
Kobo Resources Intersects 21.5 m at 1.14 g/t Au and 20.0 m at 1.41 g/t Au at the Jagger Zone and Files FY 2025 Financial Results
QUEBEC CITY--(BUSINESS WIRE)--Kobo Resources Inc. (" Kobo' or the " Company") (TSX.V: KRI) is pleased to announce additional diamond drill results from the ongoing exploration program at its 100%-owned Kossou Gold Project (' Kossou ') in Côte d'Ivoire. Results from the Jagger Zone continue to confirm broad zones of mineralisation and extend the footprint of gold-bearing structures along strike and at depth.
Diamond Drill Results – Highlights:
Jagger Zone:
Edward Gosselin, CEO and Director of Kobo commented: 'These latest results reinforce the scale and continuity of gold mineralisation at the Jagger Zone. We are encouraged by the width and tenor of the intercepts, which continue to validate our structural model and further support our systematic exploration approach at Kossou. With drilling still underway across our other high-priority targets, we are well-positioned to advance Kossou toward its maiden resource estimate next year as our exploration work continues.'
Jagger Zone Drilling Highlights Scale and Continuity
Results from seven diamond drill holes (KDD0080 to KDD0086), completed on sections JZ 525 to JZ 725 within the Jagger Zone, have been received and continue to expand the Company's understanding of this highly prospective target (see Figure 1).
Gold mineralisation is hosted within and along the contacts of quartz feldspar porphyry and diorite intrusions, as well as within sheared contacts of basaltic massive and pillowed flow units. These structures define significant, laterally and vertically continuous gold-bearing zones that are traceable along strike and down dip. Notably, wide mineralised intervals in hole KDD0084, including 8.0 m at 1.41 g/t Au from 88.0 m and 21.5 m at 1.14 g/t Au* from 106.0 m (see Figure 2), demonstrate the presence of multiple stacked gold zones across the broader Jagger Shear Zone.
On section JZ 700, gold mineralisation continues to demonstrate strong continuity and consistent geological associations observed in earlier drilling. Notable intercepts include 20.0 m at 1.41 g/t Au* from 106.0 m, including 5.0 m at 3.70 g/t Au, and 7.0 m at 1.20 g/t Au from 154.0 m. These results support the broader interpretation of the Jagger Shear Zone as a robust, multi-zone gold system and correlate well with previously reported drill holes and surface trench KTR030a (see Figure 3 for Section JZ 700.)
Geological and Structural Setting of Gold Mineralisation at Kossou and the Jagger Zone
Gold mineralisation at Kossou is hosted within a N-S trending, steeply west-dipping deformation corridor associated with the regional Contact Zone Fault, which separates basaltic volcanic flows from volcano-sedimentary rocks. Within this corridor, the 'Jagger Shear Corridor', brittle-ductile shear zones act as the primary structural controls on gold emplacement, particularly where lithological contrasts occur between basaltic units and intrusive rocks, including diorite and quartz-feldspar porphyry dykes.
At the Jagger Zone, the main shear system is developed within a zone approximately 70-m wide and is closely associated with intrusive contacts. Drill core analysis has identified multiple quartz vein generations related to mineralisation. The V1 vein set consists of quartz veins and veinlets parallel to the S1 foliation, commonly occurring within the main shear zones and bearing gold. The dominant mineralized structures, however, are V2A veins, which trend west-northwest to northwest and are prominent both within and adjacent to the shears. A secondary vein set, V2B, is characterized by sub-horizontal hairline fractures and veinlets, which carry only sporadic gold mineralisation.
Drilling to date indicates that gold mineralisation pinches and swells along strike and at depth, consistent with structurally controlled orogenic gold systems commonly found within the Birimian terrane of West Africa.
An accurate dip and strike and controls of mineralisation are unconfirmed at this time and the true width of mineralisation are unconfirmed at this time. Drill holes are planned to intersect mineralised zones perpendicular to interpreted targets. All intercepts reported are downhole distances.
The Company also reports the filing of its audited consolidated financial statements for the twelve-month period ended March 31, 2025, and related management's discussion and analysis. Copies of these financial statements and related management's discussion and analysis can be found on the Company's issuer profile on SEDAR+ at www.sedarplus.ca as well as on the Company's website at www.koboresources.com.
Sampling, QA/QC, and Analytical Procedures
Drill core was logged and sampled by Kobo personnel at site. Drill cores were sawn in half, with one half remaining in the core box and the other half secured into new plastic sample bags with sample number tickets. Core samples are drilled HQ to below oxidation level and then is reduced to NQ for the remainder of the drill hole. Samples are transported to the SGS Côte d'Ivoire facility in Yamoussoukro by Kobo personnel where the entire sample was prepared for analysis (prep code PRP86/PRP94). Sample splits of 50 grams were then analysed for gold using 50g Fire Assay as per SGS Geochem Method FAA505. QA/QC procedures for the drill program include insertion of a certificated standards every 20 samples, a blank every 20 samples and a duplicate sample (split of the 1 m original sample) every 20 samples. All QAQC control samples returned values within acceptable limits.
Review of Technical Information
The scientific and technical information in this press release has been reviewed and approved by Paul Sarjeant, P.Geo., who is a Qualified Persons as defined in National Instrument 43-101. Mr. Sarjeant is the President and Chief Operating Officer and Director of Kobo.
About Kobo Resources Inc.
Kobo Resources is a growth-focused gold exploration company with a compelling new gold discovery in Côte d'Ivoire, one of West Africa's most prolific and developing gold districts, hosting several multi-million-ounce gold mines. The Company's 100%-owned Kossou Gold Project is located approximately 20 km northwest of the capital city of Yamoussoukro and is directly adjacent to one of the region's largest gold mines with established processing facilities.
With over 15,000 metres of diamond drilling, nearly 5,900 metres of reverse circulation (RC) drilling, and 5,900 metres of trenching completed since 2023, Kobo has made significant progress in defining the scale and prospectivity of its Kossou's Gold Project. Exploration has focused on multiple high-priority targets within a 9+ km strike length of highly prospective gold-in-soil geochemical anomalies, with drilling confirming extensive mineralisation at the Jagger, Road Cut, and Kadie Zones. The latest phase of drilling has further refined structural controls on gold mineralisation, setting the stage for the next phase of systematic exploration and resource development.
Beyond Kossou, the Company is advancing exploration at its Kotobi Permit and is actively expanding its land position in Côte d'Ivoire with prospective ground, aligning with its strategic vision for long-term growth in-country. Kobo remains committed to identifying and developing new opportunities to enhance its exploration portfolio within highly prospective gold regions of West Africa. Kobo offers investors the exciting combination of high-quality gold prospects led by an experienced leadership team with in-country experience. Kobo's common shares trade on the TSX Venture Exchange under the symbol "KRI'. For more information, please visit www.koboresources.com.
Twitter: @KoboResources | LinkedIn: Kobo Resources Inc.
NEITHER THE TSXV NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSXV) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
Cautionary Statement on Forward-looking Information:
This news release contains 'forward-looking information' and 'forward-looking statements' (collectively, 'forward-looking statements') within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as 'expects', or 'does not expect', 'is expected', 'anticipates' or 'does not anticipate', 'plans', 'budget', 'scheduled', 'forecasts', 'estimates', 'believes' or 'intends' or variations of such words and phrases or stating that certain actions, events or results 'may' or 'could', 'would', 'might' or 'will' be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to: general business, economic, competitive, political and social uncertainties; and the delay or failure to receive board, shareholder or regulatory approvals. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this news release. Except as required by law, Kobo assumes no obligation and/or liability to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Business Insider
5 hours ago
- Business Insider
TruGolf Announces Reverse Stock Split
Salt Lake City, Utah, June 18, 2025 (GLOBE NEWSWIRE) -- TruGolf Holdings, Inc. (NASDAQ: TRUG), a leading provider of golf simulator software and hardware, today announced that it filed an amendment to its amended and restated certificate of incorporation with the Secretary of State of the State of Delaware to effect a 1-for-50 reverse stock split of its Class A common stock. The reverse stock split will take effect at 12:01 am (Eastern Time) on June 23, 2025, and the Company's Class A common stock will open for trading on The Nasdaq Capital Market on June 23, 2025 on a post-split basis, under the existing ticker symbol 'TRUG' but with a new CUSIP number 243733409. As a result of the reverse stock split, every fifty shares of the Company's Class A common stock issued and outstanding prior to the opening of trading on June 23, 2025 will be consolidated into one issued and outstanding share. Proportionate adjustments will be made to the exercise prices and the number of shares underlying the Company's outstanding equity awards, as applicable, as well as to the number of shares issuable under the Company's equity incentive plans. The Class A common stock issued pursuant to the reverse stock split will remain fully paid and non-assessable. The reverse stock split will not affect the number of authorized shares of Class A common stock or the par value of the Class A common stock. No fractional shares will be issued if, as a result of the reverse stock split, a stockholder would become entitled to a fractional share because the number of shares of Class A common stock they hold before the reverse stock split is not evenly divisible by the split ratio. Instead, the stockholder will be entitled to receive a cash payment in lieu of a fractional share. As a result of the reverse stock split, the number of shares of Class A common stock outstanding will be reduced from approximately 40.5 million shares to approximately 0.8 million shares, and the number of authorized shares of Class A common stock will remain at 650 million shares. About TruGolf, Inc. Since 1983, TruGolf has been passionate about driving the golf industry with innovative indoor golf solutions. TruGolf builds products that capture the spirit of golf. TruGolf's mission is to help grow the game by attempting to make it more Available, Approachable, and Affordable through technology - because TruGolf believes Golf is for Everyone. TruGolf's team has built award-winning video games ("Links"), innovative hardware solutions, and an all-new e-sports platform to connect golfers around the world with E6 CONNECT. Since TruGolf's beginning, TruGolf has continued to attempt to define and redefine what is possible with golf technology. Forward-Looking Statements This news release contains certain statements that constitute 'forward-looking statements' within the meaning of the Private Securities Litigation Reform Act of 1995. Such statements that are not of historical fact constitute 'forward-looking statements' and accordingly, involve estimates, assumptions, forecasts, judgements and uncertainties. Forward-looking statements include, without limitation, the timing of the reverse stock split. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable as of the date made, expectations may prove to have been materially different from the results expressed or implied by such forward-looking statements. The Company has attempted to identify forward-looking statements by terminology including ''believes,'' ''estimates,'' ''anticipates,'' ''expects,'' ''plans,'' ''projects,'' ''intends,'' ''potential,'' ''may,'' ''could,'' ''might,'' ''will,'' ''should,'' ''approximately'' or other words that convey uncertainty of future events or outcomes to identify these forward-looking statements. These statements are only predictions and involve known and unknown risks, uncertainties, and other factors. Any forward-looking statements contained in this release speak only as of its date. The Company undertakes no obligation to update any forward-looking statements contained in this release to reflect events or circumstances occurring after its date or to reflect the occurrence of unanticipated events. More detailed information about the risks and uncertainties affecting the Company is contained under the heading "Risk Factors" in the Company's Annual Report on Form 10-K and subsequently filed Quarterly Reports on Form 10-Q and Current Reports on Form 8-K filed with the SEC, which are available on the SEC's website,


Business Insider
5 hours ago
- Business Insider
TruGolf to Participate in the '2025 Virtual Tech Conference: Discover the Innovations Reshaping Tomorrow' Conference Presented by Maxim Group LLC on Wednesday, June 4th at 3:00 PM EDT - (Updated)
Salt Lake City, Utah, June 03, 2025 (GLOBE NEWSWIRE) -- TruGolf Holdings, Inc. (NASDAQ: TRUG), a leading golf technology company, announced today that Brenner Adams, TruGolf's Chief Growth Officer will present at the '2025 Virtual Tech Conference: Discover the Innovations Reshaping Tomorrow,' presented by Maxim Group LLC, tomorrow, June 4 th at 3:00 PM EDT. The Conference will be live on M-Vest. To attend, follow this link to register for this virtual event. About TruGolf Holdings TruGolf is a golf technology company, committed to making golf, easy. From innovative uses for AI to build content and enhance its image and spatial analysis, to gamified golf improvement plans, TruGolf is an industry leader in the growing technological revolution in the sport of golf. Since its founding, TruGolf has redefined what is possible in golf through technology. TruGolf's suite of Hardware, Software, and Web Products make it easier to Play, Improve, and Enjoy the game of golf. Forward-Looking Statements Some of the statements in this release are forward-looking statements, which involve risks and uncertainties. Forward-looking statements include, without limitation, whether the Company's compliance plan will be accepted by Nasdaq and the Company's expected future cash needs. Although the Company believes that the expectations reflected in such forward-looking statements are reasonable as of the date made, expectations may prove to have been materially different from the results expressed or implied by such forward-looking statements. The Company has attempted to identify forward-looking statements by terminology including ''believes,'' ''estimates,'' ''anticipates,'' ''expects,'' ''plans,'' ''projects,'' ''intends,'' ''potential,'' ''may,'' ''could,'' ''might,'' ''will,'' ''should,'' ''approximately'' or other words that convey uncertainty of future events or outcomes to identify these forward-looking statements. These statements are only predictions and involve known and unknown risks, uncertainties, and other factors. Any forward-looking statements contained in this release speak only as of its date. The Company undertakes no obligation to update any forward-looking statements contained in this release to reflect events or circumstances occurring after its date or to reflect the occurrence of unanticipated events. More detailed information about the risks and uncertainties affecting the Company is contained under the heading "Risk Factors" in the Company's Annual Report on Form 10-K and subsequently filed Quarterly Reports on Form 10-Q and Current Reports on Form 8-K filed with the SEC, which are available on the SEC's website,


Business Upturn
7 hours ago
- Business Upturn
LEADING EDGE MATERIALS REPORTS QUARTERLY RESULTS TO APRIL 30, 2025
By GlobeNewswire Published on June 21, 2025, 02:30 IST LEADING EDGE MATERIALS REPORTS QUARTERLY RESULTS TO APRIL 30, 2025 Vancouver, June 20, 2025 – Leading Edge Materials Corp. ('Leading Edge Materials' or the 'Company') (TSXV: LEM) (Nasdaq First North: LEMSE) (OTCQB: LEMIF) (FRA: 7FL) announces results for the fiscal period ending April 30, 2025. All references to dollar amounts in this release are in Canadian dollars. Highlights During and After the Quarter During the three months ended April 30, 2025: • On February 9, 2025, the Company provided an update on a Rapid Development Plan ('RDP') for Norra Kärr, to be in production in the shortest possible timeframe, supplying HREE-rich eudialyte concentrate and industrial mineral nepheline syenite. • The Company provided an update on the value creation options being considered for Woxna Graphite, on February 16, 2025, including a possible restart of operations, the production of high-quality flake graphite concentrate. • On March 23, 2025, the Company provided a progress update on Norra Kärr, in the context of the European Commission's ('EC') Joint White Paper for European Readiness 2030, highlighting the increasing geopolitical competition over critical raw materials ('CRMs') and the need for the EU and its member states to build strategic reserves of raw materials. • On March 25, 2025, the EU announced its first list of Strategic Projects under the Critical Raw Materials Act ('CRMA'); Norra Kärr was not included. The Company stated its plan to reapply in the next round of applications. • On April 23, 2025, the Company announced granting of stock options (the 'Options') to directors, officers and consultants of the Company to purchase an aggregate of 6,850,000 common shares (the 'Optioned Shares') of the Company, at exercise price of C$0.24 per Optioned Share, expiring on the date that is 5 years from the date of grant for directors and officers and three years from the date of grant for consultants. The Options will vest 33% on the date of the grant, 33% one year after the date of grant and 34% two years after the date of grant. The Options were issued pursuant to the terms of the Company's Option Plan. Results of Operations Three Months Ended April 30, 2025, Compared to Three Months Ended January 31, 2025 During the three months ended April 30, 2025 ('Q2 2025') the Company reported a net loss of $1,179,168 compared to a reported net loss of $669,216 for the three months ended January 31, 2025 ('Q1 2025'), an increase in loss by $509,952, the increase in loss mainly due to share based compensation expenses of $585,529 (Q1 2025 – $129,292) and foreign exchange loss of $117,063 (Q1 2025 – gain $1,690). Three Months Ended April 30, 2025, Compared to Three Months Ended April 30, 2024 During the three months ended April 30, 2025 ('2025 period'), the Company reported a net loss of $1,179,168 compared to a net loss of $859,529 for the three months ended April 30, 2024 ('2024 period'), an increase in loss of $319,639, the increase in loss mainly due to share based compensation expenses of $585,529 (Q2 2024 – $349,923) and foreign exchange loss of $117,063 (Q2 2024 – $5,754). Selected Financial Data The following selected financial information is derived from the unaudited condensed consolidated interim financial statements of the Company prepared in accordance with IFRS. Fiscal 2025 Fiscal 2024 Fiscal 2023 Three Months Ended April 30,2025 $ January 31,2025 $ October 31,2024 $ July 31,2024 $ April 30,2024 $ January 31,2024 $ October 31,2023(Restated) $ July 31,2023(Restated) $ Operations Expenses (1,070,402) (696,037) (97,209) (797,070) (863,745) (660,617) (457,890) (309,832) Other items (108,766) 26,821 (222,820) (25,168) 4,216 (25,311) 195,209 (8,442) Comprehensive profit/(loss) (1,179,168) (669,216) (320,029) (822,238) (859,529) (685,928) (262,681) (318,274) Basic Profit/(loss) per share (0.01) (0.00) (0.00) (0.00) (0.01) (0.00) (0.00) (0.00) Diluted profit/(loss) per share (0.01) (0.00) (0.00) (0.00) (0.01) (0.00) (0.00) (0.00) Financial Position Working capital 1,191,514 2,198,641 3,337,686 3,973,458 1,610,635 2,316,098 2,713,098 848,952 Total assets 28,361,774 28,480,311 29,343,716 28,454,783 24,991,481 26,003,943 25,512,111 23,588,662 Total non-current liabilities (6,009,933) (5,596,369) (5,641,854) (5,683,545) (5,101,289) (5,489,843) (4,670,790) (5,109,575) Financial Condition / Capital Resources During the three months ended April 30, 2025, the Company recorded a net loss of $1,179,168 and, as of April 30, 2025, the Company had an accumulated deficit of $51,201,042 and working capital of $1,191,514. The Company maintains its Woxna Graphite mine in a 'production-ready' basis while minimizing costs. The Company is also evaluating a potential restart of flake graphite concentrate production. The Company anticipates that it has sufficient funding to meet anticipated levels of corporate administration and overheads for the ensuing twelve months however, it will need additional capital to provide working capital and recommence operations at the Woxna Graphite, to fund future development of the Norra Kärr project or to complete exploration activities in Romania. There is no assurance such additional capital will be available to the Company on acceptable terms or at all. In the longer term the recoverability of the carrying value of the Company's long-lived assets is dependent upon the Company's ability to preserve its interest in the underlying mineral property interests, the discovery of economically recoverable reserves, the achievement of profitable operations and the ability of the Company to obtain financing to support its ongoing exploration programs and mining operations. Outlook Concerns about critical raw materials – security of supply, supply chain resilience and defence requirements – have been recurring themes at conferences attended by the Company in recent months, with HREEs and natural graphite frequently mentioned; geopolitical uncertainties continue, with more talk about the weaponization of global trade in rare earth elements. On June 17, 2025, the G7 Critical Minerals Action Plan was announced focused on 'diversifying the responsible production and supply of critical minerals, encouraging investments in critical mineral projects and local value creation, and promoting innovation' in the G7, and with partners beyond, working together and 'to swiftly protect our economic and national security''. Against this backdrop and calls for more action to match the intent of the CRMA, the Company's portfolio is well positioned. Woxna Graphite Mine The Company maintains the Woxna Graphite Mine in a production-ready state while minimizing holding costs. An internal study completed in early 2022 assessed the potential for restarting operations and upgrading the processing plant to produce high-quality flake graphite concentrate. Work is now underway to update this study, forming the basis of a business plan to support possible project financing, customer prepayments, and access to Swedish or EU public funding, and, in addition. Highlighting Sweden's role in CRMs and graphite's importance, Sweden's Energy, Business and Industry Minister Ebba Busch recently stated that 'Sweden has unique opportunities to be and remain a strong player in global mineral politics. We have the most sustainable mining industry in the world – ethically sustainable, environmentally sustainable, and with good working conditions. The graphite that [Talga Group] is planning to produce is a key material in battery manufacturing and the green transition to a fossil-fuel-free society.' Norra Kärr Heavy Rare Earth Element ('HREE') Project As part of its Pre-feasibility ('PFS') workstreams, the Company is developing a Rapid Development Plan ('RDP') for Norra Kärr to enable the earliest possible production of HREE-rich eudialyte concentrate and industrial mineral nepheline syenite. A phased, small-scale start is under consideration to allow early access to the deposit, initial sales of nepheline syenite, early cash flow, and stockpiling of eudialyte concentrate for future processing. This approach is designed to reduce both risk and environmental impacts. Testwork has now been completed on nepheline syenite and aegirine to determine their mineralogy, chemical composition, and leachate chemistry. The promising results are being used to determine possible market segments and specifications that can be achieved, potential demand and pricing, to be included in an updated PFS economic model for Norra Kärr. The Company envisages the PFS will be completed in Q1 2026. On 24 March 2025, the EU announced its first list of Strategic Projects under the Critical Raw Materials Act (CRMA); Norra Kärr was not included. The Company plans to reapply in the next round of applications having continued to make significant progress since the last application was submitted in August 2024. In recent months, the Company's application for a new Exploitation Concession ('Bearbetningskoncession') 25-year mining lease has been out for consultation with County Administrative Boards ('CAB') and municipalities. The Company understands that CAB opinions have been received by the Mining Inspectorate ('Bergsstaten'). The Company will have an opportunity to respond to opinions and comments. Bihor Sud Nickel-Cobalt Exploration Project Exploration activities at the Bihor Sud project have continued, supported by the hard work of the four new geologists who joined the team in January. Works have included underground mapping, diamond drilling, geophysics, core logging, and sampling. The Company's goal remains to define a large-scale, mineable mineral resource; in gallery G2, targeting promising Zinc-Lead-Copper-Silver mineralization. Results to date are encouraging and underscore the project's strong potential for a significant polymetallic discovery. Financial Information The report for three months ending July 31, 2025, is expected to be published on or about September 19, 2025. On behalf of the Board of Directors, Leading Edge Materials Corp. Kurt Budge, CEO For further information, please contact the Company at: [email protected] Follow usTwitter: Linkedin: About Leading Edge Materials Leading Edge Materials is a Canadian public company focused on developing a portfolio of critical raw material projects located in the European Union. Critical raw materials are determined as such by the European Union based on their economic importance and supply risk. They are directly linked to high growth technologies such as lithium-ion batteries and permanent magnets for electric motors, wind turbines and defense applications. The portfolio of projects includes the 100% owned Woxna Graphite mine (Sweden), 100% owned Norra Kärr Heavy Rare Earth Elements project (Sweden), and the 51% owned Bihor Sud Nickel Cobalt exploration alliance (Romania). Additional Information The information was submitted for publication through the agency of the contact person set out above, on June 20, 2025, at 2:30 PM Vancouver time. Leading Edge Materials is listed on the TSXV under the symbol 'LEM', OTCQB under the symbol 'LEMIF' and Nasdaq First North Stockholm under the symbol 'LEMSE'. Svensk Kapitalmarknadsgranskning ('SKMG') is the Company's Certified Adviser for the Nasdaq First North Growth Market (Stockholm) and may be contacted via email [email protected] or by phone +46 (0)8 913 008. Reader Advisory This news release may contain statements which constitute 'forward-looking information', including statements regarding the plans, intentions, beliefs and current expectations of the Company, its directors, or its officers with respect to the future business activities of the Company. The words 'may', 'would', 'could', 'will', 'intend', 'plan', 'anticipate', 'believe', 'estimate', 'expect' and similar expressions, as they relate to the Company, or its management, are intended to identify such forward-looking statements. Investors are cautioned that any such forward-looking statements are not guarantees of future business activities and involve risks and uncertainties, and that the Company's future business activities may differ materially from those in the forward-looking statements as a result of various factors, including, but not limited to, fluctuations in market prices, changes in the Company's intended use of proceeds from the Private Placement, successes of the operations of the Company, continued availability of capital and financing and general economic, market or business conditions. There can be no assurances that such information will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. The Company does not assume any obligation to update any forward-looking information except as required under the applicable securities laws. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this news release. Attachments LEM – News Release Financial Results – April 30, 2025 Financial Report Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same. Ahmedabad Plane Crash GlobeNewswire provides press release distribution services globally, with substantial operations in North America and Europe.