
Grizzly bear on Texada Island has history of ‘aggressive behaviour and property damage': BCCOS
In this file photo, a grizzly bear is seen fishing for salmon along the Atnarko river in Tweedsmuir Provincial Park near Bella Coola, B.C. Saturday, Sept 11, 2010. (THE CANADIAN PRESS/Jonathan Hayward)
Conservation officers have provided more information about a grizzly bear that swam to a Gulf Island last month – saying its history includes breaking into boats and stalking people.
The bear was first spotted on Texada Island on May 27, prompting a warning to residents from the qathet Regional District about the danger of bears becoming habituated to humans.
The B.C. Conservation Officer Service provided an update on the grizzly Friday, outlining past incidents and previous attempts at relocation.
In September of 2024, the bear was relocated from Gibsons after it was spotted 'roaming around' a local school and downtown streets. It was moved to a 'remote coastal habitat' on Jervis Inlet, according to the BCCOS.
Twelve days later, the bear had returned to the more populous urban area of the Sunshine Coast and was spotted in Sechelt. Once again, it was relocated to the 'far end' of Jervis Inlet, the service said.
In May of this year the bear spent time in Powell River where several concerning incidents were reported, including the bear breaking into boats at the marina in search of bait.
'The bear displayed aggressive behavior by stalking two residents while walking on a trail,' the BCCOS said, describing another troubling encounter.
'The people escaped by entering and remaining in the water for half an hour while the bear remained on shore circling back and forth. The grizzly bear tore up one of their jackets on shore before leaving.'
Since arriving on Texada Island in late May, the bear has 'stalked a resident walking home with her horse and dog for half a kilometer' and was spotted 'chasing livestock.'
Conservation officers are not actively trying to trap the bear but they are poised to respond to reports of additional encounters.
'Due to the high level of conflict history that has impacted public safety - including complaints of public encounters, aggressive behaviour and property damage – this bear is not a candidate for relocation,' the update form the service said.
'Bears that no longer fear people are not candidates for relocation or rehabilitation, due to the risk to public safety. These are difficult decisions, but people's safety is always the top priority. Conservation officers will relocate bears if circumstances allow. In this case, it would not be in the interest of public safety to relocate the bear a third time.'
According to publicly available statistics, calls to the BCCOS about grizzlies are rare. The service received 31 calls between 2011 and 2024 and four grizzly bears have been killed in that time period– none by conservation officers.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CTV News
5 hours ago
- CTV News
A Michigan bear roamed the woods for two years with an awful lid on his neck. Not anymore.
DNS staffers work to remove a lid from the neck of an immobilized black bear near Hillman, Michigan, on June 3, 2025. (Michigan Department of Natural Resources via AP) Michigan wildlife experts finally were able to trap a black bear and remove a large lid that was stuck around his neck — for two years. 'It's pretty incredible that the bear survived and was able to feed itself,' state bear specialist Cody Norton said Wednesday. 'The neck was scarred and missing hair, but the bear was in much better condition than we expected it to be.' The bear first turned up on a trail camera as a cub in 2023 in the northern Lower Peninsula. After that, the Department of Natural Resources was on the lookout for the elusive animal with a hard plastic lid around the neck, Norton said. The bear appeared again on a camera in late May, still wearing the barrel lid, and the DNR responded by setting a cylindrical trap and safely luring him inside. The bear was immobilized with an injection and the lid was cut off in minutes on June 3. The bear eventually woke up and rambled away. Angela Kujawa, a wildlife biologist who was at the scene, said she wondered about the bear's ability to climb trees with the uncomfortable accessory. 'And he probably laid more on his back or side when he was resting,' she said. Norton said it's not precisely known how the lid got stuck on the bear's neck. Bear baiting is legal in Michigan, but the hole on a barrel lid typically must be large enough to avoid what happened to this bear. The bear weighed 110 pounds (49.9 kilograms), which is fairly typical for a 2-year-old. 'We were pleasantly surprised. It was still able to make a living like a pretty typical bear,' Norton said. Ed White, The Associated Press


CBC
2 days ago
- CBC
2 years behind schedule, the Pattullo Bridge replacement nears completion
Social Sharing An 80-metre gap is all that separates the main bridge deck from the north ramp of B.C.'s Pattullo Bridge replacement. High above the Fraser River, construction crews work to connect the two sides, one rebar at a time. The space may look vast, but engineer Wendy Itagawa says it's a relatively small section of the bridge's 1,200-metre length. "We're getting really close now," said Itagawa, who is the executive director of the Pattullo Bridge Replacement Project. "We're installing the cables and the deck, and we'll be connecting to the north side later this summer." The project broke ground in 2020 and has faced years of delays, but Itagawa says it's on track now for its fall 2025 opening. About 450 people regularly work on the $1.673-billion infrastructure project, which will replace the aging Pattullo Bridge that connects New Westminster and Surrey. Aging Pattullo and delays Built in the 1930s, the Pattullo Bridge serves about 60,000 drivers daily. But over the past two decades, concerns over the bridge's safety and integrity have mounted. In 2016, a report presented to TransLink's board of directors showed the bridge did not meet modern wind and seismic safety standards. The report to Metro Vancouver's transit authority recommended the bridge be replaced by no later than 2024. The province greenlit a new bridge in 2018. Two years later, in 2020, a team of contractors collectively known as the Fraser Crossing Partners was awarded a $967.5-million contract to replace the bridge. Construction began that February. WATCH | 5 years in the making, Pattullo Bridge replacement nears completion: New Pattullo Bridge connecting Surrey, New Westminster nears completion 1 day ago Duration 2:55 After a lengthy construction period, the new Pattullo Bridge, connecting Surrey and New Westminster, is almost finished. This new crossing will replace the existing bridge, located just a few hundred metres away. CBC's Jon Hernandez ascended high onto the bridge deck to observe the ongoing construction. About a year into construction, the opening of the bridge was delayed from 2023 to 2024. At the time, the government attributed delays to on-site investigative work and permitting holdups due to the COVID-19 pandemic. Last year, it was delayed until fall 2025, with officials citing inflationary pressures and global supply issues. The province also said the 167-metre bridge tower, the tallest of it's kind in B.C., took longer to build than expected. New bridge, new name The current Pattullo Bridge has four lanes of traffic. Opposing directions of traffic are divided by plastic stakes and pedestrians and cyclists share a single sidewalk crossing the bridge. Over the years, Surrey and New Westminster have been at odds over how many lanes the replacement should have, with Surrey advocating for a six-lane bridge, but New Westminster wanting to maintain four. The province says the replacement bridge will have four lanes, a decision made following community consultation and based on current road network capacity limits. However, the bridge is wide enough to be expanded into six lanes in the future. There will be dedicated walking and bike paths on both sides of the bridge, along with a centre median. And it won't share its predecessor's namesake. Itagawa says as part of the project's cultural recognition program, the bridge's new name will reflect the Fraser River's significance to local First Nations, including the Musqueam and Kwantlen nations. Indigenous artwork The project will also feature artwork from Kwantlen First Nation artist Phyllis Atkins, whose design featuring sturgeon and eulachon will be engraved on the Highway 17 overpass at Old Yale Road. The design includes replicas of sturgeon scutes, the bone plates the fish have on their backs. Atkins says she was inspired by her time studying the fish along the Fraser River. "It was life changing being right on the river in our unceded traditional territory of Kwantlen. We had sites right up and down the Fraser," said Atkins. "I got to see first-hand the perspective of the river our people used to travel and fish for thousands of years. I really felt that connection."


CTV News
2 days ago
- CTV News
Snapping turtle lays eggs in busy Dartmouth park, prompting conservation efforts
A female snapping turtle has decided to nest in a grassy field at Dartmouth's Shubie Park. A snapping turtle has once again chosen a well-trodden part of Shubie Park in Dartmouth, N.S., to dig her nest – prompting staff and conservation officials to step in and protect the eggs. The turtle was spotted earlier this week digging multiple holes in search of the perfect nesting spot. She eventually laid her eggs and made her way back to a nearby holding pond. 'There was a snapping turtle here on Wednesday,' said Jon Burns, tour guide at the Shubenacadie Canal Commission. 'It dug various different holes, buried the eggs in one, and then made its way over to the pond.' It's not the first time the reptile has chosen the park. Burns said the same turtle nested in the area for the past two years. 'She's kind of become our little mascot,' said Burns. Snapping turtles are considered a species of special concern in Nova Scotia. While not endangered, they are protected, and staff initially attempted to cordon off the nest area before realizing that a permit is required for any such barrier. Officials from a local conservation organization have been contacted and are expected to put a perimeter in place to protect the nest and keep foot traffic at a distance. 'Usually they try to stay away from highly trafficked areas,' said Burns. 'So it's not super common for a turtle to nest here but this one seems to have something it likes.' The turtle laid her eggs in late spring and staff said hatchlings aren't expected until the fall – sometime between 65 and 95 days from the time of nesting. Visitors are encouraged to watch where they step and be mindful of signs of turtle activity, including disturbed soil and filled-in holes. 'There could be more nests in the area,' said Burns. 'They prefer shallow water with soft, muddy bottoms and this park has a lot of that.' The Shubenacadie Canal Commission, which manages the area, said it hopes the site will remain undisturbed until the eggs hatch. For more Nova Scotia news, visit our dedicated provincial page