabah this year, says Zahid

RM1.11bil allocated for rural development in Sabah this year, says Zahid

The Star17-05-2025

PUTATAN: The Rural and Regional Development Ministry has allocated RM1.11bil for rural development in Sabah in 2025, says Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi.
Ahmad Zahid, who is also Rural and Regional Development Minister, said the allocation covered social infrastructure projects, including the construction of rural roads, provision of electricity, and water supply systems, aimed at improving access, quality of life and sustainability for the rural population.
He said there was still a significant gap to be addressed, particularly in terms of basic infrastructure, economic access, education and rural digitalisation.
The ministry, he said, remains committed to implementing comprehensive high-impact programmes, including in Sabah, to close this gap.
"There are no major electricity issues in urban areas, so rural areas must also have a good electricity supply, like in urban areas. Similarly, rural infrastructure such as roads needs to be upgraded and improved," he said while officiating the closing ceremony of the "Sentuhan Kasih Desa Madani Bersama Pimpinan" event here on Saturday (May 17) night.
Also present were Sabah Community Development Department (Kemas) chairman Datuk Seri Bung Moktar Radin, who is also Kinabatangan MP, and Kemas director-general Datuk Mohd Hanafiah Man. – Bernama

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Anwar urges Malaysians to embrace diversity as strength in face of global uncertainties at Sarawak's Gawai Dayak celebration
Anwar urges Malaysians to embrace diversity as strength in face of global uncertainties at Sarawak's Gawai Dayak celebration

Malay Mail

time5 hours ago

  • Malay Mail

Anwar urges Malaysians to embrace diversity as strength in face of global uncertainties at Sarawak's Gawai Dayak celebration

KUCHING, June 23 — Racial diversity should be embraced as a strength to enhance national unity, rather than as a battleground for rivalry or a means to showcase superiority and ego, Prime Minister Datuk Seri Anwar Ibrahim said. He said that in many other countries, such diversity has led to racial and religious hostility, eventually burdening the nation and negatively affecting the people. 'Unity within our multiracial society is increasingly essential to ensure that Malaysia remains strong amid the current uncertain global geopolitical landscape. 'Never underestimate the potential problems if you are disunited. The geopolitical conditions are so challenging and alarming. The future is never certain. But what we can ensure is a united Malaysia,' he said. Anwar was speaking at the 2025 Sarawak-level Gawai Dayak celebration dinner at the Borneo Convention Centre Kuching (BCCK) here tonight, which was also attended by Deputy Prime Minister Datuk Seri Dr Ahmad Zahid Hamidi and Sarawak Premier Tan Sri Abang Johari Tun Openg. Yang di-Pertua Negeri of Sarawak Tun Dr Wan Junaidi Tuanku Jaafar and his wife Toh Puan Fauziah Mohd Sanusi were the guests of honour at the event. Anwar said as prime minister, he feels proud in showcasing the country's cultural and racial diversity, especially as Malaysia assumes the Asean chairmanship this year and when receiving foreign dignitaries and corporate leaders. He said this was exemplified during a recent meeting with ConocoPhillips Chairman and Chief Executive Officer Ryan Lance, where he wore a traditional Iban outfit gifted to him earlier by Works Minister Datuk Seri Alexander Nanta Linggi. 'So I told him (Ryan) about Sarawak, about the beauty of the culture, that's what we have to do. And I take great pride as a Malaysian to speak to one of the great multi-billion dollar companies, probably one of the biggest oil companies in the world and number one in the United States,' he said. Meanwhile, Anwar also announced that he will meet with Indonesian President Prabowo Subianto this Friday to discuss a proposal for Sarawak to be positioned as a hub for the Asean Power Grid (APG). He said Sarawak, with its strengths in hydroelectric, gas and hydrogen energy, has the potential to spearhead the APG, not only by linking to Sabah and Indonesia's Kalimantan, but also extending to the southern Philippines. — Bernama

KKDW sets up committee to oversee Sarawak rural projects
KKDW sets up committee to oversee Sarawak rural projects

The Sun

time21 hours ago

  • The Sun

KKDW sets up committee to oversee Sarawak rural projects

BETONG: The Ministry of Rural and Regional Development (KKDW) has established a Project Monitoring and Coordination Committee chaired by Deputy Minister of Rural and Regional Development Datuk Rubiah Wang to ensure the smooth implementation of rural development projects in Sarawak. Deputy Prime Minister and Minister of Rural and Regional Development Datuk Seri Dr Ahmad Zahid Hamidi said the committee was established after his ministry found that there were delays and technical issues affecting the implementation of several projects, including problems related to land status. 'The establishment of this committee was the result of the decision of the KKDW meeting itself when we found that several projects were facing implementation problems, especially in terms of ownership or land status that had not been resolved,' he said. He told the media after officiating the groundbreaking ceremony for the construction of the road from Kampung Kupang to Simpang Jalan Bajau in Rumah Rengan, Saratok today. He said coordination between federal and state agencies was very important to speed up the implementation of the projects, especially those involving allocations of less than RM50 million. 'As decided by Prime Minister Datuk Seri Anwar Ibrahim, projects worth less than RM50 million will be handed over to the state government for implementation. 'This requires close coordination and we at KKDW will continue to provide full support to the state government in its implementation,' he explained. Ahmad Zahid also stated that under the committee, the scope of work for projects being implemented in Sarawak which currently cannot be changed due to several constraints will be done under the 13th Malaysia Plan. 'Currently, this is under the responsibility of the state government and although we have several constraints to change the scope, it is not impossible in the 13th Malaysia Plan if we can discuss in detail the joint implementation between the state government and the federal government,' he explained. Reviewing the infrastructure development in Sarawak, he praised the state government's initiative in building coastal roads which not only connect the route to the Pan Borneo Highway but also play an important role in connecting longhouses and traditional villages. One of the areas of responsibility for this coordination committee is to build a road connecting longhouses and traditional villages so that we do not face what is called denial syndrome by various parties, but it is better for the benefit of the people to do this coordination,' he added. 'This is also part of the KKDW's responsibility for and this is the main role of this coordination committee, which is to prevent the existence of 'denial syndrome' among stakeholders,' he said. He added that effective coordination will ensure that the planned development truly benefits the people, especially in the interior areas. Meanwhile, the construction of the road involves upgrading the existing main road connecting Kampung Kupang and Simpang Jalan Bajau, from a gravel road to a paved road according to the JKRR2 Standard, with an estimated length of 16.9 kilometres. It also involves upgrading the existing connecting road to the JKRR1 standard leading to the school and longhouse, namely: Jalan Cabang 1 to SK Sungai Entebu, 86 metres long, Jalan Cabang 2 to Rumah Anau, 86 metres long 100 metres, Jalan Cabang 3 to Rumah Lakon, 1,175 metres long, Jalan Cabang 4 to Rumah Rabiah, 1,646 metres long, construction of five reinforced concrete bridges, drainage systems, culverts, road pavement and shoulder as well as installation of road signs and road fixtures. The project, which began in January at a cost of RM112.9 million, is expected to be completed in Sept, 2027.

Govt sets up committee to fast-track rural development projects in Sarawak
Govt sets up committee to fast-track rural development projects in Sarawak

New Straits Times

time21 hours ago

  • New Straits Times

Govt sets up committee to fast-track rural development projects in Sarawak

BETONG: The Rural and Regional Development Ministry has set up a Project Monitoring and Coordination Committee, chaired by its Deputy Minister Datuk Rubiah Wang, to ensure smoother implementation of rural development projects in Sarawak. Deputy Prime Minister and Rural and Regional Development Minister Datuk Seri Dr Ahmad Zahid Hamidi said the committee was formed after the ministry identified delays and technical issues affecting several projects, including problems related to land status. "The establishment of this committee was the result of a ministry-level decision, following the discovery that several projects were facing implementation challenges, particularly involving unresolved land ownership or status issues," he said. He was speaking to the media after officiating the groundbreaking ceremony for the construction of a road from Kampung Kupang to Simpang Jalan Bajau in Rumah Rengan, Saratok, today. He said coordination between federal and state agencies was crucial to expedite the implementation of projects, especially those involving allocations of less than RM50 million. "As decided by Prime Minister Datuk Seri Anwar Ibrahim, projects worth less than RM50 million will be handed over to the state government for implementation. "This requires close coordination and we at the ministry will continue to provide full support to the state government in its implementation," he said. Under the committee, Zahid said the scope of work for projects being implemented in Sarawak which currently cannot be changed due to several constraints will be done under the 13th Malaysia Plan (13MP). "Currently, this is under the responsibility of the state government and although we have several constraints to change the scope, it is not impossible in the 13MP if we can discuss in detail the joint implementation between the state government and the federal government," he said. Reviewing the infrastructure development in Sarawak, he praised the state government's initiative in building coastal roads which not only connect the route to the Pan Borneo Highway but also play an important role in connecting longhouses and traditional villages. One of the areas of responsibility for this coordination committee is to build a road connecting longhouses and traditional villages so that we do not face what is called denial syndrome by various parties, but it is better for the benefit of the people to do this coordination," he added. "This is also part of the ministry's responsibility and this is the main role of this coordination committee, which is to prevent the existence of 'denial syndrome' among stakeholders," he said. He added that effective coordination will ensure that the planned development truly benefits the people, especially in the interior areas. Meanwhile, the construction of the road involves upgrading the existing main road connecting Kampung Kupang and Simpang Jalan Bajau, from a gravel road to a paved road according to the JKRR2 Standard, with an estimated length of 16.9 kilometres. It also involves upgrading the existing connecting road to the JKRR1 standard leading to the school and longhouse, namely: Jalan Cabang 1 to SK Sungai Entebu, 86 metres long, Jalan Cabang 2 to Rumah Anau, 86 metres long 100 metres, Jalan Cabang 3 to Rumah Lakon, 1,175 metres long, Jalan Cabang 4 to Rumah Rabiah, 1,646 metres long, construction of five reinforced concrete bridges, drainage systems, culverts, road pavement and shoulder as well as installation of road signs and road fixtures. The project, which began in January for RM112.9 million, is expected to be completed in September 2027.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store