MPAJ awaits green light to demolish Highland Towers
An aerial view of Highland Towers in Hulu Kelang. — Filepic
A DECISION on whether the remaining blocks of Highland Towers in Hulu Kelang, Selangor, can be demolished is expected in two months.
The Ampang Magistrate Court is set to deliver its decision on July 25.
Ampang Jaya Municipal Council (MPAJ) filed for a court order last year to proceed with the demolition of two long-abandoned blocks.
MPAJ deputy president Hasrolnizam Shaari said the local council must wait for the court's ruling.
'Once the court delivers its verdict, MPAJ has to inform the state government.
'Only after receiving the state government's input can MPAJ move forward,' he said after chairing the local council's monthly full board meeting at Menara MPAJ in Pandan Indah yesterday.
Hasrolnizam says MPAJ must wait for court's ruling.
Last year, MPAJ initiated the process to demolish the remaining blocks, following multiple complaints from neighbouring residents.
Then president Dr Ani Ahmad had said MPAJ would issue a notice to the property owners to demolish the structures.
She had also said due process would be carried out according to Sections 87, 88 and 89 of the Street, Drainage and Building Act 1974 (Act 133).
These relate to nuisances (Sections 87 and 88) and demolition of a house unfit for habitation (Section 89).
At the time, she said the demolition was estimated to cost between RM6mil and RM7mil.
On Dec 11, 1993, one of the three Highland Towers blocks collapsed, killing 48 in the nation's worst housing tragedy.
Residents of the two remaining towers were evacuated for safety reasons and eventually, the area was abandoned.
In 2018 then Housing and Local Government minister Zuraida Kamaruddin said the site would be turned into a recreational park after demolition of the remaining towers, as the area was unsuitable for any structure.
However, this failed to materialise.
Separately, Hasrolnizam said RM7.5mil had been set aside for upgrading and maintenance works this year, as part of MPAJ's people-centric development approach.
He said the allocation aligned with the recent assessment tax revision, which saw an increase in rates.
'Some of the planned projects include upgrading food courts and markets, as well as maintaining facilities at recreational areas,' he said.
Selangor local government and tourism committee chairman Datuk Ng Suee Lim had recently instructed all local councils to improve infrastructure and services with the increased revenue.
Ng added that local councils had been directed to carry out between five and 10 short- and long-term projects as part of the revision.
In addition to MPAJ's funds, Hasrolnizam said a total allocation of RM25mil from state and Federal governments would be used to support various improvement projects.
This includes RM20.3mil under the Malaysian Road Records Information System allocation.
He said part of a RM4.8mil allocation from the Federal Government would be used for 21 projects to construct new bus-stops and pedestrian walkways.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Star
2 days ago
- The Star
Ampang Jaya pocket park to benefit six neighbourhoods
The new recreational park in Taman Cahaya features a children's playset and jogging track. A NEW recreational park in Taman Cahaya, Ampang Jaya in Selangor, has received approval from its surrounding community. The park on Jalan Cahaya 12 was constructed by Ampang Jaya Municipal Council (MPAJ) with a RM500,000 Housing and Local Government Ministry allocation. A resident of the nearby Bella Vista apartments, KC Tan, said it was a good decision to have a park just next to the property. 'There aren't many open spaces where people can gather and relax in this area, so this park is a welcomed addition,' said Tan who has lived in Bella Vista for over a decade. The new park features a children's playset and jogging track. A Taman Cahaya resident, who only wanted to be known as Sabariah, said while she welcomed the park, more seating was needed. 'There is plenty of open space and walking paths, but not enough places to sit, especially for senior citizens like me.' Sabariah, who has been visiting the park daily with her grandchildren since it opened, said benches and shaded seating would make it more comfortable and accessible to all age groups. MPAJ Zone 8 councillor Datuk Yap Wee Seng said residents from at least six neighbourhoods could enjoy the park facilities. They include Taman Cahaya, Taman Dagang, Taman Cahaya Indah, Taman Cempaka, Taman Nirwana and Kampung Baru Ampang. 'There is a lack of public parks in these mature areas. 'Finding spaces where a new green space could be built was difficult,' said Yap. 'This site used to be idle land as it was also near high-tension cables,' he said, recalling that residents had suggested it be turned into a park. He said MPAJ managed to complete construction of the almost 1ha park in six months. 'Hopefully, we will be able to identify more spaces that can be turned into pocket parks,' he added. In a media statement, MPAJ said the construction of the park was part of its ongoing efforts to enhance community infrastructure and improve access to recreational and leisure facilities within its jurisdiction. It also reaffirmed its commitment to providing comfortable, community friendly public spaces that promoted a healthy lifestyle for all. Bukit Antarabangsa assemblyman Mohd Kamri Kamaruddin, who is also Selangor Deputy Speaker, MPAJ deputy president Hasrolnizam Shaari and Youth, Community and Landscape Department director Mohamad Yusuf Sulaiman visited the park.


The Star
05-06-2025
- The Star
Control pollution to keep Sungai Klang clean, local councils told
Sungai Klang passes through five local authorities. — Filepic LOCAL councils that border or have parts of Sungai Klang passing through their jurisdictions must prioritise pollution control to preserve the river's ecological health, an exco member says. Selangor local government and tourism committee chairman Datuk Ng Suee Lim urged all local authorities with waterways feeding into Sungai Klang to tackle sources of pollution, including industrial waste within their boundaries. 'We can achieve a clean Sungai Klang if all local councils implement effective pollution control measures. 'It must be done to protect aquatic life, safeguard water resources and ensure long-term sustainability of the ecosystem,' Ng said at a press conference after launching the 'Love Sungai Klang' mini convention at Bukit Raja Hall in Klang. He said it was necessary for Ampang Jaya Municipal Council (MPAJ), Subang Jaya City Council, (MSBJ), Petaling Jaya City Council (MBPJ) and Shah Alam City Council (MBSA) to address sources of pollution. Ng says concerted effort needed from all local councils. 'Most of the floating rubbish end up downstream through Klang Royal City Council's (MBDK) borders. 'We cannot leave it to MBDK alone to deal with river pollution, a concerted effort is needed.' The 120km Sungai Klang flows from Hulu Gombak to the Straits of Malacca near Port Klang. Within MBDK's administrative area, the river passes five housing areas and 11 villages. Klang mayor Datuk Abd Hamid Hussain said 'Love Sungai Klang' was a community-based programme aimed at involving riverside residents in the clean-up. 'We have involved all communities living along Sungai Klang, even school students,' SMK Methodist ACS Klang teacher Geetha Arunasalam, who attended the event with four students, said it helped to create awareness among the younger generation. SK (1) Simpang Lima teacher Kavita Subramaniam, who brought four pupils, said recycling was a priority.


The Star
03-06-2025
- The Star
Underground cables delay Pandan Indah bridge works
View of ongoing work for the vehicular bridges connecting Jalan Pandan Mewah and Jalan Pandan Utama.— LOW BOON TAT/The Star A TRAFFIC dispersal project involving the construction of two vehicular bridges at Pandan Indah in Ampang, Selangor is expected to be completed by the end of the year. Ampang Jaya Municipal Council (MPAJ) said the project completion date was extended following the discovery of underground utility and telecommunication cables. Upgrading and construction works include the building of the bridges over Sungai Kerayong, piling and traffic light upgrades. MPAJ deputy president Hasrolnizam Shaari said the project that started in August last year was 50% completed. 'There were many utility pipes and cables that needed to be relocated before the construction could proceed, which resulted in a three-month extension. Hasrolnizam says traffic management measures are being implemented at the site. 'However, there are no full road closures in the area. 'To ensure safety and smooth progress of construction, traffic management measures including possible diversions, are being implemented at the site.' Hasrolnizam said MPAJ, in collaboration with the state government, aimed to reduce congestion at the busy intersection. StarMetro previously reported that the current traffic level of service (LOS) was grade F, but was expected to improve to grade D once the RM9.3mil project was completed. LOS refers to traffic flow designated by letter grades from A (free flow) to F (near gridlock). StarMetro's report on July 17, 2024. Grade D reflects 'steady traffic at high density'. A 100m stretch of Jalan Pandan Utama will have a lane share system during the construction period. Alternative routes include Jalan Pandan Muhibbah, Jalan Bunga Mawar 4 and Jalan Pandan Mewah.