logo
Bulk Buys: Calls for Aussie green iron grow, but we're missing the crucial ingredient

Bulk Buys: Calls for Aussie green iron grow, but we're missing the crucial ingredient

News.com.au01-06-2025

Green iron has become a major talking point in Australian political circles
But the biggest handbrake on the nation-building industry could, ironically, be Australia's raw materials
Cyclone Metals is blazing a trail in the space at Canada's Iron Bear project
Recent weeks has seen a re-emergence of a long-running debate in Australian mining and the political landscape around it.
Do we continue to dig it and ship it, selling our iron ore and coal to China in a network that makes us the quarry for the world's dominant steelmaker?
Or can we revive a long crippled manufacturing sector at home, saving the world from an industry responsible for 8% of global carbon emissions by becoming producers of green iron at home.
One barracker, the Rod Sims chaired Superpower Institute, claimed in a report last week that we could turn the $120bn iron ore export industry into a $386bn green iron export sector by 2060.
They've called for government intervention to make it happen.
That includes a production tax credit to supplement a proposed credit designed to make green hydrogen production $2/kg or below, equivalent to a carbon price of $170/t.
Other recommendations are to support shared infrastructure, a green hydrogen certification scheme, grants that can support 15% of capital cost on top of an already announced $1bn green iron investment fund, up to $500m for projects producing 0.5Mt of steel or more a year, and a host of more general recommendations to support global carbon pricing initiatives.
Industry backers
The push for domestic green iron has come from business quarters as well, notably Andrew Forrest and his iron ore giant Fortescue (ASX:FMG), which is building a 1500tpa pilot plant at its green energy hub at Christmas Creek, at the same time as it dials back investments in its much touted hydrogen division amid a backdrop of economic uncertainty.
Forrest himself has laid out warnings that Australia's iron ore exports could be at risk of losing their crown as ore grades slide and high-grade African deposits like Simandou come online.
It's a curious position given Fortescue' own iron ore, sans its Iron Bridge magnetite mine, is among the lower grade products on the market, with some variations.
Lower grade iron ore can work in concert with higher grade products in the blast furnaces that dominate the steel market in China and emerging player India, since it is typically blended to reach an optimal blend for the steel mill, based on market prices for steel and various inputs including iron ore and coal.
China has stated its intention to reduce emissions from the steel sector, regularly promoting capacity swaps that involve the retirement of older factories for newer ones with better emissions profiles.
It has largely done that via the development of electric arc furnace plants that need scrap steel to operate. There are some limitations there – recycled steel isn't great for high-end products like cars or high-tech equipment, while blast furnace lives remain relatively young.
The plants, which use coal as the reductant to convert iron ore into crude steel, will remain in operation for decades yet.
The easiest way to reduce steel emissions in billion tonne a year producer China is therefore higher iron ore grades with lower impurities, which require less coal and energy to produce the same steel tonne.
To really curb emissions you need a direct reduced iron plant, which tends to operate with natural gas as the reducing agent. Theoretically, this process could be emissions free if that gas can be swapped out for hydrogen, something which has been studied for a while in Europe.
But there's a bigger limitation. Australia has great stores of natural gas and abundant wind and solar resources to power a hypothetical hydrogen production process.
However, it's the very specific grade of iron ore needed to produce DRI steel that will be the blocker.
Australian iron. ore producers ship hematite, which has a high (but in the Pilbara's case declining) grade in the ground. But it is magnetite concentrates, which need to be beneficiated to deliver higher grades with lower impurities to the market, that are key for DRI.
"With abundant high-grade iron ore resources and processing facilities, countries like Brazil, Canada and Sweden are better positioned for this transition. If it wants to remain competitive, Australia must focus on developing its magnetite iron ore sector," IEEFA energy finance analyst Sorough Basirat warned.
"Over the past two decades, several large-scale concentrate plants have been launched to supply high-grade feedstock, along with two smaller-scale pelletising operations. Despite significant investment, however, these projects have often been plagued by delays, budget blowouts and operational setbacks.
"Australia must act swiftly to remain competitive. Green iron is more critical to Australia than to any other country, given that iron ore is its leading export and that the country is the world's largest iron ore exporter.
"The clock is ticking for Australia. Major miners must accelerate their efforts and adopt viable solutions quickly, or Australia risks missing out on this once-in-a-generation opportunity."
Global potential
That doesn't mean there aren't already Australian companies waking up to these changing tides.
Cyclone Metals (ASX:CLE) this year sewed up a deal for Brazil's Vale, producer of around 60% of the iron ore globally suitable for DRI steelmaking.
In recent times DR pellets assessed by Fastmarkets have nabbed a premium of around US$50/t over the prevailing price of 65% Fe iron ore, which itself runs a premium to the commonly quoted 62% Fe price – the latter is currently US$95.80/t.
Cyclone Metals owns the 16Bt Iron Bear magnetite complex in Canada's Labrador Trough, one of the few places known to produce magnetite of the purity required to have DRI potential.
With Vale in line to spend US$138m proving it up for an eventual 75% stake, it's one of the few deposits on the ASX with genuine potential to join the ~125Mtpa market for DR grade iron ore.
"We've got a resource and we've done variability test work, so we've got results which for all intents and purposes is the easiest resource to upgrade to the DR grade that we're aware of," Cyclone CEO Paul Berend said.
"(Rio Tinto's) IOC has got something a bit similar and they're about 250km from us, but they're much, much smaller in size and Vale is able to make DR pellets from much lower grade material from their southern system."
That is proprietary to Vale, something Berend says shows developing DR grade iron ore projects in Australia is not outside the realm of possibility.
But Iron Bear's mineralogy has given the project a leg up. Unlike blast furnaces, where impurities are extracted and separated in a slag, DRI plants need extremely low silica levels in their feedstocks.
"When you see a silica floating below 1.5% you're getting into the zone. The Fe grade of a pellet is around 66% because you add things into pellets, you add bentonite and other stuff, binders," Berend said.
"The Fe grade goes down, but it's misleading. It's the concentrate that you need to look at.
"And even if you do get a concentrate, which has Fe and the silica which are the two things that you need to worry about, you still have to be able to get to the compression strength and the porosity, which not all orebodies, and enable you to do."
Still an opportunity
That doesn't mean Australia can't join the movement towards DRI.
"Australia has a challenge with the ores, but has a huge advantage in terms of energy costs. So that's a very interesting situation for us to be in," Berend said, noting that Australia like other locations that host DR plants like the Middle East has its own sources of natural gas and renewable energy.
"And I would invest very heavily in processing because there's lots and lots of iron ore in Australia, people haven't looked at the magnetite deposits in the way they should. And I'm sure there's clean magnetite deposits out there that we could find."
Magnetite ores with higher grades and lower impurities will save emissions in traditional blast furnaces as well, Berend noted.
"There's a challenge here Australia because if we don't interact together we're going to miss the boat for the next generation of ores," he said.
"People get distracted by this siren of let's try and do zero carbon steel. It makes no difference to the footprint for the planet of steelmaking.
"We can do green steel in Western Australia, but it will still be a very marginal thing for the next century or 50 years. And whilst it's interesting and we should do it, the bigger picture is decarbonise the steel industry by having cleaner raw material baskets, cleaner coal, cleaner iron ore. Immediate impact."
Cyclone and Vale recently completed phase 4 of the met testwork at Iron Bear, producing 2.3t of DR grade concentrate at 71% Fe and 1.2% silica with low deleterious elements, along with 3.5t of blast furnace concentrate and, critically, 260kg of direct reduction pellets grading 68.4% Fe and 1.5% silica.
A scoping study is due by the end of June.
Elsewhere across the ASX there are a host of other magnetite hopefuls.
In WA Gina Rinehart's Hancock Prospecting is still working on studies into a deposit in the Pilbara known as Hardey and in the Yilgarn in a partnership with Hawthorn Resources (ASX:HAW) and Indian-backed Legacy Iron Ore (ASX:LCY).
In South Australia Magnetite Mines (ASX:MGT) continues to hold the Razorback project near the long-running but clouded SIMEC Mining operation. In the Pilbara and Mid West are the long-established Sino Iron and Karara Mining operations, while in Tasmania, Grange Resources (ASX:GRR) operates the small Savage River mine, where an underground development to extend its life is in the works.
Falling iron ore prices appear to have scuttle the Southdown development proposed by Grange in WA's Great Southern region, while in Hawsons Iron (ASX:HIO) continues to plug away in NSW.
In Africa, AKORA Resources (ASX:AKO) is targeting the development of its 2Mtpa Bekisopa project in Madagascar, which unlike most magnetite projects can be upgraded to grades similar to the iron ore produced in WA's Pilbara with simple beneficiation.
That means it can be developed as a low-cost DSO operation, costing just US$60.6m to establish and with capital payback in 1.8 years according to a recent PFS.
FID is expected in mid-2026 with the first shipment due in Q3 2027 if all goes to plan.
MD Paul Bibby said on the release of the March PFS that further drilling could confirm additional mine life beyond the initial 6 years, with the long-term vision of building a high-grade concentrate operation beyond the initial DSO project.
According to assessments of the port capacity at Toliara, minimal upgrades would be needed to support Bekisopa's anticipated Stage 2 green steel iron concentrate product handling of a nominal 5Mtpa rate.
What about coal?
While iron ore prices have been relatively stable this year in the face of weak steel industry profits and macroeconomic uncertainty, coal has suffered dearly.
Prices of US$187/t for the top-grade Queensland coking coal don't seem too bad until you factor in the much higher cost base for incumbent miners since the pandemic, and the fact most producers don't actually realise that benchmark price.
Thermal coal is even more sold off, down at around US$103/t after a couple of mild northern winters.
Experts don't think met coal prices, in particular can stay so far into the cost curve forever.
Speaking to Stockhead last week, Precision Funds Management's Dermot Woods said it was just a matter of time before the market moved for its key pick in the space, Whitehaven Coal (ASX:WHC).
" If you take how hard it is to get a project off the ground in any commodity and then multiply that by all the green tape around getting a coal asset up anymore," he said.
" We're sort of bemused that people aren't willing to pay more of an option premium for something like Whitehaven, which is making OK money at the moment.
"If you can compare and contrast to lithium, which also isn't working at the moment, but the price is going down and down and the coal price is level.
" People are pricing in this coal price forever, whereas they're pricing severe mean reversion back to sort of US$12-1500 ... on lithium.
" I don't think that the average person understands how much costs have gone up in the coal space or what the real all in sustaining costs are there.
" I don't think there's a lot of people making much money in coal at the moment, so it's a matter of time to – and you never know when these prices happen – but until coal runs really hard."

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Victorian build-to-rent landlords dodge new minimum lease terms
Victorian build-to-rent landlords dodge new minimum lease terms

News.com.au

timean hour ago

  • News.com.au

Victorian build-to-rent landlords dodge new minimum lease terms

The Victorian government has quietly backed away from a plan to set minimum 12-month lease terms for thousands of Melbourne rentals. A proposed change to the Land Tax Act 2005 would have removed a deduction offered to build-to-rent operators from January 1 next year, unless they set the minimum lease term. Industry groups challenged the plan, citing research showing that between 10 and 30 per cent of tenants signing on for leases in the city's tenants-only complexes had specifically sought shorter terms. They also warned removing the tax benefit could have impacted attracting much needed development to build more rental homes across Melbourne. The city is currently Australia's capital for build-to-rent apartments, which effectively replace mum and dad investor landlords with corporate groups and super funds. Earlier this week the Victorian government acknowledged 1000 build-to-rent apartments had been built in the 2023-2024 financial year, with a further 18,200 under construction. The changes requiring the minimum term were removed from the State Taxation Acts Amendment Bill 2025 just prior to its passage into parliament late this week. In 2020 the Victorian government created a tax benefits program for build-to-rent projects that has helped it to become the nation's top destination for developers planning such builds. It is understood the decision to remove the minimum terms requirement is subject to further discussion with the property industry. Property Council of Australia Victorian executive director Cath Evans said the change was vital to accommodate a wide range of renters including couples separating, people working interstate for short periods, families completing home renovations who needed the flexibility of shorter leases. 'So we were very pleased to see the government took our advice and has amended the policy as it went through,' Ms Evans said. She added that with the change maintaining stability for the build-to-rent sector, it was hoped more operators would be willing to undertake developments in the space and help boost the supply of new homes for tenants in Melbourne. 'There is a significant need to grow the BTR sector further as part of our broader need to deliver more homes for Victorians,' Ms Evans said. 'A more competitive property taxation regime is critical across all parts of the housing market to keep investment flowing and delivering the homes our communities urgently need.' Build-to-rent projects typically cater for Melbourne's higher-priced rental market, with many operators charging more than $800 a week for two-bedroom residences, but offering significant levels of luxury ranging from pools and gyms to podcasting and work-from home spaces around the complexes. With operators typically seeking to engage tenants long term, leases of up to three years are not uncommon where would-be residents are seeking security. Traditional residential tenancies do not currently have minimum lease terms, with most set at one year before rolling over to a month-by-month arrangement — or being renewed for another 12 months. Tenants Victoria chief executive Jennifer Beveridge said they would be speaking with the government further about creating more stability and security for tenants. 'The government have said they want to consult more with renters, and we'll be calling for more availability of longer term options,' Ms Beveridge said. 'Build-to-rent properties are built for the express purpose of remaining rental homes. We should take this opportunity to give people real security to stay there and make homes in them.'

End of an era as Bunbury rollerskating rink set to close
End of an era as Bunbury rollerskating rink set to close

ABC News

time2 hours ago

  • ABC News

End of an era as Bunbury rollerskating rink set to close

Finances and challenges with remote management are forcing one of Western Australia's last remaining purpose-built rollerskating rinks to close its doors. Bunbury's The Rink opened in 1999 and has since churned out some of Australia's best skaters, including the country's top male artistic skater Andrew Beattie. However, co-owners Susan Brooks and Ozzy Kilgallon, who both live in Perth, have announced the business will close on June 30. The building in Davenport, Bunbury's industrial area, is being advertised as "a great investment opportunity" with offers now being accepted. The announcement of the venue's closure is already being felt across Bunbury, particularly for those who compete in the sport. Denice Seymour, recently named WA's 2025 State Champion in the Masters Ladies Figures division, has been skating at the Bunbury venue since it opened 26 years ago. Her daughter, son and granddaughter have all skated there as well. "Having The Rink here in Bunbury was the best thing because I wasn't missing out on what I absolutely loved doing," Seymour said. Seymour will compete in the 2025 Australian Roller Sports National Artistic Championships in July. However, she was fearful the Bunbury rink closure would mark the start of the end of her career. "I've been trying to picture my life without skating and I don't know, it's hard," Seymour said. "It concerns me for the future of skating here because where are people going to go? The venue opened 26 years ago when Susan Brooks, an artistic skating coach, saw an opportunity to transform an old indoor volleyball centre. She co-owns the Bunbury venue with Ozzy Kilgallon, who also runs the Morley Rollerdrome in Perth. He told the ABC "changing circumstances" led to the decision to sell the building. "Finances were one factor, but the other one was having management from here was proving more difficult than expected," Mr Kilgallon said. "We weren't going forward, we weren't going backwards, but down the track, rates come in, insurance goes up and if we couldn't keep it affordable for families, it couldn't exist. "In the end, we decided it's in our best interest to sell the building, and The Rink business goes along with that." June 29 will be the venue's final public skate session, with the Artistic Skating Club to continue using the site until it is purchased. Mr Kilgallon said he could not thank the community enough for their support over the last 26 years.

Noosa on a green mission as businesses and council voluntarily ban single-use coffee cups
Noosa on a green mission as businesses and council voluntarily ban single-use coffee cups

ABC News

time2 hours ago

  • ABC News

Noosa on a green mission as businesses and council voluntarily ban single-use coffee cups

The Queensland beachside town of Noosa has voted to phase out disposable coffee cups in the region despite the council lacking the power to enforce a ban. Noosa Shire Council this week adopted a plan to encourage a voluntary, industry-led transition away from single-use cups and remove them from council headquarters. A rubbish audit in 2023 found coffee cups accounted for about 20 per cent of litter items in bins at Noosa Main Beach. Many of these cups are lined with plastic and cannot be recycled. Councillor Amelia Lorentson brought the motion to Thursday's council meeting saying it was important for the council to lead by example to reduce landfill. She said she was inspired to raise the issue following the recent Noosa Eat and Drink Festival. "No-one had anything except reusable cups," she said. The event was organised by businessman Ben Clarke whose Noosa cafe supports transitioning away from single-use, plastic coffee cups. "He's leading the charge. It's voluntary and it's industry-led," Cr Lorenston said. "We're just enabling these sorts of programs where the industry shows other cafe operators how to transition out of coffee cups." The motion passed four votes to three and the council believed it to be the first such initiative in Queensland. In December, the small town of Bermagui on the NSW South Coast adopted a similar approach. The majority of cafes there have joined forces to eliminate disposable coffee cups from their businesses. Customers who do not have their own vessels pay a $3 deposit for a recycled reusable cup. That deposit is refundable at any of the other participating cafes. Some Noosa councillors questioned the relevance of trying to stop cafes from using disposable cups when the council lacked the authority to force businesses to adopt the measure. Councillor Tom Wegener said that the motion did not have the "meat and bones" to make a difference. Cr Lorenston respectfully disagreed. "There are coffee shops that are already doing this," she said. Cr Lorenston said the volume of plastic and litter at Noosa Beach following ex-tropical cyclone Alfred inspired the motion. "The motion was about empowering and encouraging businesses," she said. "The responsibility lies with all of us residents and also our visitors. "I've got my little keep-cup coffee cup that sits in the car all the time." Griffith University consumer behaviour expert Graeme Hughes said the success of the initiative would depend on its simplicity and the buy-in from local businesses. "It does necessitate those cafes to support this," he said. "If there's any friction in that process consumers are not going to be happy and find other solutions. "If there was an early incentive of a 50 cent reduction in your morning coffee that's a win-win scenario." Dr Hughes said the reusable cups were "quite trendy" a few years ago and the movement needed a "reinvigoration".

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store