
Over 20pct of Frontken shareholders oppose share issuance mandate
KUALA LUMPUR: More than one in five of Frontken Corp Bhd's voting shares were cast against granting the board authority to issue new shares at its annual general meeting (AGM) on Thursday, reflecting unease over potential equity dilution.
In a filing with Bursa Malaysia, the company said it received 78.8 per cent shareholder approval for the mandate, which allows the board to issue up to 10 per cent of its issued capital without prior shareholder approval until the next AGM.
The 21.2 per cent dissent, amounting to over 233.9 million shares, was the highest level of opposition among the six resolutions tabled.
According to an earlier AGM notice, Frontken viewed the mandate as a tool to respond swiftly to funding needs for working capital or potential investments. However, it clarified that no share issuance was currently planned.
"At this juncture, there is no decision to issue any additional share. If there should be a decision to issue any new share after the general mandate is sought, the company will make an announcement," the notice stated.
The proposal to renew the company's authority to buy back up to 10 per cent of its own shares also passed, with 86.7 per cent voting in favour and 13.3 per cent against, a narrower margin compared to other resolutions.
The RM50 million buy-back mandate will be funded through retained profits or borrowings. As of end-2024, Frontken had RM33.7 million in retained earnings, according to its share buy-back statement.
The company repurchased just over 1.1 million shares from the open market in March, bringing its total treasury shares to over 8.3 million. The buy-back was positioned as a tool for managing capital, stabilising the share price and rewarding shareholders.
Meanwhile, two other resolutions saw modest but notable pushback, with nearly five per cent voting against both the proposed directors' fees and benefits of up to RM600,000, and the re-election of Ng Chee Whye as a board member.
The reappointment of the company's auditors was backed by 99.1 per cent of voting shares, while the re-election of Koh Huey Min saw similarly strong support, with nearly 99 per cent in favour.
Frontken specialises in surface engineering and precision cleaning for the semiconductor, oil and gas, power, petrochemical and marine industries.
As at 3.19pm, Frontken's shares rose 0.77 per cent or three sen to RM3.95, with 882,800 units traded. This valued the company at RM6.03 billion. Year-to-date, the stock has fallen 10.86 per cent.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Straits Times
5 hours ago
- New Straits Times
Govt sets up committee to fast-track rural development projects in Sarawak
BETONG: The Rural and Regional Development Ministry has set up a Project Monitoring and Coordination Committee, chaired by its Deputy Minister Datuk Rubiah Wang, to ensure smoother implementation of rural development projects in Sarawak. Deputy Prime Minister and Rural and Regional Development Minister Datuk Seri Dr Ahmad Zahid Hamidi said the committee was formed after the ministry identified delays and technical issues affecting several projects, including problems related to land status. "The establishment of this committee was the result of a ministry-level decision, following the discovery that several projects were facing implementation challenges, particularly involving unresolved land ownership or status issues," he said. He was speaking to the media after officiating the groundbreaking ceremony for the construction of a road from Kampung Kupang to Simpang Jalan Bajau in Rumah Rengan, Saratok, today. He said coordination between federal and state agencies was crucial to expedite the implementation of projects, especially those involving allocations of less than RM50 million. "As decided by Prime Minister Datuk Seri Anwar Ibrahim, projects worth less than RM50 million will be handed over to the state government for implementation. "This requires close coordination and we at the ministry will continue to provide full support to the state government in its implementation," he said. Under the committee, Zahid said the scope of work for projects being implemented in Sarawak which currently cannot be changed due to several constraints will be done under the 13th Malaysia Plan (13MP). "Currently, this is under the responsibility of the state government and although we have several constraints to change the scope, it is not impossible in the 13MP if we can discuss in detail the joint implementation between the state government and the federal government," he said. Reviewing the infrastructure development in Sarawak, he praised the state government's initiative in building coastal roads which not only connect the route to the Pan Borneo Highway but also play an important role in connecting longhouses and traditional villages. One of the areas of responsibility for this coordination committee is to build a road connecting longhouses and traditional villages so that we do not face what is called denial syndrome by various parties, but it is better for the benefit of the people to do this coordination," he added. "This is also part of the ministry's responsibility and this is the main role of this coordination committee, which is to prevent the existence of 'denial syndrome' among stakeholders," he said. He added that effective coordination will ensure that the planned development truly benefits the people, especially in the interior areas. Meanwhile, the construction of the road involves upgrading the existing main road connecting Kampung Kupang and Simpang Jalan Bajau, from a gravel road to a paved road according to the JKRR2 Standard, with an estimated length of 16.9 kilometres. It also involves upgrading the existing connecting road to the JKRR1 standard leading to the school and longhouse, namely: Jalan Cabang 1 to SK Sungai Entebu, 86 metres long, Jalan Cabang 2 to Rumah Anau, 86 metres long 100 metres, Jalan Cabang 3 to Rumah Lakon, 1,175 metres long, Jalan Cabang 4 to Rumah Rabiah, 1,646 metres long, construction of five reinforced concrete bridges, drainage systems, culverts, road pavement and shoulder as well as installation of road signs and road fixtures. The project, which began in January for RM112.9 million, is expected to be completed in September 2027.


Malaysian Reserve
6 hours ago
- Malaysian Reserve
Tengku Zafrul: Intel, Vishay set to expand semiconductor presence in Malaysia
THE Ministry of Investment, Trade and Industry (MITI) has held discussions with leading tech giant, Intel, regarding the latter's plans on reinvestment and expansion of its operations in Malaysia. Minister Tengku Datuk Seri Zafrul Abdul Aziz said Intel has invested RM50 billion to-date, and provided employment opportunities to 12,300 local workers. 'Intel's presence in Malaysia since 1972 has grown in tandem with the country's rise as a global semiconductor hub. 'This meeting reflects Intel's continued confidence in Malaysia as its key investment destination outside the United States,' he said in a post on the social media platform X today. He added that the Malaysian government, through MITI and the Malaysian Investment Development Authority (MIDA), remains fully committed to supporting Intel's expansion in the country. 'Under the New Industrial Master Plan 2030 (NIMP2030), and the National Semiconductor Strategy (NSS), we will continue to strengthen a sustainable and competitive industrial ecosystem,' Tengku Zafrul said. Meanwhile, in a separate post, the MITI minister said a United States-based manufacturer of discrete semiconductors and passive electronic components, Vishay Intertechnology, has expressed its intention to expand its operations in Malaysia. 'They already have a presence in Melaka, and the rise in the number of high-tech semiconductor facilities is in line with the objectives of NIMP2030 and NSS,' he added. Tengku Zafrul had led a working visit to Washington, United States, on June 18-20. — BERNAMA


The Sun
7 hours ago
- The Sun
Intel, Vishay set to expand semiconductor presence in Malaysia
KUALA LUMPUR: The Ministry of Investment, Trade and Industry (MITI) has held discussions with leading tech giant, Intel, regarding the latter's plans on reinvestment and expansion of its operations in Malaysia. Minister Tengku Datuk Seri Zafrul Abdul Aziz said Intel has invested RM50 billion to-date, and provided employment opportunities to 12,300 local workers. 'Intel's presence in Malaysia since 1972 has grown in tandem with the country's rise as a global semiconductor hub. 'This meeting reflects Intel's continued confidence in Malaysia as its key investment destination outside the United States,' he said in a post on the social media platform X today. He added that the Malaysian government, through MITI and the Malaysian Investment Development Authority (MIDA), remains fully committed to supporting Intel's expansion in the country. 'Under the New Industrial Master Plan 2030 (NIMP2030), and the National Semiconductor Strategy (NSS), we will continue to strengthen a sustainable and competitive industrial ecosystem,' Tengku Zafrul said. Meanwhile, in a separate post, the MITI minister said a United States-based manufacturer of discrete semiconductors and passive electronic components, Vishay Intertechnology, has expressed its intention to expand its operations in Malaysia. 'They already have a presence in Melaka, and the rise in the number of high-tech semiconductor facilities is in line with the objectives of NIMP2030 and NSS,' he added. Tengku Zafrul had led a working visit to Washington, United States, on June 18-20.