logo
Silicon island link by 2028

Silicon island link by 2028

The Star07-06-2025

Building the future: The temporary steel bridge provides access for construction and infrastructure works on Silicon Island. — CHAN BOON KAI/The Star, Silicon Island Development Sdn Bhd
GEORGE TOWN: A 380m-long coastal bridge connecting the southern coast of Penang island to the emerging Silicon Island is expected to be ready by the end of 2028.
With four lanes in each direction, the bridge is designed to meet future transportation needs and support the development of the man-made island, which will house the proposed Mutiara Line Light Rail Transit (LRT) depot and Green Tech Park.
The bridge is also a key component of the Pan Island Link 2A (PIL2A), a strategic initiative aimed at improving connectivity between Silicon Island and the Sultan Abdul Halim Mu'adzam Shah Bridge.
Chief Minister Chow Kon Yeow, who disclosed this yesterday, said the contract for the bridge project had been awarded and construction will begin this month.
He said phase one is targeted for completion by mid-2027 to support the opening of Silicon Island's first operational factory, with full commissioning expected at the end of the following year.
'In the meantime, a temporary steel bridge has been built to provide access for construction and infrastructure works on Silicon Island, which now spans 64.75ha of the intended 931ha.
Phase One of the island with a total of 64.75ha reclaimed to date. — CHAN BOON KAI/The Star, Silicon Island Development Sdn Bhd
'It helps expedite the mobilisation of machinery and workers who used boats before this. This is a model development,' Chow said during a visit to the Silicon Island project site.
The visit included a preview of the designated areas for the Mutiara Line LRT depot and Green Tech Park, which are gradually taking shape.
Chow said work on the LRT project will begin once the Notice to Proceed is issued to SRS Consortium Sdn Bhd (SRS) in several weeks' time.
'Preliminary work, including soil testing and placement of infrastructure, are being carried out,' he added.
It was reported that construction of the Mutiara Line LRT would begin in the fourth quarter of 2026.
The 29.5km Mutiara Line, targeted for delivery in December 2031, will feature 21 strategically located stations to improve connectivity between the island and mainland.
Chow also said a new community facility, Medan Selera Matang, was being built in Permatang Damar Laut overlooking Silicon Island.
It will feature a village community management council hall, fishermen's one-stop service centre, food stalls, restaurants and storage sheds for fishermen.
For the initial water supply needs of Silicon Island, a suction tank and pump house will be built.
The total construction cost for the community facilities, pump house and suction tank is estimated at RM36mil.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Construction safety goes digital in Penang LRT project
Construction safety goes digital in Penang LRT project

The Star

time9 hours ago

  • The Star

Construction safety goes digital in Penang LRT project

With the Penang light rail transit (LRT) project, Mutiara Line, starting construction soon, Gamuda has come to town with its proven Safety, Health, and Environment (SHE) framework, which is powered by cutting-edge digital innovation. Having decades of experience in building mega infrastructures, the Malaysian construction giant has long developed comprehensive tech-driven safety protocols implemented across regional projects, including the completed Klang Valley Mass Rapid Transit (KVMRT) Kajang and Putrajaya Lines, the ongoing Sydney Metro West in Australia, and Singapore's Defu Station and Tunnels. The same proven award-winning SHE framework is now being implemented on the recently awarded Penang Mutiara Line. We hope this framework will contribute to efficient operations and the successful delivery of this much-anticipated LRT project for the residents of Penang. By integrating advanced technologies and fostering a culture of shared responsibility, Gamuda is not only building infrastructure but also safeguarding lives and the safety of workers, protecting Penang's communities and the environment, as well as reinforcing trust in the state's progress. Each worker has a unique QR code on their certification card and by scanning them, safety and health officers will instantly know if they are authorised to be on-site. This commitment ensures that the Mutiara Line will be a model of responsible construction, aligning with Penang's vision for sustainable urban development towards a vibrant and better-connected future, which promises enhanced mobility and economic growth. Safety tech for strong compliance Gamuda's approach to safety represents a significant change from reactive enforcement to proactive self-regulation, where all stakeholders share SHE responsibilities. Advanced technologies are integrated at every stage of its safety protocols in the Penang LRT project, from workers' training and site access to machinery inspections, monitoring, evaluation and measurement methodologies. This systematic and risk-based approach has delivered tangible results – a 75% reduction in Lost Time Injuries (LTI) in past projects compared to earlier project phases and industry benchmarks, demonstrating the effectiveness of the digital-first safety methodology. Project-specific safety training, digital passports for site entry Every individual, from long-term workers and personnel to short-term hires, must have basic safety training before setting foot on any of Gamuda's construction sites. This fundamental requirement is especially crucial given the local construction market's predominantly low-skilled labour force, making comprehensive safety training critical. Safety and health officers can regularly check machinery and temporary structures and get their safety status on the spot, minimising safety risks especially for high-risk activities. While basic training is a prerequisite for all who enter the site, the Penang LRT project sets itself apart from others by requiring further mandatory training for those working on high-risk activities, such as lifting and hoisting, scaffolding, or operating plant and machinery. This tiered approach ensures that the appropriate competency level matches the specific risks workers will encounter. To date, over 20,500 personnel have been certified through Gamuda's digitalised competency- based Safety Passport Scheme. Even workers holding a Construction Industry Development Board (CIDB) green card are required to attend a SHE Induction that covers legal requirements, policies, roles, risks, and best practices to obtain a blue card. For those engaged in high-risk activities, a grey card is mandatory. Meanwhile, supervisors, managers, and senior management are issued with the black card, a certification derived from the rigorous UK Site Management Safety Training Scheme module. The group has digitised its training and certification process, offering structured training at dedicated Training Centres and tablet-based assessments, with instant results upon completion and immediate re-test options. The training modules are mainly in Bahasa Malaysia, English and Chinese, while also covering multiple languages to cater for workers from Indonesia, Bangladesh, Pakistan, Nepal, Myanmar and Vietnam. Successful candidates are issued blue, grey, or black certification cards, each equipped with a unique QR code that functions as a digital passport. This digital passport scheme is integrated with AI-powered access control technology, ensuring that workers can only access areas for which they are certified. Consistent with its digital safety approach in regional projects like Australia, Singapore and Taiwan; all project and construction data are unified on a single dashboard. Delivering real-time, quick actionable insights for senior and project management teams. Safety and health officers can regularly check machinery and temporary structures and get their safety status on the spot, minimising safety risks especially for high-risk activities. Facial recognition and digital tracking of workers' competency All Gamuda construction sites, including those in the Penang LRT project, use Access Control Systems (ACS) with advanced facial recognition technology, similar to airport immigration checkpoint systems. Workers' facial data, certification status and relevant details are embedded within their QR code, ensuring only authorised personnel with the right skills and safety training can access work areas relevant to them and attend the daily Pre-Task Talks (PTT) before commencing their duties. The PTT, mandatory standard practice in the construction industry, are held before work begins to ensure all team members understand the day's tasks and the associated safety measures. What sets the process apart from other sites is that the workers' attendance in PTTs in the Penang LRT project is tracked digitally. Safety and Health Officers (SHOs) may conduct ad hoc checks on workers' validity by scanning their QR codes anytime and anywhere on the construction site, ensuring workers stay within certified work areas and as a result reduce accident risks at the sites. Higher accountability for machinery safety compliance via QR codes Another key safety feature introduced is the digital certification of all on-site equipment and machinery, resulting in a paperless project management. After a thorough inspection, each machinery used in the Penang LRT construction receives a QR code, which provides instant verification of safety compliance. These QR codes are generated via digital forms on the Autodesk Construction Cloud (ACC) platform. SHOs can quickly scan these QR codes during inspections, immediately flagging non-compliant machinery or temporary structures for rectification or removal, thus maintaining consistent safety oversight. Data-driven project management for efficiency and risk management Gamuda has introduced advanced digital tools to enhance project efficiency and accountability, namely Gamuda Digital Operating System (GDOS) and ACC. They consolidate data from various platforms into a unified, cloud-based ecosystem, creating fully paperless projects that enable robust governance and comprehensive record-keeping. This system enables real-time tracking of SHE statistics, contractors' progress, and facilitates issue resolution through prioritisation and heatmaps. This allows senior management to gain actionable insights for proactive safety management rather than reactive responses. GDOS and ACC also support modules for quality, safety, operations, and cost management. Carrot-and-stick approach to safety audits for subcons Gamuda's safety governance operates on a simple yet impactful principle- safety performance directly impacts payment schedules. Monthly safety audits form the backbone of this system, with subcontractors required to achieve minimum safety scores for their SHE Key Performance Indicators (KPIs). This 'carrot-and-stick' approach ensures the entire supply chain is financially incentivised to prioritise safety as a core objective, rather than treating it as an afterthought. Conversely, poor performance triggers structured escalation from initial observations to non-compliance reports, stop work orders, and ultimately, financial penalties. Furthermore, Gamuda addresses safety compromises before they occur by explicitly listing safety requirements as separate line items in the Bill of Quantities (BoQ). This approach prevents subcontractors from under-pricing safety measures during tender submissions – an unfortunate industry practice that often leads to corners being cut during project execution. In the long run, the practice should make safety an internalised culture for all contractors in the construction sector. Industry recognition and UK awards Over time, the Group's digital and systematic approach to safety has improved contractors' performance and worker competency. Most importantly, it has fostered a culture of shared ownership throughout its entire workforce and supply chain. Gamuda's safety practices have garnered industry recognition with commendations from the CIDB and Department of Occupational Safety and Health (DOSH) in Malaysia. These initiatives have been benchmarked internationally, having received multiple awards, including the National Occupational Safety and Health Award and international Distinction Awards from the British Safety Council for KVMRT projects.

PMX's decree to stop using imported stuff at gov't functions defies commonsense, gets bashed
PMX's decree to stop using imported stuff at gov't functions defies commonsense, gets bashed

Focus Malaysia

time9 hours ago

  • Focus Malaysia

PMX's decree to stop using imported stuff at gov't functions defies commonsense, gets bashed

'ANWAR seems to have really lost the plot – that's not just my personal observation but also the sentiment echoed across several of my circles,' observed industrialist/thinker khalid karim STEMKITA (@khalidkarim in a recent post on X referring to Prime Minister Datuk Seri Anwar Ibrahim. 'Even some of his once-loyal supporters are expressing deep disappointment. I'm disappointed but still hoping he can turn it around.' Anwar seems to have really lost the plot — that's not just my personal observation, but also the sentiment echoed across several of my circles. Even some of his once-loyal supporters are expressing deep disappointment. I am disappointed but still hoping he can turn it around — khalid karim STEMKITA (@khalidkarim) June 19, 2025 Without a shadow of doubt, PMX seems to be getting a lot of flak lately for a series of pronouncements that not only seem to defy logic but detached or out-of-touch with man-on-the-street Malaysians. First, Anwar who doubled up as the Finance Minister was chastised for referring to GST as 'general services tax' in wanting to impose 'a little more tax' on avocado which implies imported fruits as part of Malaysia's expanded Sales and Services Tax (SST) which takes effect on July 1. His latest decree? For official government functions to stop using imported food items in a bid to promote the use of local products. Anwar has directed all government departments to stop using imported goods, especially food, at official events in a bid to promote local — The Star (@staronline) June 20, 2025 For this, the reformist Madani government commander-in-chief found himself widely ridiculed for his instruction with many of his subjects pouring scorn on the Pakatan Harapan (PH) chairman's eureka moment. Many commenters on The Star's X feed wittily pointed out that even basic food items such as mee siam or cekodok pisang (literally, 'fried banana balls') would contain imported stuff. A very unimpressed Aunty Ana (@Ana_makhzan) counselled PMX to try doing some research before making such lofty pronouncements (in the future). '@anwaribrahim, @fahmi_fadzil. I hope this is a joke. Ask @MSabu_Official (for) we import onions, garlic and dried chillies, hence there're imported material in mihun goreng (fried rice vermicelli),' lectured the commenter. 'Even the cekodok made from local banana contains imported wheat flour. Next time do verify first before issuing an instruction.' One commenter even accused PMX of targeting Chinese fruit importers with this decree while another suggested that tapioca should be made a staple at parliamentary functions in accordance with the call by Dewan Rakyat speaker Tan Sri Johari Abdul to resort to ubi kayu than to merely rely on rice. Other commenters chided PMX for not leading by example. Just use local marques instead of fancy luxury car models or even to stop barring the use of Evian mineral water or to start serving musang king durian at government events. One commenter observed that this was the same modus operandi implemented when Anwar was the finance minister during the 1998 Asian Financial Crisis. The response was no less scathing on the X feed of Malaysiakini. Anwar larang makanan import dalam acara rasmi — Malaysiakini (BM) (@mkini_bm) June 20, 2025 One commenter wryly observed that there would be no more buah kurma (dates) which is almost standard at government buka puasa functions during the fasting month. This news was also seized upon by a few commenters as a stick to beat PMX on the scarcity of local rice issue. One commenter came up with a brilliant alternate suggestion to save costs – just have fewer official functions while another wished the Madani administration best of luck given most local fruits at seasonal while those which are not such as bananas, guavas and pomelos have limited production (or even costlier). The temperature is definitely rising with the disgruntled comments seem to indicate. Has the long struggle to claim Putrajaya to be defined by a tenure scarred by the costs-of-living crisis, exacerbated by the Madani administration's numerous taxes? Judging by the tone of many commenters, it would appear PMX's popularity has taken yet another beating. Nobody said it was an easy job to be the #1 man in the country but perhaps it is advisable for PMX to rely on scripted text than to speak off the cuff on unfamiliar or complicated subjects. – June 21, 2025 Main image credit: Anwar Ibrahim/Facebook

DBKL mulls patching potholes with plastic waste
DBKL mulls patching potholes with plastic waste

The Star

time10 hours ago

  • The Star

DBKL mulls patching potholes with plastic waste

Maimunah (third from left) looking on as Wan Mohd Fauzi shows a disabled parking bay that has been resurfaced with glass waste. — MUHAMAD SHAHRIL ROSLI/The Star KUALA Lumpur City Hall (DBKL) is considering using recovered plastics to fix potholes in the capi­tal in a bid to cut costs. Mayor Datuk Seri Maimunah Mohd Sharif said DBKL had carried out pilot tests in industrial areas to evaluate the material's durability. 'Compared to the commonly used material, namely bitumen, plastic is cheaper and more durable. 'We will implement this approach at facilities maintained by DBKL, such as playgrounds and bicycle lanes.' She said this after visiting Taman Tasik Titiwangsa to inspect several upgrading projects using recovered materials. Among these were parking bays which had been resurfaced using crushed glass. This was a project undertaken by a local start-up. The mayor said these projects were part of City Hall's push to­­wards green initiatives and sustainability. 'This is in line with our vision to make Kuala Lumpur a zero-waste city. 'We are not just planting trees, we are making active efforts towards sustainability,' she said. City Hall was hoping to reduce the amount of waste sent to landfills, she said. Maimunah said DBKL spent RM260mil a year on mana­ging waste, with 40% of that for collection costs. 'This is a huge cost which can otherwise go to­­wards upgrading markets and playgrounds.' Maimunah then elaborated on plans to designate some areas in Kuala Lumpur as zero-waste zones. On May 15, Minister in the Prime Minister's Department (Federal Territories) Datuk Seri Dr Zaliha Mustafa announced that busy spots in the capital would be earmarked for this purpose as part of a larger effort to reduce waste and make the capital more environmentally friendly. Maimunah said DBKL was work­­ing to identify local communities in Kuala Lumpur's 11 parliamentary constituencies for the initiative. 'We plan on collaborating with those who are actively working on recycling initiatives. 'We prefer to work with those who are willing participants, to ensure optimal results,' she said. Also present at the event were Ecocycle Dynamic Solutions Sdn Bhd director Datuk Seri Wan Mohd Fauzi Wan Kamaruddin and Renergy Bumi Hijau Sdn Bhd business development director Sumeshini Subra­­maniam.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store