
PM GatiShakti Plan: Key Infrastructure Projects Reviewed by Network Planning Group, ET Infra
Advt
Metro rail extension to Ahmedabad airport
Road corridors and logistics park development
NH-248S access road to Vadhavan Port
Elevated corridor in Jodhpur
Advt
Multi-Modal Logistics Park in Hyderabad
Multi-Modal Logistics Park in Patna
By ,
ETInfra
The 95th meeting of the Network Planning Group (NPG) was held on Thursday to assess five infrastructure proposals related to metro rail, roads, transport and highways, and logistics parks. The review was conducted in line with the objectives of the PM GatiShakti National Master Plan (PMGS NMP), with a focus on multimodal connectivity, intermodal coordination, and last-mile linkages to economic and social nodes.The projects reviewed included one Metro Rail project, two road projects, and two Multi-Modal Logistics Parks (MMLPs). The proposals were evaluated for their alignment with the principles of integrated infrastructure planning and expected impact on travel time, logistics performance, and regional development.The Ministry of Housing and Urban Affairs (MoHUA) presented plans for a 6.032-km extension of the Ahmedabad Metro Rail to connect Koteshwar Metro Station to Sardar Vallabhbhai Patel International Airport. The extension is expected to support intra-city transit and improve airport connectivity for commuters and workers.The planning process involved inputs from multiple stakeholders, including the airport authority, municipal bodies, urban development departments, and transport agencies. The project also aims to strengthen linkages between Ahmedabad and Gandhinagar.The Ministry of Road Transport and Highways (MoRTH) presented four proposalsA plan to build an 8-lane access-controlled highway along NH-248S to connect with the proposed Vadhavan Port in Maharashtra was reviewed. The road is intended to support cargo evacuation for the port, which is being developed to handle up to 23.2 million TEUs in later phases. Key rail and road connections include the Mumbai–Delhi Western Railway Line, the Delhi–Mumbai Expressway, and NH-48.A proposal to construct a 4-lane elevated road (7.633 km) in Jodhpur, running from Mahamandir to Akhaliya Chouraha, was presented. The route aligns with NH-62 and NH-125 and is designed to bypass 28 traffic junctions. Travel time through the corridor is expected to reduce by up to 20 minutes during peak hours.A logistics park covering 315 acres is planned at Parkibanda village in Telangana's Medak district. The facility is projected to handle 1.47 million metric tonnes (MMT) of cargo annually starting 2028, scaling up to 19.98 MMT by 2070. It will provide services including cargo aggregation, modal shift, and customs clearance, and is located near several industrial clusters and railway stations.Another logistics park is proposed at Jaitiya village in Patna district, Bihar. The site spans over 106 acres and is projected to manage 5.43 MMT of cargo annually by 2071. It is positioned near rail and road corridors and is intended to serve industrial areas and regional freight movement. The site's proximity to Patna Airport, ISBT, and major highways supports integration with domestic and international trade routes.The meeting was chaired by Shri Pankaj Kumar, Joint Secretary, Department for Promotion of Industry and Internal Trade (DPIIT).
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
Strait of Hormuz closure on the cards: Why India isn't hitting the panic button over oil yet, ET Infra
Advt Why the Strait of Hormuz matters India's exposure—and its evolving strategy In June 2025, Indian refiners imported 2.2 million barrels per day (bpd) of Russian crude—the highest in two years and more than combined imports from the Gulf. Imports from the United States rose to 439,000 bpd, up from 280,000 bpd in May. LNG imports from Australia, Russia, and the US are also on the rise—all bypassing Hormuz entirely. Advt Has Iran ever closed the Strait? Why a full blockade Is unlikely Iran's own oil exports rely on the Strait—primarily via Kharg Island, which handles 96 per cent of its volumes. Its largest buyer, China, imports 5.4 million bpd through Hormuz and is unlikely to support such a move. Saudi Arabia, UAE, Kuwait, and Qatar—countries Iran has been trying to mend ties with—would also be severely impacted. The US Navy and allied forces maintain a heavy presence in the region, further reducing the chances of a prolonged closure. Can India manage a disruption? Strategic petroleum reserves covering 9–10 days of imports. Increased sourcing from Russia, the US, Latin America, and West Africa. Flexible refining infrastructure and wider crude handling capacity. Possible use of fuel subsidies to contain inflationary pressure on diesel and LPG.e By , ETInfra Standing at the lectern in the White House briefing room, Karoline Leavitt, President Donald Trump's press secretary, read aloud a message she said came 'directly from the president.'Citing a 'substantial chance of negotiations' with Iran, the statement said Trump would wait two weeks before deciding whether to launch air strikes in the Middle East. Less than 30 hours later, Trump gave the go-ahead for a sweeping aerial assault on Iran's nuclear facilities—joining Israel in the most significant Western military action against Iran since its 1979 global tensions mount, analysts are closely watching how Tehran might respond. One possibility is the closure of the Strait of Hormuz—a strategic maritime corridor through which more than 20 million barrels of oil and a significant volume of liquefied natural gas (LNG) pass Strait of Hormuz, just 33 km wide at its narrowest point, connects the Persian Gulf to the Arabian Sea and Indian Ocean. With only two-mile-wide shipping lanes in each direction, it is a chokepoint for tankers moving oil and gas from the Gulf to the to the US Energy Information Administration (EIA), an average of 20.3 million barrels of oil and 290 million cubic meters of LNG transited the Strait daily in 2024. Most of it comes from Saudi Arabia, Iraq, UAE, Kuwait, Iran, and disruptions were once a bigger concern for the West, today it's Asia that stands most exposed. More than 80 per cent of the oil passing through the Strait is destined for Asia. India, China, Japan, and South Korea accounted for 67 per cent of these flows in 2022 and early imports 90 per cent of its crude oil, with about 40 per cent sourced from Gulf countries like Iraq, Saudi Arabia, UAE, and Kuwait—all dependent on Hormuz. But India's risk profile is changing oil (Urals, ESPO, Sokol) reaches India via the Cape of Good Hope, the Suez Canal, or the Pacific, giving New Delhi important logistical flexibility. Indian refiners, for their part, have invested in processing flexibility to handle a wider variety of yet. Tehran has made multiple threats over the years—most notably in 2012, 2018, and 2019—but has never followed through. Even during the Tanker War of the 1980s, when Iran and Iraq attacked Gulf shipping, the Strait remained most recent flashpoint came in April 2024, when Iranian forces seized a container ship near Hormuz following Israeli strikes on an Iranian consulate in some Iranian leaders have once again raised the prospect of closure, most analysts remain Secretary of State Marco Rubio publicly urged China to dissuade Iran from escalating.'I encourage the Chinese government in Beijing to call them [Iran] about that,' Rubio told Fox News. 'If they [close the Strait]... it will be economic suicide for them.'China is Iran's largest oil customer, importing 1.8 million bpd in May, according to Vortexa. Any closure would also hit India, Japan, and South Korea, which rely on the same the Strait would be economically and diplomatically self-defeating for far, the government appears confident. Oil Minister Hardeep Singh Puri said that India has adequate reserves and access to alternate sources. Over the years, the government has also worked on diversification of its sources of crude oil, significantly reducing the dependence on Strait of present, India enjoys a certain degree of cusion. Key buffers include:State-owned retailers like IOC, BPCL, and HPCL also have built-up margins after holding retail prices steady during periods of low global crude Strait of Hormuz remains a geopolitical flashpoint , but India's energy security posture has changed. With a more diversified crude basket, greater sourcing resilience, and improved infrastructure, a short-term disruption would be manageable—though not if the conflict deepens or becomes protracted, oil prices could spike, and shipping patterns may shift rapidly—testing how robust India's backup plans really are.


Hans India
2 days ago
- Hans India
Metro Rail Phase 2 proposal submitted to Centre
Hyderabad: Taking a step further towards executing the Metro Rail project in the city, HMRL submitted the Metro Rail Phase 2 (B) proposal along with required documents and DPRs the Central government on the HMR officials, the proposal was duly approved by the State cabinet, this phase 2 (B) project consists of three corridors -- RGIA to Bharat Future City (39.6 km; Rs 7,168 crore), JBS to Medchal (24.5 km; Rs 6,946 cr), and JBS to Shamirpet (22km; Rs 5,465 crore). Thus covering a total length of 86.1km, this Phase 2 (B) project will involve a total investment of Rs 19,579 crore. Like the earlier submitted Phase 2 (A) project of five corridors (76.4 km), this Phase 2 (B) project is also proposed to be developed as a joint venture project of GoI and GoTG. As per the JV project norms of the Central government, the Phase 2 (B) cost of Rs 19,579 cr will have Telangana government's share of Rs 5,874 cr (30 per cent), Central government's share of Rs 3,524 cr (18 per cent); debt from international financial institutions of Rs 9,398 cr (48%) and a small PPP component of Rs 783 cr (4 per cent).


The Hindu
2 days ago
- The Hindu
Proposals for Metro Rail Phase 2 submitted to Centre
Hyderabad The proposals for Metro Rail Phase 2 (B), along with all the required documents and Detailed Project Reports (DPRs), were submitted to the Union Government on Saturday. Chief Minister A. Revanth Reddy, during his recent visit to New Delhi, urged the Centre to sanction permissions for the project at the earliest. The Phase 2 (B) project consists of three corridors — Rajiv Gandhi International Airport to Bharat Future City (39.6 km) with an estimated cost of ₹7,168 crore; Jubilee Bus Station (JBS) to Medchal (24.5 km) to be constructed at an estimted cost of ₹6,946 crore and JBS to Shamirpet (22 km) to be constructed at ₹5,465 crore. It covers a total length of 86.1 km involving an investment of ₹19,579 crore. As per the JV project norms of the Central government, Phase 2 (B) cost of ₹19,579 crore will have GoTG's share of ₹5,874 crore (30%), GoI's share of ₹3,524 crore (18%); debt from international financial institutions of ₹9,398 crore (48%) and a small PPP component of ₹783 crore (4%).