&w=3840&q=100)
REC to provide Rs 2.5 trn finance for renewable energy projects till 2030
State-owned non-banking finance firm REC Ltd will increase its exposure to renewable energy projects by about Rs 2.5 trillion in next six years to aid India's target of having 500 GW of non-fossil fuel energy by 2030.
REC currently has an exposure of about Rs 53,000 crore in renewable energy projects with a total loan book of Rs 5.67 trillion as on March 31, 2025.
The company has planned to achieve a loan book of Rs 10 trillion including Rs 3 trillion exposure in renewable energy project by 2030.
Renewable energy is a key area where the company will focus in the coming six years in view of nation's ambitious target of having 500 GW renewable energy by 2030.
Talking to PTI, REC Chairman and Managing Director Jitendra Srivastava said, "Currently, our loan book stands at around 5.67 trillion. and we are trying to aim for a loan book of 10 trillion by 2030. Out of this, we would like to see the renewable sector touching around 3 trillion, which is currently around Rs 52,000 crore to Rs 53,000 crore. So we are hopeful. We would like to push the sector." He said the company will be fairly aggressive in the renewable energy sector.
India's installed renewable energy capacity is about 220 GW as of March 31, 2025, which includes around 48 GW large hydro power project, over 50 GW wind energy and about 106 GW solar projects.
India needs to add 50 GW of renewable energy capacity per annum till 2030 to achieve the target of 500 GW.
Thus the nation needs a lot of investment and finance facility to achieving this tall order.
The government has appointed REC as the nodal agency for implementing roof-top solar scheme 'PM Surya Ghar Yojana'.
About the progress on the scheme, Srivastava said, "We have a target of 1 crore households for PM Surya Ghar Yojana, out of which 51 lakh applications have come in. Out of this, 1.2 million people have already received it and we are trying to complete our target of 1 crore households in next two years." About reducing the net credit impaired assets or bad loans, he stated that the company is targeting zero bad loans this fiscal, which has already been brought down to 0.38 per cent from 0.86 per cent a year ago.
He also informed that there are 12 cases of bad loans and the company is working on them.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Indian Express
35 minutes ago
- New Indian Express
Pineapple price hike turns bitter for Kerala's Vazhakulam farmers
KOCHI: Despite prices hitting a record high, the pineapple farmers of Vazhakulam are depressed as there has been a steep decline in production. The arrival of rain did not hamper the demand in the north Indian market, but the pineapple market in Vazhakulam is unable to provide even half the required quantity of fruits. The slump in production has led to a spike in prices and it hit a record high of Rs 62 per kg last week. On Thursday, the price stood at Rs 55 per kg. 'Normally, the Vazhakulam market sends around 1,500 tonnes to 2,000 tonnes of pineapple to various states a day. However, now, the daily business has declined to 700 tonnes a day. As the summer was harsh last year, the farmers had taken precautions to delay the flowering of plants to avoid total loss. The fruit normally ripens around 120 days after flowering. The production is expected to return to normal in another 30 days. Though there will be a decline in demand after the onset of monsoon, the demand will rise again by August,' said All Kerala Pineapple Farmers Association president James George. Meanwhile, the Agricultural and Processed Food Products Export Development Authority (APEDA) has initiated steps to help the farmers export pineapple by sea. As the air freight charge is unaffordable, the farmers are facing difficulty in finding new markets. Though there is demand for the sweet and juicy Vazhakulam pineapple in West Asia and Europe, the high freight charge is posing a challenge. The pineapple research station in Vazhakulam has developed a sea shipment protocol and the field trials are expected to start soon. However, Manna Pineapples, a private firm in Vazhakulam, has shipped six consignments of pineapple to Dubai this year. The consignments of 16 tonnes each are sent in reefer containers, maintaining ambient temperature.


New Indian Express
35 minutes ago
- New Indian Express
Plan for toll booths on Western Ring Road in Coimbatore sparks public outrage
COIMBATORE: The Tamil Nadu State Highways Department's and Tamil Nadu State Highways Authority's (TANSHA) plan to set up toll booths along the under-construction Western Ring Road in Coimbatore has stirred public anger, with industrialists, social activists, and residents condemning the move. The 32.43-kilomere-long Western Ring Road, designed to ease city traffic by diverting heavy vehicle flow around Coimbatore, is being implemented in three phases. Phase 1 of the project, stretching 11.80 km from Mykal to Madampatti and passing through areas like Madukkarai, Sundakkamuthur, Perur Chettipalayam, and Theethipalayam, is nearing completion. Work on this stretch, launched in August 2023 at a cost of Rs 250 crore, is expected to finish by September this year. However, even before the completion of the first phase, officials of the Tamil Nadu State Highways Department have reportedly been planning to install toll plazas. This decision has come under fire, especially as the State Government has been advocating for the removal of toll plazas on national highways in Tamil Nadu, a stand now seen as contradictory. "The government cannot have double standards. On one side, they oppose tolls on national highways, but here they are trying to toll a state road built using public money," said R Selvaraj, a local trader in Madampatti. "This road is meant to decongest our city, not to burden us with fees." The Western Ring Road project traverses 15 revenue villages in the district, eventually connecting Mylkal on the Salem-Cochin Road (SHU 52) to Narasimhanaickenpalayam on the Nagapattinam-Gudalur-Mysore Road (NH 67). The second phase, covering 12.10 km from Madampatti to Somayampalayam, via Vadavalli, is estimated to cost Rs 348 crore, with tender processes set to begin after fund allocation. The third and final phase, spanning 8.09 km, will pass through Pannimadai, Nanjundapuram, Kurudampalayam, and Gudalur.


News18
an hour ago
- News18
Did ICICI Bank Try To Acquire HDFC? What Deepak Parekh Reveals
Last Updated: 'I remember you talking to me said ICICI started HDFC. 'Why don't you come back home?' That was your offer,' Parekh said in interaction with Ex-ICICI CEO Chanda Kochhar. ICICI Bank once tried to merge housing finance firm HDFC with itself before its reverse merger with its own banking arm, HDFC Bank former chairman Deepak Parekh has revealed. In a YouTube video, Parekh, in an interaction with ICICI Bank former MD & CEO Chanda Kochhar, said, 'I remember you talking to me once…you said that ICICI started HDFC. 'Why don't you come back home?' That was your offer." However, Parekh said he declined the offer, saying 'it won't be fair or proper with our name and the bank and all". He also said the HDFC Bank-HDFC reverse merger, which was completed in July 2023, was primarily driven by regulatory pressure. 'The RBI supported us and they pushed us into it to some extent and they helped us…there were no concessions, no relief, no time, nothing but they helped us to go through the process and get the approval," Parekh said. On the reverse merger, Parekh called it 'a sad day and a happy day". He added, 'It's good for the institution. It's good for the country to have large banks. Look at how large Chinese banks are. We have to be bigger, larger in India." Describing the merger as good for the institution, he said, it is good for the country to have large banks. Indian banks must grow through acquisitions to become stronger in future, he added. HDFC Ltd, the parent entity of HDFC Bank, merged with its banking subsidiary to create the country's biggest private sector lender. The merger became effective from July 1, 2023. With the reverse merger, the 44-year-old institution HDFC Ltd faded into memory lane. Interestingly, the creation of HDFC Ltd was financially supported by erstwhile ICICI Ltd, the parent entity of ICICI Bank. The Reserve Bank of India had classified large NBFCs like HDFC, which then held assets exceeding Rs 5 lakh crore, as systemically important — well above the Rs 50,000-crore threshold. (With Inputs from PTI) First Published: