logo
Egypt expands LNG infrastructure with new regasification agreements

Egypt expands LNG infrastructure with new regasification agreements

Egypt Today16-03-2025

CAIRO – 16 March 2025: Egypt's Minister of Petroleum and Mineral Resources, Karim Badawi, recently held discussions with Steven Kobos, CEO of the U.S.-based LNG solutions company Excelerate Energy, to explore leasing floating storage and regasification units (FSRUs).
Their talks focused on strengthening Egypt's LNG sector through technical collaboration and trade partnerships, according to a ministry statement.
In addition to this initiative, a government delegation will travel to Germany later this month to finalize a lease agreement for another regasification unit.
Egypt is also preparing to sign an agreement with Cyprus to lease an FSRU that will be stationed in the country to help meet peak energy demand during the summer.
The government is further expanding its regasification capacity in the Red Sea and Ain Sokhna.
Currently, two regasification vessels are docked in the Red Sea, and plans are in place to bring a third unit to Ain Sokhna by June 2025.
Additionally, a fourth unit from Turkey is expected to be operational this summer, reinforcing Egypt's energy security strategy and boosting its LNG infrastructure.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

PM Madbouly tours national gas center, oversees arrival of new LNG vessel
PM Madbouly tours national gas center, oversees arrival of new LNG vessel

Egypt Today

timean hour ago

  • Egypt Today

PM Madbouly tours national gas center, oversees arrival of new LNG vessel

Cairo – June 22, 2025: As part of an official tour on Saturday, Prime Minister Mostafa Madbouly visited the National Control Center overseeing Egypt's natural gas network to assess the country's preparedness for increased energy consumption during the summer months. The facility, managed by GASCO, plays a crucial role in distributing gas nationwide and safeguarding supply to key sectors such as electricity generation, manufacturing, and residential use. During the visit, the Prime Minister received detailed briefings on the center's operational capabilities, including its contingency systems and its ability to manage inflows of imported liquefied natural gas (LNG). In a related stop, Madbouly also toured the Energos Eskimo, a newly docked floating regasification vessel at Ain Sokhna Port, which is set to contribute to expanding the nation's LNG import infrastructure. The vessel is part of a government plan to deploy four such ships to enhance LNG import capacity. The Energos Eskimo, the second vessel of its kind after Hoegh Galleon entered service last year, will be transferred to a specially prepared berth at SUMED Port in Sokhna, capable of handling 750 million cubic feet of gas per day. Madbouly described the project as a reflection of Egypt's commitment to energy security and its proactive approach to managing seasonal demand peaks. Petroleum and Mineral Resources Minister Karim Badawi, who accompanied the Prime Minister, confirmed that a second berth at SUMED has been equipped with loading arms and pipelines connecting to the national gas network. Technical preparations for the vessel's integration into the system are expected to conclude within days. Badawi emphasized that the flexibility and resilience of the gas grid allow the state to adapt quickly to supply challenges and maintain reliable service. At the control center, officials from GASCO and EGAS highlighted the use of real-time monitoring systems and simulation software to manage national gas flows and anticipate consumption spikes. The network also coordinates continuously with the national electricity grid to ensure stable power generation, particularly during high-demand summer months. Madbouly praised the strategic approach taken by the petroleum sector, noting its ability to respond swiftly to crises such as the COVID-19 pandemic and global supply disruptions caused by the war in Ukraine. He also welcomed updates on the state's broader LNG strategy, which includes two additional FSRUs currently being prepared at Ain Sokhna and Sonker terminals, and a fourth vessel scheduled to arrive in Damietta this August. Together, the four vessels will bring an additional 2.25 billion cubic feet of gas per day into Egypt's supply mix. Badawi noted that these imports were secured through strategic negotiations with countries such as Jordan and Germany, leveraging Egypt's diplomatic relationships to ensure energy stability amid global market volatility. The petroleum minister concluded the tour by reaffirming that, alongside LNG imports, the government continues to invest in boosting domestic production. Exploration and development efforts are being ramped up, and recent measures to attract investment and stabilize partner payments are expected to gradually reverse natural production declines.

Madbouly reviews LNG infrastructure readiness at Ain Sokhna Port
Madbouly reviews LNG infrastructure readiness at Ain Sokhna Port

Daily News Egypt

time13 hours ago

  • Daily News Egypt

Madbouly reviews LNG infrastructure readiness at Ain Sokhna Port

Prime Minister Mostafa Madbouly visited Ain Sokhna Port on Saturday to inspect the liquefied natural gas (LNG) regasification vessel Energos Eskimo, as part of the government's broader efforts to bolster energy security and ensure the continuity of natural gas supplies. At the start of his tour, the Prime Minister emphasised that the government is taking proactive steps to meet Egypt's natural gas needs by expanding infrastructure capacity for receiving imported LNG. Madbouly noted that the initiative aims to enhance the efficiency and flexibility of the national gas supply system to accommodate rising domestic demand, particularly during the summer months, and in response to recent regional developments following the Israeli military operation in Iran. He stated that these measures fall within a comprehensive governmental plan involving relevant ministries to safeguard the stability of the national power grid. Accordingly, the government aims to have three regasification vessels operational by early July, with a combined capacity of 2,250 million cubic feet per day. A fourth vessel will be kept on standby to provide additional support and ensure the availability of various petroleum products, Madbouly added. During his inspection of the Energos Eskimo vessel, the Prime Minister underscored that these strategic projects reflect the state's commitment to securing natural gas supplies and reinforcing the system's resilience during peak consumption periods in the summer. He highlighted that this vessel is the second of its kind stationed at Ain Sokhna Port, following the Hoegh Galleon, which entered service last year under the government's plan to operate four regasification vessels and expand LNG import capacity. Madbouly also reviewed the advanced technical works being finalised by Petrojet, a subsidiary of the petroleum sector, in preparation for the vessel's transfer to the SUMED port dock in Sokhna. The Energos Eskimo has a design capacity of 750 million cubic feet of gas per day. Minister of Petroleum and Mineral Resources Karim Badawi explained that petroleum sector teams have completed the development of a second berth at the SUMED Port to receive the vessel. This includes the installation of two loading arms and pipelines for transferring gas to the national grid. Badawi noted that the teams are working with high efficiency and speed to complete the required technical works, with ongoing field inspections to ensure timely progress. The Minister further highlighted the proactive steps taken by the Ministry since last year to secure gas supplies, diversify sources, and manage emerging challenges. He noted that the Ministry succeeded in contracting three LNG regasification vessels following a phase of political and commercial negotiations with various governments—leveraging Egypt's strong diplomatic ties with countries such as Jordan and Germany. These vessels were secured by the Egyptian Natural Gas Holding Company (EGAS) amid high global demand, as part of a broader strategy to achieve energy security in the face of geopolitical risks and global instability. The combined capacity of the three vessels stands at 2,250 million cubic feet per day, significantly enhancing Egypt's domestic gas supply capabilities to meet the needs of all consumer sectors. One vessel is currently operational at SUMED Port, while preparations are underway to commission the remaining two at the SUMED and Sonker terminals in Ain Sokhna. Badawi added that a fourth regasification vessel is scheduled to arrive in August and will be operated at Damietta Port on the Mediterranean Sea, further strengthening the resilience and diversification of Egypt's energy supply in the face of ongoing global challenges. The Minister also stressed that, alongside the urgent plan to cover local demand through LNG imports, the government is intensifying efforts to boost domestic natural gas production. He cited recent successes in curbing natural production decline by introducing incentive packages to attract investment and ensuring the timely payment of dues to partners. These actions are expected to gradually increase output, as exploration and production activities pick up momentum. During his tour aboard the Energos Eskimo, Madbouly received a technical briefing from Walid Lotfy, Chairperson of Petrojet, on the modifications and readiness efforts under way. Lotfy confirmed that the implementation timeline had been compressed from 29 days to just 10, thanks to round-the-clock work and intensified efforts. The works included mechanical modifications, control system adjustments, and commissioning tests to ensure the vessel's full readiness to receive LNG and convert it into its gaseous form for integration into the national grid.

OPEN// PM starts tour at Ain Sokhna port to follow up importing natural gas
OPEN// PM starts tour at Ain Sokhna port to follow up importing natural gas

Middle East

timea day ago

  • Middle East

OPEN// PM starts tour at Ain Sokhna port to follow up importing natural gas

CAIRO, June 21 (MENA) - Prime Minister Moustafa Madbouli asserted on Saturday that the Egyptian government is actively working to secure the country's natural gas needs by enhancing the infrastructure required to receive imported liquefied natural gas (LNG). This move aims at boosting the efficiency and flexibility of Egypt's gas supply system to meet the growing domestic demand, particularly during the high-consumption summer months, he added. This came during an inspection tour on Saturday at Ain Sokhna port where Madbouli emphasized that these efforts are part of a broader, integrated package of measures being implemented by various ministries to ensure the stability of the national electricity grid. He particularly highlighted the importance of energy security in light of recent regional developments, notably the Israeli military operation in Iran. During the visit, Madbouli inspected the LNG regasification vessel Energos Eskimo, reflecting the government's commitment to strengthening energy security and ensuring the sustainability of gas supplies. He was accompanied by Petroleum and Mineral Resources Minister Karim Badawi. Madbouli revealed that Egypt is set to operate three regasification vessels starting from July. He also announced that a fourth regasification vessel would be held in reserve as a contingency measure to ensure continued availability of petroleum products and enhance national energy security. (MENA) M H K/Y R E

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store