
Gerik crash: Operator's licence of tour bus company terminated, says Loke
SHAH ALAM: The tour bus company involved in the tragic crash in Gerik, Perak, which claimed the lives of 15 Universiti Pendidikan Sultan Idris (UPSI) students, has had its operator's licence terminated, said Transport Minister Anthony Loke.
"First of all, the company's operator's licence has been terminated. Many people misunderstand and think we only revoked the permit for the vehicle," he said after a briefing on Speed Limitation Devices (SLD) for heavy vehicles at Scania Malaysia's factory in Bukit Jelutong Industrial Park today.
Loke said that there is a distinction between a vehicle permit and an operator's licence, the former applies to individual vehicles, while the latter covers the entire company. Termination of the licence effectively grounds all vehicles under the company's operations.
He said the same action was taken in the Teluk Intan crash involving a gravel lorry and a Federal Reserve Unit (FRU) truck.
"Firstly, the operator's licence was terminated. Secondly, we will take the owner of the company to court. This is a criminal case," said Loke.
However, he added that the families of victims may also pursue civil proceedings for compensation.
On Wednesday, Loke announced that all permits held by the tour bus company involved in the Gerik crash had been revoked with immediate effect following multiple breaches of permit conditions.
He said the company had committed two major violations, leasing its operating permit to a third party, and failing to activate the vehicle's GPS tracking system.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Star
4 hours ago
- The Star
KLIA aerotrain to resume service
Loke: It will undergo several more tests before operations start on July 1 SEPANG: After a hiatus of more than two years, passengers travelling through Terminal 1 of the KL International Airport (KLIA) will only have to wait nine more days before they can use its signature aerotrain to get from the main terminal building to the satellite terminal building, and vice versa. The aerotrain replacement project, which is currently in its final testing phase, is set to begin operations on July 1. Transport Minister Anthony Loke said it will undergo several more tests over the coming days, including an emergency response plan test together with the relevant authorities. 'If everything goes well, it will begin operations at 10am on July 1,' said Loke when giving the media a preview of the aerotrain service here yesterday. He said there will be three train sets on deck, with two operating concurrently during peak hours. During off-peak hours, or between 12am and 5am, only one train will operate to allow maintenance works to be carried out. Each train has three carriages and can ferry 270 passengers at one time. Testing it out: Loke and Izani (second from left) using the aerotrain at KLIA. — YAP CHEE HONG/The Star 'With the return of the aerotrain, we hope passengers will feel more comfortable in their transit between the main terminal and satellite buildings,' Loke said, adding that the shuttle bus services that were deployed as a stop-gap measure will continue for a while even after the aerotrain resumes service. Loke also expressed hope that the aerotrain's return will improve KLIA's service and image. 'There will be more Asean meetings coming up in the next few months, with another summit to be held at the end of the year. '2026 is also a major year as we are organising Visit Malaysia 2026 and the aerotrain is a vital part of preparations here,' he said. On the series of delays in the resumption of aerotrain services, Loke said it was to ensure safety is made priority. According to Malaysia Airports Holdings Bhd (MAHB), the aerotrain has now entered its final stage of testing. This comes following the successful completion of the critical fault-free run (FFR) and final detailed inspection by the Land Public Transport Agency. Under the FFR testing, the first train was required to complete 2,000km of continuous fault-free operations, while the remaining two trains logged 1,000km each. 'This ensures all three trains are fully commissioned and that the system's built-in redundancy is in place for live operations,' it said. MAHB managing director Datuk Mohd Izani Ghani, who was also present, said the airport is now in the final stretch of preparations. 'Our volunteers are also participating in trial runs to simulate passenger movements,' he said. The aerotrain, which came under public scrutiny for frequent breakdowns, had its services suspended in March 2023. There was an episode where the train stopped midway from the main terminal building and the satellite building. A second train was deployed to retrieve the stranded passengers, but the rescue train also experienced technical difficulties, resulting in passengers having to complete the journey on foot.


The Sun
5 hours ago
- The Sun
KLIA aerotrain set to resume service on July 1
SEPANG: The long-awaited aerotrain service at KL International Airport (KLIA) will resume on July 1 at 10am, more than a year after it was suspended due to aging infrastructure and safety concerns. Transport Minister Anthony Loke announced its reopening yesterday following a successful trial run and inspection at KLIA Terminal 1. 'We are now in the final phase of testing. Several more tests will be conducted in the coming days, including a major emergency response plan drill involving Malaysia Airports Holdings Berhad (MAHB) staff and emergency services. 'If all goes smoothly, the aerotrain service will resume as scheduled.' Loke acknowledged the frustrations faced by travellers but stressed that safety must take precedence. 'As much as I wanted the service to restart earlier, all necessary tests had to be completed and approved by the Land Public Transport Agency.' Originally targeted for a Q1 2025 relaunch, the project was delayed to May, and eventually to July. Loke said the delay was due to extended safety testing and system fine-tuning, not any critical faults. The upgraded aerotrain, consisting of three connected compartments with a capacity of 90 passengers each, can carry 270 passengers per trip. 'Two train sets will operate simultaneously during peak hours, with a third train set on standby as backup. During non-peak or engineering hours, between midnight and 5am, only one train will operate to allow for maintenance.' He said the aerotrain is designed to offer a more seamless, comfortable and efficient transit experience as part of ongoing efforts to elevate KLIA's service standards. He added that although the aerotrain is returning, the shuttle bus service introduced during its suspension would remain in operation for now. 'Until the aerotrain service fully stabilises, we will continue running the buses to ensure uninterrupted service.' The resumption of service comes at a pivotal time as Malaysia prepares to host a series of Asean meetings and summits. 'It also aligns with preparations for Visit Malaysia Year 2026, which is expected to see a surge in international arrivals. 'This upgrade is part of our broader plan to ensure KLIA remains a world-class gateway to Malaysia. We want to provide a positive first impression for international visitors.' The project is being implemented under strict oversight from the Land Public Transport Agency, which required the system to undergo a rigorous validation process. The first train was required to complete 2,000km of continuous fault-free operations while the other two trains logged 1,000km each. This testing ensured that all three trains are fully commissioned and the system's built-in redundancy is ready for live operations. MAHB managing director Datuk Mohd Izani Ghani said the airport is now in the final stretch of preparations. 'This includes testing our emergency response plan to ensure that we are ready for any eventuality. 'Our volunteer employees are also participating in live trial runs to simulate passenger movement and help us fine-tune operations. 'It's a system that requires seamless integration across multiple components, all of which must meet stringent safety and performance standards set by the regulator.' He expressed gratitude to the Land Public Transport Agency and the Transport Ministry for their close oversight and support, and to contractor Alstom and its consortium partners for delivering the project within budget. The aerotrain replacement project began in 2022 as part of a three-year infrastructure upgrade at KLIA. The overhaul was deemed necessary after the original trains, in service since the airport's opening in 1998, suffered frequent breakdowns.


The Star
a day ago
- The Star
Electric Train Service set to boost Johor tourism
JOHOR BARU: The Electric Train Service (ETS) that is expected to be fully completed by August will significantly boost the tourism industry here, says Tourism Malaysia. Deputy Director General (Promotion) Datuk Musa Yusof said the timing of the ETS completion aligns well with preparations for Visit Malaysia 2026. "The ETS will connect Johor Baru directly to Kuala Lumpur, which will strengthen the industry, especially in terms of tourist movement. "It will allow visitors to travel between these two places in about three and a half hours, enabling them to visit more locations. "If they stay the night for cultural events such as this, it will also help increase hotel occupancy rates," he said. He added that the spillover effects of the ETS, which has reached Segamat since March, are already visible. "We can already see Segamat benefiting from this, especially during the durian season," he said at a press conference after officiating a Gawai and Kaamatan Festival celebration at a hotel here. In March, Transport Minister Anthony Loke stated that two sets of ETS trains from China were expected to arrive in April and would be operational by August after undergoing necessary trials. He mentioned that the trains, along with another eight sets, are being assembled in Batu Gajah, Perak, and will complete the southern route of the line, following the start of the ETS service at Segamat station in Johor on 15 March. 'We don't have to wait for all 10 sets to start operating; we will use whichever set is completed. "For Gemas to Johor Baru, there will be three phases - Phase 1 to Segamat, Phase 2 to Kluang, and Phase 3 to JB Sentral,' he said after travelling on the ETS from KL Sentral to Segamat station in March.